Danfoss SpeedUp Eco Heat Panels Installation guide

Type
Installation guide
1 2
3
4
5 6
7 8
9
10
Instruction
SpeedUp Eco Heat Panels
Installation of floor heating in dry installations
1
Install SpeedUp Eco peri-
meter insulation and support
batten on dry and even and
load bearing substrate. Screw
down battens in thresholds.
2
Following the layout begin
the installation in one corner
with a SpeedUp Eco header
panel.
3
Lay SpeedUp Eco heat
panels (CZ: pipe distance 250
mm, EZ: pipe distance 125
mm) according to plan.
Create flow and returns and
90° bends with pre-formed
panels.
4
Fill gaps and unheated
areas (e.g. under fixed furni-
ture) using blank panels.
5
Additional battens provide
extra support for greater loads.
6
If necessary cut the heat
panels between the heat-
ing aluminium plates with a
circular hand saw.
7
Using a router cut out in-
dividual pipe channels taking
extra care to keep the correct
curve.
8
Holding the pipe in a large
curve to avoid tension, press
the composite pipe into the
channels.
9
Avoid lifting pipe once
installed in the header panels.
10
Press fittings should only
be positioned between two
aluminum sheets and never in
curved sections of pipe.
Danfoss HES VI.CS.D1.02 © Danfoss 11/2008 1
  • Page 1 1

Danfoss SpeedUp Eco Heat Panels Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI