FläktGroup LQLZ-29 Telpher Installation guide

  • I've reviewed the document for the Telpher LQLZ-29 and am ready to answer your questions. The document includes step-by-step instructions for installation, including dismantling the panel and pillar, sliding the telpher onto the beam, assembling the extension beam, securing the telescopic upright, and adjusting the supporting uprights. It specifies a maximum load of 1000 kg.
  • What is the maximum load for the telpher?
    What is the model name?
    What is the name of the telpher beam?
FläktGroup DC_9159GB 20180326_R0 Specifications are subject to alteration without notice
TELPHER LQLZ-29
INSTALLATION INSTRUCTION
Dismantle the panel and pillar over the door for sizes 71–84.
Slide the telpher LQLZ-29 onto the telpher beam LQLZ-25.
Assemble the extension beam with a nut and bolt .
Secure the telescopic upright to the extension beam with a
screwed joint .
Adjust the height of the supporting uprights with a
screwed joint .
1 2
3
45 6
7 4
8 9
10 11
Check that the telpher runs freely along the entire telpher beam. Fit the
telpher with a tackle dimensioned for the counterweight.
Undo e motor and lift it. In certain cases the telpher cannot be aligned
directly above the motor.
Place a pallet between the unit and the supporting upright for transport
of the motor.
Dismantling and reassembly take place in the reverse order. Max. load
1000 kg.
LQ 51, 53
LQ 60–84
Existing telpher beam LQLZ-25
LQLZ-29
LQ 71–84
1 2
3
4
5
6
7
8 9
10 11
/