ABB Relion 670 series Commissioning Manual

Type
Commissioning Manual

This manual is also suitable for

Relion
®
670 SERIES
Line distance protection REL670
Version 2.2 ANSI
Commissioning manual
Document ID: 1MRK 506 371-UUS
Issued: May 2019
Revision: E
Product version: 2.2
© Copyright 2017 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written permission
from ABB, and the contents thereof must not be imparted to a third party, nor used for any
unauthorized purpose.
The software and hardware described in this document is furnished under a license and may be
used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit.
(http://www.openssl.org/) This product includes cryptographic software written/developed by:
Eric Young ([email protected]) and Tim Hudson ([email protected]).
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or product names
mentioned in this document may be trademarks or registered trademarks of their respective
holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or product
description and are not to be deemed as a statement of guaranteed properties. All persons
responsible for applying the equipment addressed in this manual must satisfy themselves that
each intended application is suitable and acceptable, including that any applicable safety or other
operational requirements are complied with. In particular, any risks in applications where a system
failure and/or product failure would create a risk for harm to property or persons (including but
not limited to personal injuries or death) shall be the sole responsibility of the person or entity
applying the equipment, and those so responsible are hereby requested to ensure that all
measures are taken to exclude or mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be completely ruled out.
In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other
than under explicit contractual commitments, in no event shall ABB be responsible or liable for any
loss or damage resulting from the use of this manual or the application of the equipment.
Conformity
This product complies with the directive of the Council of the European Communities on the
approximation of the laws of the Member States relating to electromagnetic compatibility (EMC
Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage
limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB
in accordance with the product standard EN 60255-26 for the EMC directive, and with the product
standards EN 60255-1 and EN 60255-27 for the low voltage directive. The product is designed in
accordance with the international standards of the IEC 60255 series and ANSI C37.90. The DNP
protocol implementation in the IED conforms to "DNP3 Intelligent Electronic Device (IED)
Certification Procedure Subset Level 2", available at
www.dnp.org.
Table of contents
Section 1 Introduction............................................................................................................ 13
1.1 This manual.............................................................................................................................................. 13
1.2 Intended audience.................................................................................................................................. 13
1.3 Product documentation........................................................................................................................ 14
1.3.1 Product documentation set............................................................................................................. 14
1.3.2 Document revision history............................................................................................................... 15
1.3.3 Related documents............................................................................................................................ 15
1.4 Document symbols and conventions................................................................................................. 16
1.4.1 Symbols................................................................................................................................................ 16
1.4.2 Document conventions..................................................................................................................... 17
1.5 IEC 61850 edition 1 / edition 2 mapping............................................................................................ 17
Section 2 Safety information.................................................................................................27
2.1 Symbols on the product........................................................................................................................ 27
2.2 Warnings...................................................................................................................................................27
2.3 Caution signs...........................................................................................................................................28
2.4 Note signs................................................................................................................................................ 29
Section 3 Available functions................................................................................................ 31
3.1 Main protection functions.....................................................................................................................31
3.2 Back-up protection functions.............................................................................................................. 32
3.3 Control and monitoring functions...................................................................................................... 33
3.4 Communication...................................................................................................................................... 39
3.5 Basic IED functions................................................................................................................................ 42
Section 4 Starting up..............................................................................................................45
4.1 Factory and site acceptance testing.................................................................................................. 45
4.2 Commissioning checklist......................................................................................................................45
4.3 Checking the power supply..................................................................................................................46
4.4 Energizing the IED..................................................................................................................................46
4.4.1 Checking the IED operation............................................................................................................. 46
4.4.2 IED start-up sequence.......................................................................................................................46
4.5 Setting up communication between PCM600 and the IED............................................................47
4.6 Writing an application configuration to the IED.............................................................................. 52
4.7 Checking CT circuits...............................................................................................................................52
4.8 Checking VT circuits...............................................................................................................................53
4.9 Using the RTXP test switch.................................................................................................................. 53
4.10 Checking the binary input/output circuits....................................................................................... 54
4.10.1 Binary input circuits...........................................................................................................................54
Table of contents
Line distance protection REL670 1
Commissioning manual
© Copyright 2017 ABB. All rights reserved
4.10.2 Binary output circuits........................................................................................................................54
4.11 Checking optical connections..............................................................................................................54
Section 5 Configuring the IED and changing settings....................................................... 57
5.1 Overview................................................................................................................................................... 57
5.2 Configuring analog CT inputs.............................................................................................................. 57
5.3 Supervision of input/output modules............................................................................................... 58
Section 6 Establishing connection and verifying the SPA/IEC communication.............59
6.1 Entering settings....................................................................................................................................59
6.1.1 Entering SPA settings....................................................................................................................... 59
6.1.2 Entering IEC settings........................................................................................................................ 59
6.2 Verifying the communication.............................................................................................................. 60
6.2.1 Verifying SPA communication.........................................................................................................60
6.2.2 Verifying IEC communication..........................................................................................................60
6.3 Fiber optic loop...................................................................................................................................... 60
6.4 Optical budget calculation for serial communication with SPA/IEC .......................................... 61
Section 7 Establishing connection and verifying the LON communication.................... 63
7.1 Communication via the rear ports ..................................................................................................... 63
7.1.1 LON communication..........................................................................................................................63
7.1.2 The LON Protocol...............................................................................................................................64
7.1.3 Hardware and software modules................................................................................................... 64
7.2 Optical budget calculation for serial communication with LON ................................................. 66
Section 8 Establishing connection and verifying the IEC 61850 communication.......... 67
8.1 Overview................................................................................................................................................... 67
8.2 Setting the station communication....................................................................................................67
8.3 Verifying the communication...............................................................................................................67
Section 9 Establishing connection and verifying the IEEE C37.118/1344
communication...................................................................................................... 69
9.1 Overview...................................................................................................................................................69
9.2 Setting the PMU station communication (PMU Report)................................................................ 69
9.3 Setting the PMU station communication (PMU configuration)................................................... 69
9.4 Setting the TCP/UDP client communication.................................................................................... 70
9.5 Verifying the communication...............................................................................................................74
9.5.1 Verifying the IEEE C37.118/1344 TCP communication................................................................74
9.5.2 Verifying the IEEE C37.118/1344 UDP communication...............................................................80
9.6 Optical budget calculation for PMU - PDC communication........................................................... 81
Section 10 Testing IED operation........................................................................................... 83
10.1 Preparing for test................................................................................................................................... 83
10.1.1 Requirements......................................................................................................................................83
10.1.2 Preparing the IED to verify settings...............................................................................................84
Table of contents
2 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
10.2 Activating the test mode...................................................................................................................... 85
10.3 Preparing the connection to the test equipment............................................................................86
10.4 Connecting the test equipment to the IED.......................................................................................86
10.5 Releasing the function to be tested................................................................................................... 87
10.6 Verifying analog primary and secondary measurement................................................................ 88
10.7 Testing the protection functionality.................................................................................................. 89
10.8 Forcing of binary input/output signals for testing........................................................................ 89
10.8.1 Forcing concept................................................................................................................................. 89
10.8.2 How to enable forcing...................................................................................................................... 90
10.8.2.1 Enable forcing by using LHMI...................................................................................................... 90
10.8.2.2 Enable forcing using TESTMODE function block..................................................................... 90
10.8.3 How to change binary input/output signals using forcing...................................................... 90
10.8.3.1 Forcing by using LHMI....................................................................................................................91
10.8.3.2 Forcing by using PCM600............................................................................................................. 92
10.8.4 How to undo forcing changes and return the IED to normal operation.................................94
10.8.4.1 Undo forcing by using TESTMODE component....................................................................... 94
10.8.4.2 Undo forcing by using LHMI.........................................................................................................94
10.8.4.3 Undo forcing by using PCM600...................................................................................................94
Section 11 Testing functionality by secondary injection.................................................... 97
11.1 Testing disturbance report.................................................................................................................. 97
11.1.1 Introduction........................................................................................................................................ 97
11.1.2 Disturbance report settings............................................................................................................ 97
11.1.3 Disturbance recorder (DR)................................................................................................................97
11.1.4 Event recorder (ER) and Event list (EL)..........................................................................................98
11.2 Identifying the function to test in the technical reference manual ............................................ 98
11.3 Differential protection.......................................................................................................................... 99
11.3.1 High impedance differential protection HZPDIF (87)................................................................ 99
11.3.1.1 Verifying the settings.................................................................................................................... 99
11.3.1.2 Completing the test....................................................................................................................... 99
11.3.2 Additional security logic for differential protection LDRGFC (11)......................................... 100
11.3.2.1 Verifying the settings.................................................................................................................. 100
11.3.2.2 Completing the test......................................................................................................................101
11.4 Impedance protection......................................................................................................................... 101
11.4.1 Distance protection zones, quadrilateral characteristic ZMQPDIS (21)................................101
11.4.1.1 Measuring the operating limit of set values........................................................................... 104
11.4.1.2 Measuring the operating time of distance protection zones..............................................105
11.4.1.3 Completing the test..................................................................................................................... 105
11.4.2 Phase selection, quad, fixed angle, load encroachment FDPSPDIS (21)............................... 105
11.4.2.1 Measuring the operating limit of set values........................................................................... 108
11.4.2.2 Completing the test..................................................................................................................... 108
11.4.3 Full scheme distance protection, mho characteristic ZMHPDIS (21).................................... 108
11.4.3.1 Phase-to-phase faults..................................................................................................................109
Table of contents
Line distance protection REL670 3
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.4.3.2 Phase-to-ground faults............................................................................................................... 109
11.4.4 Faulty phase identification with load encroachment FMPSPDIS (21).................................... 110
11.4.5 Distance protection zones, quadrilateral characteristic, separate settings ZMRPDIS
(21)....................................................................................................................................................... 110
11.4.5.1 Measuring the operating limit of set values............................................................................114
11.4.5.2 Measuring the operating time of distance protection zones.............................................. 114
11.4.6 Phase selection, quadrilateral characteristic with settable angle FRPSPDIS (21)............... 115
11.4.6.1 Measuring the operating limit of set values............................................................................ 117
11.4.6.2 Completing the test......................................................................................................................117
11.4.7 High speed distance protection zones, quadrilateral and mho characteristic
ZMFPDIS (21)......................................................................................................................................118
11.4.7.1 Measuring the operating limit of set values............................................................................ 121
11.4.7.2 Measuring the operating time of distance protection zones.............................................. 122
11.4.7.3 Completing the test......................................................................................................................122
11.4.8 High Speed distance for series compensated line zones, quadrilateral and mho
characteristic ZMFCPDIS (21).........................................................................................................122
11.4.8.1 Measuring the operating limit of set values............................................................................125
11.4.8.2 Measuring the operating time of distance protection zones..............................................126
11.4.8.3 Transient directional element.................................................................................................... 126
11.4.8.4 Completing the test..................................................................................................................... 126
11.4.9 Power swing detection ZMRPSB (68)........................................................................................... 127
11.4.9.1 Verifying the signal and settings............................................................................................... 127
11.4.9.2 Completing the test......................................................................................................................133
11.4.10 Power swing logic PSLPSCH...........................................................................................................133
11.4.10.1 Testing the carrier send and trip signals................................................................................. 133
11.4.10.2 Testing the influence of the residual overcurrent protection............................................. 134
11.4.10.3 Checking the underreaching zone............................................................................................. 134
11.4.10.4 Completing the test..................................................................................................................... 134
11.4.11 Pole slip protection PSPPPAM (78)............................................................................................... 135
11.4.11.1 Verifying the settings...................................................................................................................135
11.4.11.2 Completing the test......................................................................................................................137
11.4.12 Out-of-step protection OOSPPAM................................................................................................137
11.4.12.1 Verifying the settings...................................................................................................................138
11.4.12.2 Test of point RE (R
FwdR
, X
FwdX
)...................................................................................................142
11.4.12.3 Test of the boundary between zone 1 and zone 2, which is defined by the
parameter
ReachZ1
...................................................................................................................... 146
11.4.12.4 Test of the point SE (R
RvsR
, X
RvsX
).............................................................................................. 150
11.4.13 Automatic switch onto fault logic ZCVPSOF..............................................................................154
11.4.13.1 Activating ZCVPSOF externally.................................................................................................. 154
11.4.13.2 Initiating ZCVPSOF automatically and setting mode to impedance................................. 155
11.4.13.3 Initiating ZCVPSOF automatically and setting mode to VILevel ........................................ 155
11.4.13.4 Completing the test..................................................................................................................... 155
11.4.14 Phase preference logic PPLPHIZ .................................................................................................. 155
Table of contents
4 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.4.14.1 Completing the test..................................................................................................................... 156
11.4.15 Phase preference logic PPL2PHIZ................................................................................................. 156
11.4.16 Completing the test.........................................................................................................................157
11.5 Current protection................................................................................................................................157
11.5.1 Instantaneous phase overcurrent protection 3-phase output PHPIOC (50)........................157
11.5.1.1 Measuring the trip limit of set values....................................................................................... 158
11.5.1.2 Completing the test..................................................................................................................... 158
11.5.2 Directional phase overcurrent protection, four steps OC4PTOC (51_67)............................ 158
11.5.2.1 Verifying the settings...................................................................................................................158
11.5.2.2 Completing the test..................................................................................................................... 159
11.5.3 Instantaneous residual overcurrent protection EFPIOC (50N)...............................................159
11.5.3.1 Measuring the trip limit of set values.......................................................................................160
11.5.3.2 Completing the test..................................................................................................................... 160
11.5.4 Four step residual overcurrent protection, (Zero sequence or negative sequence
directionality) EF4PTOC (51N/67N)............................................................................................. 160
11.5.4.1 Four step directional ground fault protection....................................................................... 160
11.5.4.2 Four step non-directional ground fault protection................................................................161
11.5.4.3 Completing the test......................................................................................................................161
11.5.5 Four step negative sequence overcurrent protection NS4PTOC (46I2)................................161
11.5.5.1 Completing the test..................................................................................................................... 162
11.5.6 Sensitive directional residual overcurrent and power protection SDEPSDE (67N)............ 162
11.5.6.1 Measuring the trip and time limit for set values.................................................................... 163
11.5.6.2 Completing the test..................................................................................................................... 167
11.5.7 Thermal overload protection, one time constant, Fahrenheit/Celsius LFPTTR/
LCPTTR (26)....................................................................................................................................... 168
11.5.7.1 Measuring the trip and time limit of set values......................................................................168
11.5.7.2 Completing the test..................................................................................................................... 168
11.5.8 Breaker failure protection, phase segregated activation and output CCRBRF (50BF)..... 169
11.5.8.1 Checking the phase current trip value,
Pickup_PH
................................................................ 169
11.5.8.2 Checking the residual (ground fault) current trip value
Pickup_N
set below
Pickup_PH
....................................................................................................................169
11.5.8.3 Checking the re-trip and back-up times.................................................................................. 169
11.5.8.4 Verifying the re-trip mode...........................................................................................................170
11.5.8.5 Verifying the back-up trip mode................................................................................................ 170
11.5.8.6 Verifying instantaneous back-up trip at CB faulty condition...............................................171
11.5.8.7 Verifying the case
FunctionMode
=
CB Pos
............................................................................. 172
11.5.8.8 Verifying the case
RetripMode
=
Contact
................................................................................ 172
11.5.8.9 Verifying the case
FunctionMode
=
Current
or
CB Pos
........................................................... 172
11.5.8.10 Verifying the external start signal has timed out................................................................... 173
11.5.8.11 Verifying that backup signal is released when STALARM is reset.......................................173
11.5.8.12 Test of
FollowStart&Mode
behaviour....................................................................................... 174
11.5.8.13 Test of
FollowStart
behaviour....................................................................................................174
11.5.8.14 Completing the test..................................................................................................................... 174
Table of contents
Line distance protection REL670 5
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.5.9 Stub protection STBPTOC (50STB)...............................................................................................174
11.5.9.1 Measuring the trip limit of set values....................................................................................... 174
11.5.9.2 Completing the test......................................................................................................................175
11.5.10 Pole discrepancy protection CCPDSC (52PD).............................................................................175
11.5.10.1 Verifying the settings...................................................................................................................175
11.5.10.2 Completing the test..................................................................................................................... 176
11.5.11 Directional underpower protection GUPPDUP (37)...................................................................176
11.5.11.1 Verifying the settings...................................................................................................................176
11.5.11.2 Completing the test..................................................................................................................... 178
11.5.12 Directional overpower protection GOPPDOP (32)..................................................................... 178
11.5.12.1 Verifying the settings...................................................................................................................178
11.5.12.2 Completing the test..................................................................................................................... 178
11.5.13 Broken conductor check BRCPTOC (46)...................................................................................... 179
11.5.13.1 Measuring the trip and time limit of set values......................................................................179
11.5.13.2 Completing the test..................................................................................................................... 179
11.5.14 Voltage-restrained time overcurrent protection VRPVOC(51V)..............................................179
11.5.14.1 Verifying the settings...................................................................................................................179
11.5.14.2 Completing the test..................................................................................................................... 182
11.6 Voltage protection............................................................................................................................... 183
11.6.1 Two step undervoltage protection UV2PTUV (27).....................................................................183
11.6.1.1 Verifying the settings...................................................................................................................183
11.6.1.2 Completing the test..................................................................................................................... 184
11.6.2 Two step overvoltage protection OV2PTOV (59)...................................................................... 184
11.6.2.1 Verifying the settings.................................................................................................................. 184
11.6.2.2 Extended testing...........................................................................................................................185
11.6.2.3 Completing the test..................................................................................................................... 185
11.6.3 Two step residual overvoltage protection ROV2PTOV (59N)..................................................185
11.6.3.1 Verifying the settings...................................................................................................................185
11.6.3.2 Completing the test..................................................................................................................... 186
11.6.4 Overexcitation protection OEXPVPH (24)...................................................................................186
11.6.4.1 Verifying the settings.................................................................................................................. 186
11.6.4.2 Completing the test..................................................................................................................... 187
11.6.5 Voltage differential protection VDCPTOV (60).......................................................................... 187
11.6.5.1 Check of undervoltage levels...................................................................................................... 187
11.6.5.2 Check of voltage differential trip and alarm levels................................................................ 189
11.6.5.3 Check of trip and trip reset timers............................................................................................190
11.6.5.4 Final adjustment of compensation for VT ratio differences ............................................... 191
11.6.5.5 Completing the test......................................................................................................................191
11.6.6 Loss of voltage check LOVPTUV (27)............................................................................................ 191
11.6.6.1 Measuring the trip limit of set values....................................................................................... 191
11.6.6.2 Completing the test..................................................................................................................... 192
11.6.7 Radial feeder protection PAPGAPC (27).......................................................................................192
11.6.7.1 Verifying the settings...................................................................................................................192
Table of contents
6 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.6.7.2 Completing the test..................................................................................................................... 193
11.7 Frequency protection.......................................................................................................................... 193
11.7.1 Underfrequency protection SAPTUF (81).................................................................................... 193
11.7.1.1 Verifying the settings.................................................................................................................. 194
11.7.1.2 Completing the test..................................................................................................................... 194
11.7.2 Overfrequency protection SAPTOF (81)...................................................................................... 195
11.7.2.1 Verifying the settings...................................................................................................................195
11.7.2.2 Completing the test..................................................................................................................... 195
11.7.3 Rate-of-change frequency protection SAPFRC (81).................................................................. 195
11.7.3.1 Verifying the settings.................................................................................................................. 196
11.7.3.2 Completing the test..................................................................................................................... 196
11.8 Multipurpose protection.....................................................................................................................196
11.8.1 General current and voltage protection CVGAPC......................................................................196
11.8.1.1 Built-in overcurrent feature (non-directional).........................................................................197
11.8.1.2 Overcurrent feature with current restraint..............................................................................197
11.8.1.3 Overcurrent feature with voltage restraint............................................................................. 197
11.8.1.4 Overcurrent feature with directionality................................................................................... 198
11.8.1.5 Over/Undervoltage feature........................................................................................................ 198
11.8.1.6 Completing the test..................................................................................................................... 199
11.9 Secondary system supervision.......................................................................................................... 199
11.9.1 Current circuit supervision CCSSPVC (87).................................................................................. 199
11.9.1.1 Verifying the settings.................................................................................................................. 199
11.9.1.2 Completing the test..................................................................................................................... 199
11.9.2 Fuse failure supervision FUFSPVC................................................................................................199
11.9.2.1 Checking that the binary inputs and outputs trip as expected ......................................... 199
11.9.2.2 Measuring the trip value for the negative sequence function ........................................... 200
11.9.2.3 Measuring the trip value for the zero-sequence function ................................................... 201
11.9.2.4 Measuring the
trip
value for the dead line detection function........................................... 202
11.9.2.5 Checking the operation of the dv/dt and di/dt based function ....................................... 202
11.9.2.6 Completing the test.....................................................................................................................203
11.9.3 Fuse failure supervision .................................................................................................................203
11.9.3.1 Completing the test.....................................................................................................................204
11.9.4 Voltage based delta supervision DELVSPVC..............................................................................204
11.9.4.1 Verifying the signals and settings............................................................................................ 204
11.9.4.2 Completing the test.....................................................................................................................205
11.9.5 Current based delta supervision DELISPVC(7I)......................................................................... 205
11.9.5.1 Verifying the signals and settings............................................................................................ 205
11.9.5.2 Completing the test.....................................................................................................................206
11.9.6 Delta supervision of real input DELSPVC....................................................................................206
11.9.6.1 Verifying the signals and settings............................................................................................ 206
11.9.6.2 Completing the test..................................................................................................................... 207
11.10 Control....................................................................................................................................................207
11.10.1 Synchrocheck, energizing check, and synchronizing SESRSYN (25)......................................207
Table of contents
Line distance protection REL670 7
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.10.1.1 Testing the synchronizing function..........................................................................................208
11.10.1.2 Testing the synchrocheck functionality...................................................................................209
11.10.1.3 Testing the energizing check...................................................................................................... 211
11.10.1.4 Testing the voltage selection..................................................................................................... 212
11.10.1.5 Completing the test..................................................................................................................... 214
11.10.2 Autorecloser for 1/2/3-phase operation SMBRREC (79).......................................................... 214
11.10.2.1 Preparation of the verification ..................................................................................................216
11.10.2.2 Switching the auto recloser to On and Off
Enabled
and
Disabled
......................................217
11.10.2.3 Verifying the auto recloser ......................................................................................................... 217
11.10.2.4 Checking the auto reclosing conditions...................................................................................218
11.10.2.5 Completing the test..................................................................................................................... 219
11.10.3 Apparatus control APC....................................................................................................................220
11.10.4 Single command, 16 signals SINGLECMD................................................................................... 220
11.10.5 Interlocking....................................................................................................................................... 220
11.11 Scheme communication..................................................................................................................... 220
11.11.1 Scheme communication logic for distance or overcurrent protection ZCPSCH (85)........220
11.11.1.1 Testing permissive underreaching............................................................................................221
11.11.1.2 Testing permissive overreaching...............................................................................................221
11.11.1.3 Testing blocking scheme.............................................................................................................221
11.11.1.4 Testing delta blocking scheme.................................................................................................. 222
11.11.1.5 Checking of unblocking logic..................................................................................................... 222
11.11.1.6 Completing the test..................................................................................................................... 222
11.11.2 Phase segregated scheme communication logic for distance or overcurrent
protection ZC1PPSCH (85)............................................................................................................. 223
11.11.2.1 Testing permissive underreaching............................................................................................223
11.11.2.2 Testing permissive overreaching.............................................................................................. 223
11.11.2.3 Testing blocking scheme.............................................................................................................223
11.11.2.4 Completing the test..................................................................................................................... 224
11.11.3 Current reversal and Weak-end infeed logic for distance protection 3-phase
ZCRWPSCH (85)................................................................................................................................224
11.11.3.1 Current reversal logic...................................................................................................................224
11.11.3.2 Weak end infeed logic.................................................................................................................. 225
11.11.3.3 Completing the test..................................................................................................................... 226
11.11.4 Local acceleration logic ZCLCPSCH............................................................................................. 226
11.11.4.1 Verifying the settings.................................................................................................................. 226
11.11.4.2 Completing the test..................................................................................................................... 226
11.11.5 Scheme communication logic for residual overcurrent protection ECPSCH (85).............. 226
11.11.5.1 Testing the directional comparison logic function................................................................227
11.11.5.2 Completing the test..................................................................................................................... 228
11.11.6 Current reversal and weak-end infeed logic for residual overcurrent protection
ECRWPSCH (85)................................................................................................................................ 228
11.11.6.1 Testing the current reversal logic..............................................................................................228
11.11.6.2 Testing the weak-end infeed logic............................................................................................229
Table of contents
8 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.11.6.3 Completing the test..................................................................................................................... 230
11.11.7 Direct transfer trip logic.................................................................................................................230
11.11.7.1 Low active power and power factor local criteria LAPPGAPC (37_55)...............................230
11.11.7.2 Compensated over- and undervoltage protection COUVGAPC (59_27)............................ 231
11.11.7.3 Sudden change in current variation SCCVPTOC (51)............................................................. 232
11.11.7.4 Carrier receive logic LCCRPTRC (94).........................................................................................233
11.11.7.5 Negative sequence overvoltage protection LCNSPTOV (47)...............................................234
11.11.7.6 Zero sequence overvoltage protection LCZSPTOV (59N).................................................... 235
11.11.7.7 Negative sequence overcurrent protection LCNSPTOC (46)...............................................236
11.11.7.8 Zero sequence overcurrent protection LCZSPTOC (51N)..................................................... 237
11.11.7.9 Three phase overcurrent LCP3PTOC (51)................................................................................. 237
11.11.7.10 Three phase undercurrent LCP3PTUC (37)...............................................................................237
11.12 Logic........................................................................................................................................................238
11.12.1 Tripping logic, common 3-phase output SMPPTRC (94)......................................................... 238
11.12.1.1 3 phase operating mode............................................................................................................. 238
11.12.1.2 1p/3p operating mode................................................................................................................ 238
11.12.1.3 1p/2p/3p operating mode..........................................................................................................239
11.12.1.4 Circuit breaker lockout................................................................................................................240
11.12.1.5 Completing the test.....................................................................................................................240
11.13 Monitoring.............................................................................................................................................240
11.13.1 Gas medium supervision SSIMG................................................................................................... 240
11.13.1.1 Testing the gas medium supervision for pressure alarm and pressure lockout
conditions.......................................................................................................................................241
11.13.1.2 Testing the gas medium supervision for temperature alarm and temperature lock
out conditions............................................................................................................................... 241
11.13.1.3 Completing the test..................................................................................................................... 241
11.13.2 Liquid medium supervision SSIML................................................................................................241
11.13.2.1 Testing the liquid medium supervision for level alarm and level lockout conditions.....242
11.13.2.2 Testing the liquid medium supervision for temperature alarm and temperature
lock out conditions.......................................................................................................................242
11.13.2.3 Completing the test..................................................................................................................... 242
11.13.3 Breaker monitoring SSCBR............................................................................................................ 242
11.13.3.1 Verifying the settings.................................................................................................................. 243
11.13.3.2 Completing the test.....................................................................................................................244
11.13.4 Event function EVENT..................................................................................................................... 244
11.13.5 Fault locator LMBRFLO...................................................................................................................244
11.13.5.1 Measuring the operate limit.......................................................................................................245
11.13.5.2 Completing the test.....................................................................................................................246
11.13.6 Limit counter L4UFCNT.................................................................................................................. 246
11.13.6.1 Completing the test.....................................................................................................................246
11.13.7 Through fault monitoring PTRSTHR (51TF)................................................................................246
11.13.7.1 Verifying the signals and settings............................................................................................ 246
11.13.7.2 Completing the test..................................................................................................................... 247
Table of contents
Line distance protection REL670 9
Commissioning manual
© Copyright 2017 ABB. All rights reserved
11.13.8 Current harmonic monitoring CHMMHAI(ITHD)........................................................................247
11.13.8.1 Verifying the signals and settings............................................................................................ 248
11.13.8.2 Completing the test.....................................................................................................................248
11.13.9 Voltage harmonic monitoring VHMMHAI(VTHD)...................................................................... 248
11.13.9.1 Verifying the signals and settings............................................................................................ 249
11.13.9.2 Completing the test.....................................................................................................................249
11.14 Metering................................................................................................................................................. 249
11.14.1 Pulse-counter logic PCFCNT.......................................................................................................... 249
11.14.2 Function for energy calculation and demand handling ETPMMTR........................................249
11.14.2.1 Verifying the settings.................................................................................................................. 250
11.14.2.2 Completing the test..................................................................................................................... 251
11.15 Station communication.......................................................................................................................251
11.15.1 Multiple command and transmit MULTICMDRCV / MULTICMDSND..................................... 251
11.16 Remote communication...................................................................................................................... 251
11.16.1 Binary signal transfer.......................................................................................................................251
11.17 Basic IED functions...............................................................................................................................252
11.17.1 Parameter setting group handling SETGRPS............................................................................. 252
11.17.1.1 Verifying the settings.................................................................................................................. 253
11.17.1.2 Completing the test..................................................................................................................... 253
11.18 Exit test mode.......................................................................................................................................253
Section 12 Checking the directionality................................................................................ 255
12.1 Overview.................................................................................................................................................255
12.2 Testing the directionality of the distance protection.................................................................. 255
Section 13 Commissioning and maintenance of the fault clearing system.................... 257
13.1 Commissioning tests...........................................................................................................................257
13.2 Periodic maintenance tests................................................................................................................257
13.2.1 Visual inspection.............................................................................................................................. 258
13.2.2 Maintenance tests........................................................................................................................... 258
13.2.2.1 Preparation.................................................................................................................................... 258
13.2.2.2 Recording....................................................................................................................................... 258
13.2.2.3 Secondary injection......................................................................................................................259
13.2.2.4 Alarm test.......................................................................................................................................259
13.2.2.5 Self supervision check................................................................................................................. 259
13.2.2.6 Trip circuit check...........................................................................................................................259
13.2.2.7 Measurement of service currents............................................................................................. 260
13.2.2.8 Restoring........................................................................................................................................260
Section 14 Troubleshooting...................................................................................................261
14.1 Checking the self supervision signals.............................................................................................. 261
14.1.1 Checking the self supervision function........................................................................................261
14.1.1.1 Determine the cause of an internal failure...............................................................................261
14.1.2 Self supervision HMI data............................................................................................................... 261
Table of contents
10 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
14.1.2.1 General IED status........................................................................................................................ 261
14.2 Fault tracing.......................................................................................................................................... 262
14.2.1 Internal fault indications................................................................................................................ 262
14.2.2 Using front-connected PC..............................................................................................................263
14.2.3 Diagnosing the IED status via the LHMI hint menu.................................................................. 265
14.2.4 Hardware re-configuration............................................................................................................ 266
14.3 Repair instruction.................................................................................................................................267
14.4 Repair support...................................................................................................................................... 268
14.5 Maintenance.......................................................................................................................................... 268
Section 15 Glossary................................................................................................................ 269
Table of contents
Line distance protection REL670 11
Commissioning manual
© Copyright 2017 ABB. All rights reserved
12
Section 1 Introduction
1.1 This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v19
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the
IED, parameter setting and configuration as well as verifying settings by secondary injection. The
manual describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be commissioned. The
relevant procedures may be followed also during the service and maintenance activities.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance and taking the
IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic equipment. The
commissioning and maintenance personnel must be well experienced in using protection
equipment, test equipment, protection functions and the configured functional logics in the IED.
1MRK 506 371-UUS E Section 1
Introduction
Line distance protection REL670 13
Commissioning manual
© Copyright 2017 ABB. All rights reserved
1.3 Product documentation
1.3.1 Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v16
IEC07000220-4-en.vsd
P
l
a
n
n
i
n
g
&
p
u
r
c
h
a
s
e
E
n
g
i
n
e
e
r
i
n
g
I
n
s
t
a
l
l
i
n
g
C
o
m
m
i
s
s
i
o
n
i
n
g
O
p
e
r
a
t
i
o
n
M
a
i
n
t
e
n
a
n
c
e
D
e
c
o
m
m
i
s
s
i
o
n
i
n
g
D
e
i
n
s
t
a
l
l
i
n
g
&
d
i
s
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the various tools
available within the PCM600 software. The manual provides instructions on how to set up a
PCM600 project and insert IEDs to the project structure. The manual also recommends a sequence
for the engineering of protection and control functions, as well as communication engineering for
IEC 61850.
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the
chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the
IED, parameter setting and configuration as well as verifying settings by secondary injection. The
manual describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be commissioned. The
relevant procedures may be followed also during the service and maintenance activities.
Section 1 1MRK 506 371-UUS E
Introduction
14 Line distance protection REL670
Commissioning manual
© Copyright 2017 ABB. All rights reserved
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284

ABB Relion 670 series Commissioning Manual

Type
Commissioning Manual
This manual is also suitable for