2-1/4”
5”
5-3/4”
6-1/4”
14-1/2”
2-3/4”
6-3/4”
7-1/4”
1-1/2”
6”
Electrical Conduit
for Quad Box
(1/2” O.D.)
Electrical Conduit
for Quad Box
(1/2” O.D.)
Finished Floor
Telecommunications
(1-1/2” Nominal Pipe)
Transformer Space
Telecommunications
(1-1/2” Nominal Pipe)
Gravity Drain
(1-1/2” Nominal Pipe)
Gravity Drain (1-1/2” Nominal Pipe)
Central Vacuum
(5/8” O.D. Tube)
Central Vacuum (5/8” O.D. Tube)
Water
(1/2” Threaded Pipe)
Water (1/2” Threaded Pipe)
Air
(1/2” Threaded Pipe)
Air (1/2” Threaded Pipe)
3-1/4”
5-3/4”
9-3/4”
12”
14-1/2”
7-1/4”
6-1/2”
Umbilical Connection
Bracket
Utility Center
Frame
1”
Notes :
(1) Local regulations provide that licensed plumbers+ electricians shall install utilities.
(2) Make sure all plumbing conforms to prevailing local codes.
(3) Plumbing central vacuum to the utility center should be specified by the central vacuum sup-
plier and terminated in utility center with 5/8" O.D. tube perpendicular to the floor.
(4) Gravity drain has 1-1/2" nominal pipe protruding 1" from finished floor.
Note : Contractor to supply and place trap in line to conform with local codes.
(5) Electrical contractor to supply quad electrical outlet box.
and BDS Delivery Systems
Standard Utility Center Floor Template
1-800-223-1192 TEMPL020 Rev 022516
EVOGUE ‘B’ Delivery Systems
for X-Calibur Series Chairs