Haworth 7021-6905b Operating instructions

  • Hello! I'm a chat assistant that has read the Installation Instructions for the 7021-6905 Tight Joint Connector. I understand the assembly process involves installing the ball tightener, connecting rod, and double slotted retainer, and the importance of proper alignment and flush worksurfaces. I'm ready to answer your questions about the installation process.
  • What tools are required for installation?
    What is the first step in the installation process?
    What should be aligned when installing the ball tightener?
    What should be used to keep worksurfaces flush when tightening the joint connector?
Part No: Rev:
Page:
E.C.O. No: 305-009 1 O F 1 7021-6905 B
CUSTOMER SERVICE PHONE: 1-800-426-8562
Tools Required
TIG H T JO INT
CONNECTOR
Installation Instructions
1In s ta ll b a ll tig h te n e r 2In s ta ll c o n n e c tin g r o d
NOTE!
Align hole on ball tightener with hole on
mating edge of worktop.
Align holes
Ball
Tightener
Connecting
Rod
Ball Tightening
Tool
(Provided)
3Slide opposite w orktop over connecting rod 4Install double slotted retainer and tighten
NOTE!
Before tightening joint connector use plywood and C-clamp to
keep worksurfaces flush. Shoulder of connecting rod should be
inside the double slotted retaining ring.
Double
Slotted
Retainer
Ball
Tightening
Tool
(2 pcs) Clean
Scrap Plywood
/