©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
1 of 5
IS0495 REV. F
Avenue® 6 LED
FAV6L
• Luminaires must be installed by a qualified
electrician (check with local and national
codes for proper installation).
• To prevent electrical shock, disconnect
electrical supply before installation or
servicing.
• Contractor is responsible for adequately
reinforcing walls and/or ceilings to support
fixture weight.
• Focal Point, LLC accepts no responsibility
for inadequately reinforced walls and/or
ceilings.
• The information contained in this drawing
is the sole property of Focal Point, LLC. Any
reproduction in part or whole without the
written permission of Focal Point, LLC is
prohibited.
POWER OFF
POWER ON
ATTENTION
SEE ADDITIONAL
INSTRUCTIONS
BEFORE YOU BEGIN COMPONENT KEY
INSTRUCTION KEY
FOCAL POINT
Grid Drywall
RAIL & CLIP GUIDE
CHECK RAIL & CLIP POSITIONS BEFORE INSTALLATION. ARROWS INDICATE SCREW POSITIONS.
TO CHANGE IN THE FIELD REMOVE AND REINSTALL ACCORDING TO DIAGRAMS BELOW.
G: STD /" LAYIN TILE
G: STD /" LAYIN TILE
STD = /" TEE HEIGHT, TALL = /" TEE HEIGHT
G: TALL /" LAYIN TILE
G: TALL /" LAYIN TILE
G: /" SLOTTEE TEGULAR TILE
T: STD /" TEGULAR TILE
T: STD /" TEGULAR TILE
T: /" NODE TEGULAR TILE
T: TALL /" TEGULAR TILE
T: TALL /" TEGULAR TILE
RAIL UP RAIL UP
RAIL DOWN
RAIL DOWN
CHAMFER UP CHAMFER UP
GRID INSTALLATION (see page 3 for drywall installation)
FT LUMINAIRE WEIGHT: LBS
FT LUMINAIRE WEIGHT: LBS
Avenue 6 is compatible with Armstrong® TechZone®
and other specialty 6" ceiling systems. Tee spacing
should be 6" on center for all ceiling systems.
"