Focal Point Seem 1 Louver Recessed FSM1C Installation guide

Type
Installation guide
1 of 3
IS0805 REV. A
©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
Seem® 1 Louver
Grid Ceiling | FSM1CG
Luminaires must be installed by a qualied
electrician (check with local and national
codes for proper installation).
To prevent electrical shock, disconnect
electrical supply before installation or
servicing.
Contractor is responsible for adequately
reinforcing walls and/or ceilings to support
xture weight.
Focal Point, LLC accepts no responsibility
for inadequately reinforced walls and/or
ceilings.
The information contained in this drawing
is the sole property of Focal Point, LLC.
Any reproduction in part or whole without
the written permission of Focal Point, LLC
is prohibited.
POWER OFF
POWER ON
ATTENTION
SEE ADDITIONAL
INSTRUCTIONS
BEFORE YOU BEGIN COMPONENT KEY
INSTRUCTION KEY
FOCAL POINT SHIPPED INSTALLED
Joiner Screw
(72074)
Joiner Washer
(700158)
Linear Joiner
Bracket
(A37621-01)
Reector Screw
(72026)
(#6x1/4 Self Tapping Screw)
U - Individual
S - Start of Run
I - Intermediate
E - End of Run
SHIPPED IN HARDWARE BAG
2.125"
53.9 mm
2.30"
58.4 mm
lay-in grid spacing tegular grid spacing
Product ID
Label on
Reector
PRODUCT ID LOCATION Flush Lens
Louver
Faceplate
Corner Joiner
Bracket 1
(A39928-03)
Corner Joiner
Bracket 2
(A37621-02)
Corner Unit
IS0805 REV. A ©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference 2 of 3
RAIL & CLIP GUIDE
STD = 1-1/2" Tee Height, Tall = 1-11/16" Tee Height
CHECK RAIL & CLIP POSITIONS BEFORE INSTALLATION. ARROWS INDICATE SCREW POSITIONS.
TO CHANGE IN THE FIELD REMOVE AND REINSTALL ACCORDING TO DIAGRAMS BELOW.
G1: STD 15/16" Lay-In Tile
G2: STD 9/16" Lay-In Tile
G4: Tall 15/16" Lay-In Tile
G5: Tall 9/16" Lay-In Tile
G3: 9/16” Slot-Tee Tegular Tile
T1: STD 15/16” Tegular Tile
T2: STD 9/16” Tegular Tile
T4: Tall 15/16” Tegular Tile
T5: Tall 9/16” Tegular Tile
T6: 9/16” Node Tegular Tile
3
INDIVIDUAL INSALLATIONS FOLLOW STEPS 1, 2 & 6
1 2
SECURE TO
STRUCTURE ABOVE MAKE ELECTRICAL CONNECTIONS
2 3
CORNER UNIT MUST BE
JOINED TO ONE OF THE
LINEAR UNITS PRIOR
TO CEILING INSTALLATION
1REMOVE AND DISCARD JOINER
BRACKET FROM LINEAR UNIT WHEN
JOINING TO CORNER
CORNER ASSEMBLY
IS0805 REV. A ©2022 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference 3 of 3
DRIVER SERVICE
1a
2AVOID ALL CONTACT WITH
LED SURFACE, LEDs ARE
EASILY DAMAGED!
DO NOT
OVER-TIGHTEN
SECURE TO
STRUCTURE ABOVE
11
56
4
MAKE ELECTRICAL CONNECTIONS
Use a non-maring tool with
thin blade to safely remove louver
without causing damage
1b
1c
FULLY LOUVERED LOUVER AND LENS
LOUVER AND FACEPLATE
1
EM- MOUNTING HEIGHT
See Battery Manufacturer
Instructions
Emergency maximum mounting height:
External Switch: 26.4'
Internal Switch: 8.0'
  • Page 1 1
  • Page 2 2
  • Page 3 3

Focal Point Seem 1 Louver Recessed FSM1C Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI