2-1/4”
5”
5-3/4”
6-1/4”
14-1/2”
2-3/4”
6-3/4”
7-1/4”
1-1/2”
6”
Electrical Conduit
for Quad Box
(1/2” O.D.)
Electrical Conduit
for Quad Box
(1/2” O.D.)
Finished Floor
Telecommunications
(1-1/2” Nominal Pipe)
Transformer Space
Telecommunications
(1-1/2” Nominal Pipe)
Gravity Drain
(1-1/2” Nominal Pipe)
Gravity Drain (1-1/2” Nominal Pipe)
Central Vacuum
(5/8” O.D. Tube)
Central Vacuum (5/8” O.D. Tube)
Water
(1/2” Threaded Pipe)
Water (1/2” Threaded Pipe)
Air
(1/2” Threaded Pipe)
Air (1/2” Threaded Pipe)
3-1/4”
5-3/4”
9-3/4”
12”
14-1/2”
7-1/4”
6-1/2”
Umbilical Connection
Bracket
Utility Center
Frame
1”
Notes :
(1) Local regulations provide that licensed plumbers+ electricians shall install utilities.
(2) Make sure all plumbing conforms to prevailing local codes.
(3) Plumbing central vacuum to the utility center should be specified by the central vacuum sup-
plier and terminated in utility center with 5/8" O.D. tube perpendicular to the floor.
(4) Gravity drain has 1-1/2" nominal pipe protruding 1" from finished floor.
Note : Contractor to supply and place trap in line to conform with local codes.
(5) Electrical contractor to supply quad electrical outlet box.
X-Calibur Delivery System
Model : BDS-2500/2505/2510/2515/2520/
2570/2575/0020/0050
Utility Center Floor Template
1-800-223-1192 TEMPL020 Rev 083010