30 Mainmast pin-rails, bilge pump, storeroom and cages
32 THE CUTTY SARK: STEP BY STEP
30With the parts 206, 207, 208, 209, 210,
211 and 109, build the bilge pump. Glue
the masthole 154, and around this make ten
holes 0.8mm in diameter to fit the eyebolts
109. Make the pin-rails (see Step 26). Mount
the pin-rails, the bow wardroom, the netting
machine and the bilge pump. Glue the two bitts
110 and the four working warping heads 212.
With the parts 213, 214, 215, 216, 217, 218,
219, 220, 221, 222, 223, 224, 225, 226, 227,
228, 229 and 26 build the storeroom. With the
parts 230, 231, 232, 233 and 234 build the two
cages and stain them with a mixture of bitumen
and approximately 30 per cent solvent. With
the 0.5mm-diameter brass wire, make the bars
for the cages 235. Build the two stairs on the
bridgedeck with the sides 236 and the steps
237.
209
208
209
211
207
206 109 207 210
211
212 212
109
109 212
220
222221
216
229
223
214
227
26 228
234
230
231
232
235 232
231
231
233 234
233
231
231 232 233
231
234
219 225 218
226
213
224
223
227
222
215
237
236
217 218
213
221
220
212
154
110
diam. 0.8mm