Grid Ceiling | FSM1D
Luminaires must be installed by a qualied
electrician (check with local and national
codes for proper installation).
To prevent electrical shock, disconnect
electrical supply before installation or
servicing.
Contractor is responsible for adequately
reinforcing walls and/or ceilings to support
xture weight.
Focal Point, LLC accepts no responsibility
for inadequately reinforced walls and/or
ceilings.
The information contained in this drawing
is the sole property of Focal Point, LLC.
Any reproduction in part or whole without
the written permission of Focal Point, LLC
is prohibited.
POWER OFF
POWER ON
ATTENTION
SEE ADDITIONAL
INSTRUCTIONS
BEFORE YOU BEGIN COMPONENT KEY
INSTRUCTION KEY
FOCAL POINT SHIPPED INSTALLED
Point Source
Trim Assembly
POINT SOURCE TRIM ASSEMBLY SHIPS
INSTALLED IN SOME, BUT NOT ALL
INSTANCES. COMPLETE INSTALL OF RUN
PRIOR TO TRIM ASSEMBLY INSTALLATION.
Joiner Screw
(72074)
Joiner Washer
(700158)
Linear Joiner
Bracket
(A37621-01)
Reector Screw
(72026)
(#6x1/4 Self Tapping Screw)
U - Individual
S - Start of Run
I - Intermediate
E - End of Run
SHIPPED IN HARDWARE BAG
2.125"
53.9 mm
2.30"
58.4 mm
lay-in grid spacing tegular grid spacing
Product ID
Label on
Reector
PRODUCT ID LOCATION
Flush Lens
Point Source Only
Faceplate
DO NOT
OVER-TIGHTEN
SECURE TO
STRUCTURE ABOVE
IS0739 REV. C ©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference 2 of 3
RAIL & CLIP GUIDE
STD = 1-1/2" Tee Height, Tall = 1-11/16" Tee Height
CHECK RAIL & CLIP POSITIONS BEFORE INSTALLATION. ARROWS INDICATE SCREW POSITIONS.
TO CHANGE IN THE FIELD REMOVE AND REINSTALL ACCORDING TO DIAGRAMS BELOW.
G1: STD 15/16" Lay-In Tile
G2: STD 9/16" Lay-In Tile
G4: Tall 15/16" Lay-In Tile
G5: Tall 9/16" Lay-In Tile
G3: 9/16” Slot-Tee Tegular Tile
T1: STD 15/16” Tegular Tile
T2: STD 9/16” Tegular Tile
T4: Tall 15/16” Tegular Tile
T5: Tall 9/16” Tegular Tile
T6: 9/16” Node Tegular Tile
11
5
3
INDIVIDUAL INSALLATIONS FOLLOW STEPS 1, 2 & 6
1 2
SECURE TO
STRUCTURE ABOVE
6
4
MAKE ELECTRICAL CONNECTIONS
MAKE ELECTRICAL CONNECTIONS
IS0739 REV. C ©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference 3 of 3
DRIVER SERVICE - INTEGRATED POINT SOURCE
1 2
7
INSTALL POINT SOURCE TRIM ASSEMBLY
(IF IT DID NOT SHIP PREINSTALLED)
AVOID ALL CONTACT WITH
LED SURFACE, LEDs ARE
EASILY DAMAGED!
DRIVER SERVICE - POINT SOURCE ONLY
1 2
  • Page 1 1
  • Page 2 2
  • Page 3 3

Focal Point Seem 1 Point Source recessed FSM1D Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI