INSTALLATION INSTRUCTIONS
SHIELD
© 2023 Q-T
ran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 |
[email protected] | www
.q-tran.com
Specification subject to change.
Rev-04-11-23 3METHODS &
INSTALLATIONS SHILD - B
SHLD - A
a. Clean surface.
b. Measure PVC carrier and cut to length.
c. Remove adhesive backing on carrier and mount to surface.
a. Mount LED within guideline on PVC Carrier and apply
pressure. Start and end LED 3/8" from end of carrier.
b. Install Shield Lens. Start at input feed wire end. Remove
adhesive backing and provide pressure as you mount down
the lenght of carrier.
c. Cut shield to desired length. Use scissors or razor blade.
Allow 3/8" of dead space at each end.
50% humidity
or less
70-100ºF 72 hrs
1
Temperature and environmental concerns:
• Ideal application environment is 70-100ºF in 50% humidity
or less.
• Minimum application temperature: 50ºF
• This temperature and humidity should be maintained for
72 hours after application for maximum bond strength.
2
For porous materials (Wood, Brick, Concrete etc.) apply two
layers of paint or primer to the surface. This will help create
a better bonding surface for these materials. These can be
purchased from a local hardware store.
Paint or
3M
Primer 94
Wood Brick Concrete
1 layer 2 layers
MATERIALS
Concrete, Stone, Cinderblock, Metal, and Brick
ABS, Fiberglass, Plastic, and PVC
Tile, Wood, Ceramic, Glass, or Metal
All Purpose
SUGGESTED EPOXIES
Loctite Metal and Concrete Two-Part Epoxy
Loctite Plastic Two-Part Epoxy
Loctite Clear Two-Part Epoxy
Strong Stik
MOUNTING METHOD: SHLD-A
5 mins
50/50
alc
3
a
b
3/8"
4
a b
NOTE: Standalone use
c