Press the composite pipe into the pipe channels in a wide arc from bot-
tom to top. See distributor for connection.
Attach wall heating metalgrid from top to bottom, lightly tensioned and
with 10 cm overlap, using the dowel upper section.
9 10
Before applying the plaster carry out the required pressure test to at
least 6 bar, according to the test report.
The single 15 mm thick layer of plaster can be smoothed or matted as
required.