EUG(A,B) – General instructions, standard design
Fläkt Woods 4065 GB 05.08 1 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
Delivery
The EUGA unit is delivered in accordance with one of
the following alternatives:
As one delivery unit, i.e. factory-assembled in one
multi-function block
As one delivery unit, i.e. factory-assembled unit
mounted on a base frame.
Several multi-function blocks which are connected to
form one unit on site.
Lifting and transport
The weight of each multi-function block is specified on
the rating plate. Each block is provided with packaging
as shown in Fig. 3. The blocks can be transported by
means of a forklift truck, a pallet transporter or a plat-
form truck. Lifting can be carried out as shown in Fig.
4–10.
Fig. 3
Fig. 5. Using a crane to lift a unit
in its packaging. The max-
imum permissible load is
contingent to the lifting
capacity of the slings.
Fig. 9
Fig. 1 Fig. 6. Sizes 11–53
Lifting a multi-funcion block
1050 kg
MAX.
L
L
6000 kg
MAX.
EUAZ-06 Lifting tube
EUAZ-04 Base frame
Sizes 1153
Lifting a unit provided with a base frame.
Fig. 10
Fig. 4a. Using a forklift truck
with extended forks.
Fig. 4b. Using a forklift tryck with
the forks over the unit.
Sizes 1153.
Fig. 2
Fig. 7. Lifting a unit fitted with lifting
wires.
Fig. 8. Sizes 6084
If the outside surface of the
unit must be completely
smooth, remove the bolt,
spacer sleeve and lifting wire.
Sizes 6084
3000 Kg
Max.
Max. 80°
NOTE No other type of lifting
equipment may be used
NOTE No other type of
lifting equipment
may be used
EUAZ-02 Lifting lugs
EUAZ-02 Lifting lugs
Fläkt Woods 4065 GB 05.08 2 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
EUG(A,B) – General instructions, standard design
Fig. 12. Sizes 1153
Fig. 11
Place the unit on a flat surface. Back off the screws in the
corner sections. Hook the lifting lugs onto the screws
and tighten the screws to a torque of 22–24 Nm.
Mounting on the floor
The floor on which the unit is mounted must be level, to
ensure its problem-free function. Carefully check the
floor to ensure that distortion and problems in opening
and closing the doors are not built into the unit.
Base frame EUAZ-04 can be supplied with adjustable
feet EUAZ-05 for individual height adjustment. These
are available for sizes 11-53. Non-adjustable feet are
available for larger sizes. The support washer supplied is
placed under the foot; see Fig. 12. It is important to
ensure that the unit is positioned horizontally.
Space for a water trap (e.g. EUAZ-08) must be provid-
ed for air handling units which contain functional com-
ponents with a drainage facility. See Fig. 14.
Lateral and longitudinal position adjustment is most eas-
ily performed with a roller crowbar or similar. See Figs.
15 and 16.
Larger and heavier units can be raised by using a
hand-operated form loader on both short sides to avoid
damage to the underside of the unit. See Fig. 17.
Installation of adjustable feet
The feet should be installed at regular intervals along the
side rails, if they are more than 4 in number. Where 4
feet are required, one foot should be installed at each end
of the side rails.
Adjustment of
set-screws:
1) Release the
locking nut (A).
2) Adjust the height
with the set-screw
(B).
3) Lock the locking
nut (A).
Lifting and transport (contd.)
Fitting/Removing the lifting lug
EUGA sizes 11–53 TORX T40 drive,
(galvanized)
Fig. 15
Fig. 14
Free space for water
trap = min 150 mm
Multi-function
block on base frame EUAZ-04
Multi-function
block without
base frame
15 mm
gap be-
neath the
end sec-
tion of
the base
frame
Fig. 13. Sizes 6084
Fig. 17
Fig. 16. Sizes 1153.
150
120 30
A
B
Fläkt Woods 4065 GB 05.08 3 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
EUG(A,B) – General instructions, standard design
Fig. 21
Suspended mounting from the ceiling
Place the unit on a frame constructed on-site. See the
examples in Figs. 18 to 23. Suspend the frame from pen-
dant hangers.
The frame must also be executed so that so that the
base panels have either transverse or longitudinal support
rails on the underside.
Important!
The hangers must be positioned so that they do not
obstruct the inspection hatches. A frame of the kind
shown in Fig. 18 permits easy adjustment of the hangers.
Fig. 18
max. 1,5 m
min. 800
Hangers
Clamp
Hangers
A
cc max 600cc max 600
Fig. 19
Fig. 20
Sizes 11–53
Retaining flange A –
max. 35 mm along
the inspection side
Sizes 60–84
Retaining flange A –
max. 75 mm along
the inspection side
Fig. 22
Fig. 23
cc max 600cc max 600
View A
Hangers
View B
View A View B
Heavy duty installation
Suitable installation for sizes 40–84
Cut and remove the edge ”A” at the hinge locations to
sizes 11–53.
Heavy duty installation
Suitable installation for sizes 40–84
Fläkt Woods 4065 GB 05.08 4 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
EUG(A,B) – General instructions, standard design
Stacked or angle installation
Units of the same width can be stacked on top of one
another. Up to three size 11–32 units, but only two size
40–85 units can be stacked on top of one another. In the
case of units of different width, the inspection doors
should be positioned directly above one another. An
angle iron should be positioned under the rear frame sec-
tion of the upper unit (same length as of the lower unit)
and a piece of bar for height compensation should be
positioned under the front frame section. Fit EUAZ-10
sealing strip around the opening of the angle section
before fitting the upper unit.
Fig. 24
Fig. 26
Example:
EUAZ-16 angle brackets
Angle section
(bottom outlet)
Fan unit
(upward outlet)
The EUAZ-16 jointing piece set is used for securing the
upper units to the lower as shown in Fig. 25. The set
consists of 6 angle brackets. Use the angle bracket as a
template and secure it to the frame section with self-tap-
ping screws. (Delning max. 1,5 m)
Fig. 25
Mounting on wall brackets
Vertical installation
The following surface is necessary for vertical installa-
tion:
Flat floor or a frame made of e.g. 50 x 50 x 5 mm angle
iron, with the outside dimensions adapted to those of the
unit, A x B mm.
N.B. Vertical installation applies only to sizes 11–32 of
standard design.
Mounting on a stand
Note.
Do not locate the stand so that the inlet or outlet or the
inspection doors are obstructed.
Use straps or mountings such as perforated straps for
securing the unit to a wall.
Size 11 20 21 22 30 31 32
A 805 805 1105 1405 1105 1405 1705
B 475 775 775 775 1075 1075 1075
Example:
Fig. 27
Fig. 28 Fig. 29
Max. 50 mm on inspection side
EUAZ-16
angle brackets
Angle iron
Flat bar
Fläkt Woods 4065 GB 05.08 5 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
EUG(A,B) – General instructions, standard design
Connecting one or several multi-function
blocks
Sealing strip is supplied loose and must thus be fitted before
the blocks are connected together. See Fig. 30 and 31.
Fig. 30
Fig. 31 15 x 5
Jointing of blocks, sizes 11–53
Internal bolted joints at the corners of the frame are used
for jointing the blocks to one another. Access to the
inside of the casing can be gained either by opening an
inspection door or by removing a wall panel. Withdraw a
unit section if it is in the way.
1. Fit the sealing strips supplied to the frame of one of
the blocks.
2. Push the blocks towards one another, making sure that
they are well lined up with one another.
3. Fit the joint bolts into the corner brackets on the
inside of the frame and make sure that they are firmly
in position.
4. Use a 14 mm spanner for the joint bolts to pull the
blocks together.
5. Tighten all four joint bolts alternately, compressing
the seal to 1–2 mm.
~35
~35
Connection to next EU block
Fit the self-tapping screws in the existing holes in the
frame profiles, and tighten the connector with a size 14
spanner.
Connection to Regoterm (EURA) and Jointing frame
(EUVH c = 3, 4)
The connector is attached to the strut with self-tapping
screws and is tightened with a size 14 spanner.
Connection to Angle section (EUTA b = 1–4)
The connector is attached to the top/bottom with self-
tapping screws and is tightened with a size 14 spanner.
Fig. 32 a
Fig. 32 b
Fig. 32 c
~ 2 mm
Fig. 32 d
Distribute the thread length equally
Left-hand screw where indicated.
Fläkt Woods 4065 GB 05.08 6 Specifications are subject to alteration without notice
EU Air Handling Unit INSTALLATION
EUG(A,B) – General instructions, standard design
To remove individual panels
Fig. 33
Bits and screws for panel assembly.
Fig. 35
Screw
Bushing
Screw
Bushing
Fig. 34
1/4 bits magnetic Self-tapping screw
4.2 ×13
Max. ø 12
Jointing of blocks, sizes 60–84
Internal bolted joints at the bolt lugs fitted along the
frame are used for jointing the blocks to one another.
Access to the inside of the casing can be gained either by
opening an inspection door or by removing a wall panel.
Some of the unit sections, such as the filter section, may
be dismantled for better access.
1. Fit the sealing strips supplied to the frame of one of
the blocks.
2. Push the blocks towards one another, making sure that
they are well lined up with one another.
3. Fit the joint bolts into the corner brackets on the
inside of the frame and make sure that they are firmly
in position.
4. Tighten the nuts alternately, compressing the seal to
1–2 mm.
Fig. 36
Fig. 37
M 10 x 160 M10
Supplied
15 x 5 sealing
strip, supplied
Compress seal
to 12 mm
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6

FläktGroup EUGA EUGB Casing Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI