Danfoss SpeedUp Eco Wall Heating Installation guide

Type
Installation guide
1
Instruction
Danfoss Heating VIEUB102 Heating Solutions
Installation of SpeedUp Eco Wall Heating without battens in dry walls
1 2
To attach the individual system panels apply adhesive grout or tile adhesive
using the comb spatula.
Start with header/Blank panels according to the lay-out drawing.
3 4
The pre-formed cutting edges mean that the system elements are easy to
shorten using the circular hand saw/jig saw. Fill the boundary/electrical
areas with blank panels.
Mark individual pipe channels, cut out with router.
5 6
Press the composite pipe into the pipe channels in a wide arc from bot-
tom to top. See distributor for connection.
Lead return flow from above with supply elements or individual pipe
channels (use router to do this) back to the starting point
Produced by Danfoss A/S © 06/2010
VIEUB102
7 8
Always make the pipe connections between the straight aluminium
sheets - not in bends.
Before panelling a pressure test to at least 6 bar is required according to
the test report.
9 10
Attach the 12.5 fibre reinforced plasterboard with at least 9 dowels or
screws per m
2
. Glue the panel joints.
Fix 4-5 mm edge joint with sticky tape and clean off, observe manufac-
turer’s instructions.
Instruction Installation of SpeedUp Eco Wall Heating without battens in dry walls
  • Page 1 1
  • Page 2 2

Danfoss SpeedUp Eco Wall Heating Installation guide

Type
Installation guide