FläktGroup EUAZ-08 Water trap Installation guide

Type
Installation guide
Fläkt Woods 4058 GB 2015.09.23 1 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
Installation
Units with RECUTERM EURC, ECOTERM EURE,
ECOTERM BOX EURV heat recovery units, EUQA,
EUQB air cooler and/or EUNN or EUNP air cooler are
provided with drain connections on the inspection side
for connection to a water trap. The EUAZ-08 water trap
is designed for max. 800 Pa sub-atmospheric pressure.
CAUTION Not designed for pressure above atmospheric.
Dimensions EUAZ-08
Installation
Fit the water trap without the use of tools as shown in
the figure above and in the following order:
A. Connect the elbow 2 to the drain pipe 1 .
B. Connect the discharge pipe 1 (32 mm o.d.) to the water
trap outlet 6 .
The discharge pipe should be as short as possible and
should be run with a continuous incline to a floor gully,
without reduction in area.
A clear space of at least 150 mm is required below the
unit for the water trap.
1. Drain pipe of the unit section
2. Elbow
3. Base frame or other support with a height of at least
150 mm
4. U-bend
5. Non-return valve with cleaning cover
6. 32 mm i.d. outlet with compression coupling
7. Floor gully
N.B. The water trap and discharge pipe must not be
subjected to temperatures below freezing. If the unit
is installed outdoors, the drain pipe, water trap and
discharge pipe should be insulated. The water trap
should not be exposed to direct sunlight.
EUAZ-08 Water trap
0°
°C
Under pressure
Pa
Cut to size
(L)
Height
(H)
< 600 50 mm 40 mm
600-1000 70 mm 60 mm
1000-1400 110 mm 100 mm
1400-1800 150 mm 140 mm
1800-2200 190 mm 180 mm
2200-2600 200 mm 220 mm
Capacity: 0.8 m3/h.
Pa
H
L
  • Page 1 1

FläktGroup EUAZ-08 Water trap Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI