FläktGroup EULZ-29 Telpher Installation guide

  • I have reviewed the installation instructions for the Telpher EULZ-29. This document provides detailed steps for assembling and installing the telpher. I am ready to assist you with any specific questions and provide detailed directions regarding the listed steps.
  • What is the maximum load for the telpher?
    What needs to be dismantled before installation?
    What is the proper order for dismantling and reassembly?
Fläkt Woods 3235 GB 03.01 1 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
Telpher EULZ-29, size 51–84
Dismantle the panel and pillar over the door for
sizes 71–84.
Slide the telpher EULZ-29 onto the telpher beam
EULZ-25.
Assemble the extension beam with a nut and
bolt .
Secure the telescopic upright to the extension
beam with a screwed joint .
Adjust the height of the supporting uprights with a scre-
wed joint .
Check that the telpher runs freely along the entire telpher
beam. Fit the telpher with a tackle dimensioned for the
counterweight. Undo the motor and lift it. In certain cases
the telpher cannot be aligned directly above the motor.
Place a pallet between the unit and the supporting upright
for transport of the motor.
Dismantling and reassembly take place in the reverse
order.
Max. load 1000 kg.