52
SANTISIMA TRINIDAD: Step by Step ™
Apply glue to the top of rib 9, in the
areas highlighted with dotted red lines.
Test-fit the bulkhead in place, centred
with the hull. If the bulkhead extends
above the beam, sand it level and then
fix in place.
Take the bulkhead from stage 12
and cover it with planks, starting at
the middle and working out towards
the ends. When dry, remove the
overlapping planking from the edges,
then sand and paint in the same way as
the decks.
The photo shows how the assembly
should look at this stage. Keep any left-
over material, as it will be used later.
I
J
K