Danfoss SpeedUp Eco floor heating in dry Installation guide

Type
Installation guide
1
Instruction
Danfoss Heating VICSD202 Heating Solutions
Installation of SpeedUp Eco floor heating in dry installations
1 2
Install SpeedUp Eco perimeter insulation and support batten on dry and
even and load bearing substrate. Screw down battens in thresholds.
Following the layout begin the installation in one corner with a SpeedUp
Eco header panel.
3 4
Lay SpeedUp Eco heat panels (CZ: pipe distance 250 mm, EZ: pipe
distance 125 mm) according to plan.
Create flow and returns and 90° bends with pre-formed panels.
Fill gaps and unheated areas (e.g. under fixed furniture) using blank
panels.
5 6
Additional battens provide extra support for greater loads. If necessary cut the heat panels between the heating aluminium plates
with a circular hand saw.
Produced by Danfoss A/S © 04/2009
VICSD202
7 8
Using a router cut out individual pipe channels taking extra care to keep
the correct curve.
Holding the pipe in a large curve to avoid tension, press the composite
pipe into the channels.
9 10
Avoid lifting pipe once installed in the header panels. Press fittings should only be positioned between two aluminum sheets
and never in curved sections of pipe.
Instruktion Installation of SpeedUp Eco floor heating in dry installations
  • Page 1 1
  • Page 2 2

Danfoss SpeedUp Eco floor heating in dry Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI