Belmont Evogue Jbox Template

  • Hello! I've reviewed the provided template document for the EVOGUE Q-5000 Utility Center. This document details the dimensions and specifications for installing various utilities, such as the gravity drain, electrical connections, and air and vacuum lines. I'm ready to answer any questions you might have about the template and its contents.
  • What is the nominal pipe size for the gravity drain?
    What size is the central vacuum tube?
    What is the size of the electrical conduit?
    What is the pipe size for the air connection?
1”
2-1/4”
5-1/4”
5-5/8”
6”
3”
5-5/8”
14-15/32”
4-3/8”
5”
7-1/8”
10-1/8”
17-3/8”
1-1/2”
1”
Contoured Utility Center Floor Template
EVOGUE Delivery Systems
®
1-800-223-1192 TEMPL030 Rev 022916
for Quolis Q-5000 Chairs
Notes :
(1) Local regulations provide that licensed plumbers & electricians shall install utilities.
(2) Make sure all plumbing conforms to prevailing local codes.
(3) Plumbing central vacuum to the utility center should be specified by the central vacuum
supplier and terminated in utility center with 5/8" O.D. tube perpendicular to the floor.
(4) Gravity drain has 1-1/2" nominal pipe protruding 1" from finished floor.
Note : Contractor to supply and place trap in line to conform with local codes.
(5) Electrical contractor to supply quad electrical outlet box.
/