GENERAL
The telpher hoist consists of a permanent installed telpher beam
(EQLZ-25). Lever hoist and lift chain are only supplied on special
customer request.
Use only manual lever hoist and chain which fulfil the requirements
of essential health and safety of the European machine directive
which are CE marked.
The purpose of the telpher hoist is to lift the electrical motor out of
the air handling unit if the for replacement or overhaul. To make the
telpher hoist functional, the extension beam and support have to be
erected at site.
WORKING LOAD LIMIT
Working load limit of the telpher equipment is 300 kg.
SAFETY INSTRUCTION
1. Only personal who have read and understood this manual is
allowed to operate the telpher.
2. Check the telpher equipment according to check prior to use.
3. Never use telpher equipment with more than working load limit
marked on the equipment.
4. Prior use, follow the third party user manuals of trolley, lever
hoist, lifting chain, motor and fan.
5. Do not use the telpher equipment for lift of personal, the telpher
equipment is for lift of electrical fan motor only.
6. Always wear protective gear as e.g. helmet, protective shoes.
7. Work in safety distance to the lifted load and telpher equipment.
8. Check with water-level the horizontal position of the telpher
beam.
9. On vessel and offshore installation, use the telpher only at plan
sea conditions.
10. Do not have unwatched load hanging at the telpher.
11. Two persons are required to install and operated the telpher
safely.
12. The telpher is for manual operation only.
CHECK PRIOR USE
Prior any use of the telpher make visual sure that no corrosion
occurred on the screw connection of telpher beam to air handling
unit casing. If parts have to be replaced use original parts only by
contact FläktGroup.
INSTALLATION/TELPHER BEAM IS
PERMANENTLY MOUNTED
OPERATION
1. Extend the telescopic beam and check that the lifting eye slides
freely on the telescopic beam.
2. Unfasten the bolts that secure the motor.
3. Fit the lifting eye with a block and tackle capable of supporting
the weight of the motor.
In certain cases, the telpher cannot be aligned directly above
the motor.
Max. permissible extension: 600 mm. A stop screw in the
telpher beam will ensure this.
Max. permissible load at full extension: 300 kg.
32 32
Telpher beam
Fixing plate
Sliding plate
Lifting eye
Telescopic beam
Max. 600
EQLZ-25 TELPHER BEAM, SIZES 008, 011- 063, 072
TELPHER BEAM
EQLZ-25, EQLZ-29
INSTALLATION INSTRUCTIONS
FläktGroup DC_8659GB 20180122_R0 We reserve the right to make changes without prior notice
2
GENERAL
The telpher hoist consists of a permanent installed telpher beam
(EQLZ-25), the telpher extension beam with support, trolley and four
M12 screws. Lever hoist and lift chain are only supplied on special
customer request.
Use only manual lever hoist and chain which fulfil the requirements
of essential health and safety of the European machine directive
which are CE marked.
The purpose of the telpher hoist is to lift the electrical motor out of
the air handling unit if the for replacement or overhaul. To make the
telpher hoist functional, the extension beam and support have to be
erected at site.
WORKING LOAD LIMIT
Working load limit of the telpher equipment is 750 kg.
SAFETY INSTRUCTION
1. Only personal who have read and understood this manual is
allowed to operate the telpher.
2. Check the telpher equipment according to check prior to use.
3. Never use telpher equipment with more than working load limit
marked on the equipment.
4. Prior use, follow the third party user manuals of trolley, lever
hoist, lifting chain, motor and fan.
5. Do not use the telpher equipment for lift of personal, the telpher
equipment is for lift of electrical fan motor only.
6. Always wear protective gear as e.g. helmet, protective shoes.
7. Work in safety distance to the lifted load and telpher equipment.
8. Check with water-level the horizontal position of the telpher
beam.
9. On vessel and offshore installation, use the telpher only at plan
sea conditions.
10. Do not have unwatched load hanging at the telpher.
11. Two persons are required to install and operated the telpher
safely.
12. The telpher is for manual operation only.
CHECK PRIOR USE
Prior any use of the telpher make visual sure that no corrosion
occurred on the screw connection of telpher beam to air handling
unit casing. If parts have to be replaced use original parts only by
contact FläktGroup.
TELPHER BEAM EQLZ-25 AND TELPHER EQLZ 29 SIZE 068-216
INSTALLATION
1. Dismantle the panel and pillar over the door for sizes 126-216.
2. Slide the telpher EQLZ-29 onto the telpher beam EQLZ-25.
3. Assemble the extension beam to the telpher beam with the M12
nut (3b)and bolt (3a), tighten the bolt to 20 Nm.
4. Secure the telescopic support to the extension beam with the
M12 nut and screw (4a and 4b), tighten the bolt to 20 Nm.
5. Adjust the height of the support and lock middle section with
tow M12 nut and screw respectively (5a), tighten the screw to
20 Nm .
6. Fix the support foot with two screws in the bottom.
7. Check that the telpher runs freely along the entire telpher beam.
8. Fit the telpher with lever hoist and lifting chain.
9. Dismantling and reassembly take place in the reverse order.
OPERATION
1. Place a pallet between the air handling unit and the support for
transport of the motor.
2. Make sure that the main power is disconnected.
3. Maneuver the trolley over the motor and connect the lifting chain
hook to the motor lifting points.
4. Free the motor from any mechanical and electrical connection,
only qualified personal is allowed to disconnected the electrical
power supply.
5. Lift the motor from the motor support.
6. Push the motor in direction of the telpher beam out of the air
handling unit.
7. Stop the trolley in the middle of the extension beam.
8. Lower the motor onto the pallet and disconnect the chain hooks.
9. Reassembly takes place in the revered order.
4
5a
3a 4b
3
1
4a
5
2,7,8
3b
EQ 068,079,090 Existing telpher beam EQLZ-25
EQLZ-29
EQ 126-216
6
EQ 081-216
  • Page 1 1
  • Page 2 2

FläktGroup EQLZ-25 EQLZ-29 Telpher beam Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI