  • Hello! I am an AI chatbot trained to assist you with the Midmark Procenter Systems Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
Style G
Procenter Delivery, Console Mounted on an Elevance
Chair Installation Guide
Language of origin: English
003-2037-00 Rev. GA1 (4/2/2019)
Electrical Supply Requirements
Have an electrician install a 1/2 in. (13 mm) conduit box with quad or equal
receptacle. Top of box must be no higher than 4-1/2 in. (114 mm) above finished
surface of floor.
Water Supply Requirements (optional)
Use 1/2 in. (13 mm) pipe protruding 2 in. (51 mm) above finished surface of floor.
Manual shut-off valve is to be installed by a plumber.
Water pressure must be 30-50 (max.) PSI at the shut-off valve. Flush water
plumbing clean before making final connections to dental equipment.
Recommended water supply hardness level <60 ppm of calcium carbonate.
Equipment Alert
Do not remove wraps or packaging from the delivery flex arm assembly until it is mounted on the console.
Air Supply Requirements
Use 1/2 in. (13 mm) pipe protruding 2 in. (51 mm) from finished surface of floor.
Manual shut-off valve is to be installed by a plumber.
Air pressure must be 70-100 (max.) PSI at the shut-off valve. Flush air
plumbing clean before making final connections to dental equipment.
Air supply to be filtered, dry and oil-free per NFPA 99 requirements or equivalent
local codes.
Drain Requirements (optional)
Not less than 1-1/2 in. (38 mm) I.D. pipe from downpipe to trap, decreasing to
3/4 in. (19 mm) pipe from trap to connection box. Terminate with
3/4 in. (19 mm) NPT pipe protruding 1 in. (26 mm) above finished surface of
floor. Install adapter for 5/8 in. (16 mm) drain tubing. Place trap in line and vent
to conform with local codes.
Vacuum Requirements (optional)
Plumbing to J-Box box should be specified by central vacuum supplier and
terminated in J-Box with 3/4 in. (19 mm) O.D. tube protruding 1 in. (26 mm)
above finished surface of floor.
Equipment Alert
When installing 115~ (VAC) receptacle in the J-Box, position it so that all
the other components needed in the box will also fit.
Grounding reliability can only be achieved if this equipment is connected to an
equivalent receptacle marked Hospital Grade (NEMA 5-15R, HOSPITAL GRADE).
Attention!
The electrical and plumbing supply connectors inside the J-Box (Junction Box) must be installed by an electrician and plumber in compliance with local building codes.
All required hardware is to be supplied by contractor.
J-Box must be installed within reach of the chair umbilical [4 or 8 foot (1.2 or 2.4 m)].
midmark.com
2
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
J-Box Connections
4
0
6
0
80
100
2
0
0
1
2
3
5
6
7
4
0
40
6
0
80
100
20
0
1
2
3
5
6
7
4
0
Water
Air
17.8 “
(43.3 cm)
6.5"
(16.5 cm)
4.75"
(12.7 cm)
WARNING
Always disconnect power before removing covers. Failure to do so may
result in personal injury.
Step 1: Verify proper installation of J-Box.
A) J-Box frame is properly secured to floor.
B) J-Box lid completely covers plumbing and electrical connections.
C) J-Box is within reach of the umbilical provided (4 or 8 foot [1.2 or 2.4 m]).
3
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
Style G
Outside cover lip ts under
console top, then push in
until ball studs snap into
ttings in frame.
Inside cover lip ts under
console frame and is secured
with screw on bottom.
Step 3: Install console bearing and secure
with 3 screws.
Note: Position console bearing so the set screws are
accessible through holes.
Step 4: Install bearing washer.
Insert mounting post into
console bearing.
Step 5: Rotate arm to verify operation
For LH mounted consoles only
Move rotation stop screw to opposite hole.
Step 6: To adjust rotational drag:
Tighten or loosen console
bearing set screws.
Install the Procenter Delivery on the Console
Step 2: Remove the inside and outside console
covers.
Console Bearing
Mounting Post
Bearing Washer
Access holes for
set screws
Rotate Stop Screw
midmark.com
4
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
DA2403i
Delivery Flex Arm Setup for a Right or Left Mounted Console
Right Mounted
Console
Left Mounted
Console
Step 7: Move the flex arms so the delivery is
positioned over the foot of the chair.
Step 8: Install 2 stop pins as shown (depending
on which side of the chair the console is
mounted).
Note
Rotation stop screw will be between the two stop pins.
Rotation Stop
Screw
Rotation Stop
Screw (hidden)
5
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
Tubing Connections
Step 9: Install tubing adapter (from hardware kit) and
connect like colored tubing as shown.
Note: Tubing and connectors are provided for connecting a delivery
unit, a cuspidor, an assistant’s unit and bottled water . Leave any
unused tubing capped.
Tubing Adapter
Supply Air to Master ON/O Switch
Delivery Umbilical
Chair Umbilical
Supply Air from Master ON/O Switch
Handpiece Pilot Air for Coolant Water
Handpiece Coolant Water
Handpiece Drive Air
Syringe Air
Instrument Water
6
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
Electrical Connections
Note:
All connectors are uniquely shaped to fit only into properly mated connections.
Step 10: Connect Delivery Umbilical.
A) Plug the delivery unit power into J6 or J10 on the Elevance
Procenter Interface PCB.
B) Plug keypad control into J1 or J2 on the Elevance
Procenter Interface PCB.
Unit
Power
Elevance Procenter
Interface PCB
Keypad
Control
J6
J10
J9
WHT
BLK
J4
J1 J2
Grounds
Delivery
Umbilical
Chair
Umbilical
Step 11: Connect Chair Umbilical.
A) Plug jumper into J6 or J10 on the Elevance Procenter
Interface PCB.
B) Plug power connector into jumper.
C) Plug one communication line into J4 on the Elevance
Procenter Interface PCB.
Power
Jumper
Communication
Lines
Caution
Connect ground wire to ensure system ground continuity.
Failure to do so may result in electric shock.
Step 12: Screw all grounds into the two holes in the console
frame as shown.
7
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
For Units Having Deluxe Rheostat with Chip Air Foot Controls Only:
Make Chip Air Connection in Delivery Head.
A) Cut green 1/8" Coolant Air Supply tubing.
B) Locate clear 1/8” tubing coming into the unit head.
C) Use barbed tee and sleeves to tee the 1/8" clear tubing into the 1/8" green coolant air tubing.
Chip Air
Procenter Delivery Unit
Deluxe Rheostat with Chip Air
Unit Foot Control
8
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
Remove the Shipping Stabilizer from the Flex Arm
DA2404i
2
4
1
3
Step 13: Remove the Flex Arm end
cap (1 screw) and slide the
cover back.
Step 14: Remove the wire tie (shipping stabilizer) from the
lock pawls.
Slide the cover back in place and install the end cap.
Step 15: Remove the bottom cover on
the delivery unit (4 screws).
Step 16: Loosen 3 button head screws
and adjust the 3 leveling set
screws to level the flex arm.
Replace the bottom cover once the flex
arm is level.
Leveling set
screws (3)
Button head
screws (3)
9
© 2010 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-2037-00
Installation Checklist
Test Verify the following:
1 Flex Arm and Delivery are level.
2
Flex Arm and Delivery unit move easily and stay where
placed.
3 Electrical connections to PC board are tight.
4
PC board is secure inside the mounting box and is
properly grounded to the console frame.
5 All console covers (4 total) are securely in place.
6
No wires or tubing are pinched by covers or
mountings.
7
Wipe Console with a soft dry cloth to remove any dirt
or smudges.
8 Test hand controls to make sure they work properly.
Install Covers and Check Installation
Step 17: Install the inside and outside console covers.
Note: All electrical connections should be covered by the inner cover.
Ball studs
Stud ttings
Inside cover lip ts under
console frame and is secured
with screw on bottom.
Outside cover lip ts under
console top, then push in
until ball studs snap into
ttings in frame.
/