Q-TRAN SHLD-A Protect LED Strips

Q-tran Q-TRAN SHLD-A Protect LED Strips User manual

  • Hello! I am an AI chatbot trained to assist you with the Q-tran Q-TRAN SHLD-A Protect LED Strips User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
  • What is the installation temperature range?
    What is the humidity requirement for installation?
    How to install for SHLD-A when using standalone method?
    How to install for SHLD-B when using within extrusions?
INSTALLATION INSTRUCTIONS
SHIELD
© 2023 Q-Tran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 | [email protected] | www.q-tran.com Specification subject to change. Rev-04-11-23 1
COMPLIANT
.63"
.29"
.47"
.20"
SHLD-A SHLD-B
INSTALLATION INSTRUCTIONS
SHIELD
© 2023 Q-Tran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 | [email protected] | www.q-tran.com Specification subject to change. Rev-04-11-23 2
SHILD - B
SHILD - A
METHODS &
INSTALLATIONS
METHODS OF INSTALLATION:
ATTENTION: Please read all instructions BEFORE installation
Product to be installed by a licensed electrician
Always ensure power supply connection to electrical circuit is disconnected before working on it
Follow diagram to connect Secondary Voltage wires to power supply. Refer to Q-Tran power supply instructions for wiring
Use only with Class 2 power supply unit — Compatible for use with Q-Tran power supplies
Suitable for DRY
Suitable for installation in storage area of a clothes closet when assembled as a finished extrusion up to 4W/ft at Q-Tran facility
Temp Rating: Refer to cut sheet
Not rated for walkover
Diagrams for representation only and not to scale.
Adhesive Mount
WALL
WALL
FLOOR
CEILING
VHB Tape
Included on the
backside of strip
NOTES:
Avoid bending in sharp angles which may damage the LED.
Diagrams for representation only and not to scale.
MOUNTING METHOD
• SHLD-A (page 3)
• SHLD-B (page 4)
SHLD-A (for standalone use)
SHLD-B (for use within extrusions)
Profile - S
Profile - S
Profile - M
Profile - M
Profile - L
Profile - L
.63"
.29
"
.71"
.29
"
.79"
.29
"
.47"
.20
"
.55"
.20
"
.63"
.20
"
LED strip
(sold separately)
Silicone sleeve
3M adhesive
PVC Carrier
3M adhesive
LED strip
(sold separately)
Silicone sleeve
INSTALLATION INSTRUCTIONS
SHIELD
© 2023 Q-Tran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 | [email protected] | www.q-tran.com Specification subject to change. Rev-04-11-23 3
METHODS &
INSTALLATIONS SHILD - B
SHLD - A
a. Clean surface.
b. Measure PVC carrier and cut to length.
c. Remove adhesive backing on carrier and mount to surface.
a. Mount LED within guideline on PVC Carrier and apply
pressure. Start and end LED 3/8" from end of carrier.
b. Install Shield Lens. Start at input feed wire end. Remove
adhesive backing and provide pressure as you mount down
the lenght of carrier.
c. Cut shield to desired length. Use scissors or razor blade.
Allow 3/8" of dead space at each end.
50% humidity
or less
70-100ºF 72 hrs
1
Temperature and environmental concerns:
Ideal application environment is 70-100ºF in 50% humidity
or less.
Minimum application temperature: 50ºF
This temperature and humidity should be maintained for
72 hours after application for maximum bond strength.
2
For porous materials (Wood, Brick, Concrete etc.) apply two
layers of paint or primer to the surface. This will help create
a better bonding surface for these materials. These can be
purchased from a local hardware store.
MATERIALS
Concrete, Stone, Cinderblock, Metal, and Brick
ABS, Fiberglass, Plastic, and PVC
Tile, Wood, Ceramic, Glass, or Metal
All Purpose
SUGGESTED EPOXIES
Loctite Metal and Concrete Two-Part Epoxy
Loctite Plastic Two-Part Epoxy
Loctite Clear Two-Part Epoxy
Strong Stik
MOUNTING METHOD: SHLD-A
50/50
alc
5 mins
50/50
alc
3
WAIT
a
b
3/8"
4
a b
NOTE: Standalone use
c
INSTALLATION INSTRUCTIONS
SHIELD
© 2023 Q-Tran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 | [email protected] | www.q-tran.com Specification subject to change. Rev-04-11-23 4
METHODS &
INSTALLATIONS SHILD - A SHLD - B
Peel back 0.5" of the VHB tape’s protective film on one end
of LED and use firm pressure to adhere it to the extrusion,
avoiding air bubbles. Continue peeling the film and adhering
the strip in small sections until the entire length is installed.
Peel back 0.5" of the VHB tape’s protective film on both ends
of the shield lens and use firm pressure to adhere it to the ex-
trusion along the sides of the LED strip, avoiding air bubbles.
Continue peeling the film and adhering the shield lens in small
sections until the entire length is installed.
50% humidity
or less
70-100ºF 72 hrs
1
Temperature and environmental concerns:
Ideal application environment is 70-100ºF in 50% humidity
or less.
Minimum application temperature: 50ºF
This temperature and humidity should be maintained for
72 hours after application for maximum bond strength.
2
Using a 50/50 alcohol mix, thoroughly clean surface area of
the extrusion and tray. Allow 5 minutes to dry.
3 4
MOUNTING METHOD: SHLD-B
5 mins
For instructions pertaining to the installation of extrusion components,
visit the applicable extrusion product page at
q-tran.com.
Refer to extrusion installation instructions for cutting to length at
https://www.q-tran.com/products/extrusions/
NOTE: In Extrusions
/