Installation of SpeedUp Wall Heating in dry wall installations
1 2
To attach the individual system elements use material compatible adhesive
such as for example foam insulation (PU).
In accordance with the layout drawing start with header or edge panels.
3 4
The heating panels must be laid horizontally with the supply point
at the bottom.
The predetermined breaking points mean that the system elements
can easily be shortened both longitudinally and laterally.
5 6
Fill boundary areas or areas for electrical installations with blank panels. Direct the return flow from above to the connection pipe using separated
CZ (pipe spacing 25 cm) or EZ panels (pipe spacing 12.5 cm).
Produced by Danfoss A/S © 06/2010
VIETB102
7 8
Cut out individual pipe channels with the hot wire cutter ensuring that
the correct angle of arc is used.
Press the composite pipe in a loop into the channels (connection: see
distributor instructions).
9 10
Always make the pipe couplings between the straight aluminium sheet
- not in the bends.
Use 12.5 fibre reinforced plasterboard for panelling, attachment and
sealing according to manufacturer’s instructions.
Seal edge joints with acrylic filler.
Instruction Installation of SpeedUp Wall Heating in dry wall installations
  • Page 1 1
  • Page 2 2

Danfoss SpeedUp Wall Heating in Dry Wall Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI