ABB RELION 650 SERIES Operating instructions

Type
Operating instructions
Relion
®
650 SERIES
650 series
Version 1.3 ANSI
Operation manual
Document ID: 1MRK 500 096-UUS
Issued: November 2019
Revision: B
Product version: 1.3
© Copyright 2013 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written permission
from ABB, and the contents thereof must not be imparted to a third party, nor used for any
unauthorized purpose.
The software and hardware described in this document is furnished under a license and may be
used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the OpenSSL Toolkit.
(http://www.openssl.org/)
This product includes cryptographic software written/developed by: Eric Young
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or product names
mentioned in this document may be trademarks or registered trademarks of their respective
holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
ABB AB
Grid Automation Products
SE-721 59 Västerås
Sweden
Telephone: +46 (0) 21 32 50 00
Facsimile: +46 (0) 21 14 69 18
http://www.abb.com/protection-control
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or product
description and are not to be deemed as a statement of guaranteed properties. All persons
responsible for applying the equipment addressed in this manual must satisfy themselves that
each intended application is suitable and acceptable, including that any applicable safety or other
operational requirements are complied with. In particular, any risks in applications where a system
failure and/or product failure would create a risk for harm to property or persons (including but
not limited to personal injuries or death) shall be the sole responsibility of the person or entity
applying the equipment, and those so responsible are hereby requested to ensure that all
measures are taken to exclude or mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be completely ruled out.
In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other
than under explicit contractual commitments, in no event shall ABB be responsible or liable for any
loss or damage resulting from the use of this manual or the application of the equipment.
Conformity
This product complies with the directive of the Council of the European Communities on the
approximation of the laws of the Member States relating to electromagnetic compatibility (EMC
Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage
limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB
in accordance with the product standards EN 50263 and EN 60255-26 for the EMC directive, and
with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive. The product
is designed in accordance with the international standards of the IEC 60255 series and ANSI
C37.90. The DNP protocol implementation in the IED conforms to "DNP3 Intelligent Electronic
Device (IED) Certification Procedure Subset Level 2", available at www.dnp.org.
Table of contents
Section 1 Introduction......................................................................................................... 5
1.1 This manual.......................................................................................................................................... 5
1.2 Intended audience.............................................................................................................................. 5
1.3 Product documentation.....................................................................................................................6
1.3.1 Product documentation set............................................................................................................6
1.3.2 Document revision history.............................................................................................................. 7
1.3.3 Related documents...........................................................................................................................7
1.4 Symbols and conventions................................................................................................................. 9
1.4.1 Symbols...............................................................................................................................................9
1.4.2 Document conventions....................................................................................................................9
1.4.3 Functions included in 650 series IEDs........................................................................................ 10
Section 2 Safety information............................................................................................ 17
2.1 Symbols on the product................................................................................................................... 17
2.2 Warnings..............................................................................................................................................17
2.3 Caution signs..................................................................................................................................... 18
2.4 Note signs...........................................................................................................................................19
Section 3 Environmental aspects......................................................................................21
3.1 Sustainable development................................................................................................................ 21
3.2 Disposing of the IED......................................................................................................................... 21
Section 4 650 series overview...........................................................................................23
4.1 Local HMI.............................................................................................................................................23
4.1.1 Display...............................................................................................................................................23
4.1.2 LEDs...................................................................................................................................................26
4.1.3 Keypad.............................................................................................................................................. 26
4.1.4 Local HMI functionality.................................................................................................................. 29
4.1.4.1 Protection and alarm indication.............................................................................................29
4.1.4.2 Parameter management ......................................................................................................... 31
4.1.4.3 Front communication............................................................................................................... 31
4.1.4.4 Single-line diagram................................................................................................................... 32
4.2 Authorization..................................................................................................................................... 33
4.3 Communication.................................................................................................................................34
4.4 PCM600 tool.......................................................................................................................................35
4.4.1 Connectivity packages...................................................................................................................35
4.5 Cyber security guidelines................................................................................................................ 36
4.5.1 Predefined user roles..................................................................................................................... 36
4.5.2 IP ports..............................................................................................................................................38
Table of contents
650 series 1
Operation manual
© Copyright 2013 ABB. All rights reserved
Section 5 Using the HMI..................................................................................................... 41
5.1 Using the local HMI........................................................................................................................... 41
5.1.1 Logging on....................................................................................................................................... 41
5.1.2 Logging off...................................................................................................................................... 44
5.1.3 Turning the display backlight on................................................................................................. 45
5.1.4 Selecting local or remote use.......................................................................................................45
5.1.5 Identifying the device.................................................................................................................... 45
5.1.6 Adjusting the display contrast.....................................................................................................46
5.1.7 Changing the local HMI language................................................................................................47
5.1.8 Navigating in the menu................................................................................................................. 47
5.1.8.1 Menu structure.......................................................................................................................... 48
5.1.8.2 Scrolling the display................................................................................................................. 48
5.1.8.3 Changing the default view...................................................................................................... 48
5.1.9 Using function buttons................................................................................................................. 49
5.1.10 Using the single-line diagram...................................................................................................... 50
5.1.11 Browsing setting values................................................................................................................50
5.1.12 Editing values...................................................................................................................................51
5.1.12.1 Editing numerical values.......................................................................................................... 52
5.1.12.2 Editing string values.................................................................................................................53
5.1.12.3 Editing enumerated values......................................................................................................53
5.1.12.4 Changing time settings in LHMI.............................................................................................53
5.1.13 Saving settings................................................................................................................................54
5.1.14 Clearing and acknowledging........................................................................................................ 54
5.1.15 Using the local HMI help................................................................................................................ 55
Section 6 IED operation .....................................................................................................57
6.1 Normal operation.............................................................................................................................. 57
6.2 Disturbance identification.............................................................................................................. 57
6.2.1 DFR recording triggering.............................................................................................................. 58
6.2.2 DFR record analysis........................................................................................................................58
6.2.3 DFR reports......................................................................................................................................58
6.2.4 IED self-supervision........................................................................................................................58
6.3 IED parameterization....................................................................................................................... 58
6.3.1 IED settings for IED functionality................................................................................................59
6.3.2 IED settings for different operating conditions...................................................................... 59
Section 7 Operating procedures.......................................................................................61
7.1 Monitoring.......................................................................................................................................... 61
7.1.1 Indications........................................................................................................................................61
7.1.1.1 Using auto-indication messages............................................................................................61
7.1.1.2 Monitoring alarm data............................................................................................................. 62
7.1.1.3 Monitoring an internal IED fault ............................................................................................ 63
7.1.1.4 Monitoring condition monitoring data................................................................................ 64
Table of contents
2 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
7.1.2 Measured and calculated values..................................................................................................64
7.1.2.1 Measured values........................................................................................................................64
7.1.2.2 Using the local HMI for monitoring....................................................................................... 64
7.1.3 Recorded data................................................................................................................................. 65
7.1.3.1 Creating disturbance recordings...........................................................................................65
7.1.3.2 Monitoring disturbance recorder data.................................................................................66
7.1.3.3 Controlling and uploading DFR recorder data.................................................................... 67
7.1.3.4 Monitoring events..................................................................................................................... 67
7.1.4 Remote monitoring........................................................................................................................ 67
7.1.4.1 Monitoring the IED remotely.................................................................................................. 68
7.2 Controlling..........................................................................................................................................68
7.2.1 Controlling circuit breakers and disconnectors.......................................................................68
7.3 Resetting the IED.............................................................................................................................. 69
7.3.1 Clearing and acknowledging via the local HMI......................................................................... 69
7.4 Changing the IED functionality...................................................................................................... 70
7.4.1 Defining the setting group........................................................................................................... 70
7.4.1.1 Activating a setting group...................................................................................................... 70
7.4.1.2 Browsing and editing setting group values......................................................................... 71
7.4.2 Activating LEDs............................................................................................................................... 74
Section 8 Troubleshooting ................................................................................................77
8.1 Fault tracing....................................................................................................................................... 77
8.1.1 Identifying hardware errors.......................................................................................................... 77
8.1.2 Identifying runtime errors.............................................................................................................77
8.1.3 Identifying communication errors...............................................................................................77
8.1.3.1 Checking the communication link operation.......................................................................77
8.1.3.2 Checking the time synchronization....................................................................................... 78
8.1.4 Running the display test................................................................................................................78
8.2 Indication messages........................................................................................................................ 78
8.2.1 Internal faults...................................................................................................................................78
8.2.2 Warnings...........................................................................................................................................79
8.2.3 Additional indications................................................................................................................... 80
8.3 Correction procedures.................................................................................................................... 80
8.3.1 Changing and setting the password..........................................................................................80
8.3.2 Identifying IED application problems.........................................................................................80
8.3.2.1 Inspecting the wiring............................................................................................................... 80
Section 9 Glossary.............................................................................................................. 85
Table of contents
650 series 3
Operation manual
© Copyright 2013 ABB. All rights reserved
4
Section 1 Introduction
1.1
This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v14
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of the
IED. The manual also describes how to identify disturbances and how to view calculated and
measured power grid data to determine the cause of a fault.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v9
This manual addresses the operator, who operates the IED on a daily basis.
The operator must be trained in and have a basic knowledge of how to operate protection
equipment. The manual contains terms and expressions commonly used to describe this kind of
equipment.
1MRK 500 096-UUS B Section 1
Introduction
650 series 5
Operation manual
© Copyright 2013 ABB. All rights reserved
1.3 Product documentation
1.3.1 Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v12
IEC07000220-3-en.vsd
P
la
n
n
in
g
&
p
u
rc
h
a
s
e
E
n
g
in
e
e
rin
g
In
s
ta
llin
g
C
o
m
m
is
s
io
n
in
g
O
p
e
ra
tio
n
M
a
in
te
n
a
n
c
e
D
e
c
o
m
m
is
s
io
n
in
g
D
e
in
s
ta
llin
g
&
d
is
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Technical manual
Commissioning manual
IEC07000220 V3 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the various tools
available within the PCM600 software. The manual provides instructions on how to set up a
PCM600 project and insert IEDs to the project structure. The manual also recommends a sequence
for the engineering of protection and control functions, LHMI functions as well as communication
engineering for IEC 60870-5-103, IEC 61850 and DNP 3.0.
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the
chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the
IED, parameter setting and configuration as well as verifying settings by secondary injection. The
manual describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be commissioned. The
relevant procedures may be followed also during the service and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of the
Section 1 1MRK 500 096-UUS B
Introduction
6 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
IED. The manual also describes how to identify disturbances and how to view calculated and
measured power grid data to determine the cause of a fault.
The application manual contains application descriptions and setting guidelines sorted per
function. The manual can be used to find out when and for what purpose a typical protection
function can be used. The manual can also provides assistance for calculating settings.
The technical manual contains application and functionality descriptions and lists function blocks,
logic diagrams, input and output signals, setting parameters and technical data, sorted per
function. The manual can be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service.
The communication protocol manual describes the communication protocols supported by the
IED. The manual concentrates on the vendor-specific implementations.
The point list manual describes the outlook and properties of the data points specific to the IED.
The manual should be used in conjunction with the corresponding communication protocol
manual.
1.3.2 Document revision history
GUID-52A4699C-F83B-48F8-BF4E-D853043AB731 v5.1.1.1.1
1.3.3 Related documents
GUID-DEA16B32-29D9-40B2-BC9F-12F3AEA90245 v7
Documents related to REB650 Identity number
Application manual 1MRK 505 287-UUS
Technical manual 1MRK 505 288-UUS
Commissioning manual 1MRK 505 289-UUS
Product Guide, configured 1MRK 505 290-BUS
Type test certificate 1MRK 505 290-TUS
Application notes for Circuit Breaker Control 1MRG006806
Documents related to REL650 Identity number
Application manual 1MRK 506 334-UUS
Technical manual 1MRK 506 335-UUS
Commissioning manual 1MRK 506 336-UUS
Product Guide 1MRK 506 337-BUS
Type test certificate 1MRK 506 337-TUS
Application notes for Circuit Breaker Control 1MRG006806
Documents related to RET650 Identity number
Application manual 1MRK 504 134-UUS
Technical manual 1MRK 504 135-UUS
Commissioning manual 1MRK 504 136-UUS
Table continues on next page
1MRK 500 096-UUS B Section 1
Introduction
650 series 7
Operation manual
© Copyright 2013 ABB. All rights reserved
Document revision/date History
-/March 2013 First release
A/October 2016 Minor corrections made
B/November 2019
Maintenance release - Updated safety information and bug corrections
Documents related to RET650 Identity number
Product Guide, configured 1MRK 504 137-BUS
Type test certificate 1MRK 504 137-TUS
Application notes for Circuit Breaker Control 1MRG006806
Documents related to REC650 Identity number
Application manual 1MRK 511 286-UUS
Technical manual 1MRK 511 287-UUS
Commissioning manual 1MRK 511 288-UUS
Product Guide 1MRK 511 289-BUS
Type test certificate 1MRK 511 289-TUS
Documents related to REG650 Identity number
Application manual 1MRK 502 047-UUS
Technical manual 1MRK 502 048-UUS
Commissioning manual 1MRK 502 049-UUS
Product Guide 1MRK 502 050-BUS
Type test certificate 1MRK 502 050-TUS
Rotor Ground Fault Protection with Injection Unit RXTTE4 and REG670 1MRG001910
Application notes for Circuit Breaker Control 1MRG006806
Documents related to REQ650 Identity number
Application manual 1MRK 505 291-UUS
Technical manual 1MRK 505 292-UUS
Commissioning manual 1MRK 505 293-UUS
Product Guide 1MRK 505 294-BUS
Type test certificate 1MRK 505 294-TUS
Application notes for Circuit Breaker Control 1MRG006806
650 series manuals Identity number
Communication protocol manual, DNP 3.0 1MRK 511 280-UUS
Communication protocol manual, IEC 61850–8–1 1MRK 511 281-UUS
Communication protocol manual, IEC 60870-5-103 1MRK 511 282-UUS
Cyber Security deployment guidelines 1MRK 511 285-UUS
Point list manual, DNP 3.0 1MRK 511 283-UUS
Engineering manual 1MRK 511 284-UUS
Operation manual 1MRK 500 096-UUS
Installation manual 1MRK 514 016-UUS
Accessories, 650 series 1MRK 513 023-BUS
MICS 1MRG 010 656
PICS 1MRG 010 660
PIXIT 1MRG 010 658
Section 1 1MRK 500 096-UUS B
Introduction
8 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
1.4 Symbols and conventions
1.4.1 Symbols
GUID-2945B229-DAB0-4F15-8A0E-B9CF0C2C7B15 v9
The electrical warning icon indicates the presence of a hazard which could result in
electrical shock.
The warning icon indicates the presence of a hazard which could result in personal
injury.
The caution icon indicates important information or warning related to the
concept discussed in the text. It might indicate the presence of a hazard which
could result in corruption of software or damage to equipment or property.
The information icon alerts the reader of important facts and conditions.
The tip icon indicates advice on, for example, how to design your project or how to
use a certain function.
Although warning hazards are related to personal injury, it is necessary to understand that under
certain operational conditions, operation of damaged equipment may result in degraded process
performance leading to personal injury or death. It is important that the user fully complies with all
warning and cautionary notices.
1.4.2 Document conventions
GUID-96DFAB1A-98FE-4B26-8E90-F7CEB14B1AB6 v2
• Abbreviations and acronyms in this manual are spelled out in the glossary. The glossary also
contains definitions of important terms.
• Push button navigation in the LHMI menu structure is presented by using the push button
icons.
For example, to navigate between the options, use and .
•
HMI menu paths are presented in bold.
For example, select Main menu/Settings.
• LHMI messages are shown in Courier font.
For example, to save the changes in non-volatile memory, select Yes and press
.
•
Parameter names are shown in italics.
For example, the function can be enabled and disabled with the
Operation
setting.
• Each function block symbol shows the available input/output signal.
1MRK 500 096-UUS B Section 1
Introduction
650 series 9
Operation manual
© Copyright 2013 ABB. All rights reserved
• the character ^ in front of an input/output signal name indicates that the signal name
may be customized using the PCM600 software.
• the character * after an input/output signal name indicates that the signal must be
connected to another function block in the application configuration to achieve a valid
application configuration.
• Dimensions are provided both in inches and mm. If it is not specifically mentioned then the
dimension is in mm.
1.4.3 Functions included in 650 series IEDs
GUID-7FEF6D7A-C3C7-4598-BB0A-0F95624D7C65 v7
Table 1: Main protection functions
IEC 61850 or Function
name
ANSI Function description
Differential protection
T2WPDIF 87T Transformer differential protection, two winding
T3WPDIF 87T Transformer differential protection, three winding
GENPDIF 87G Generator differential protection
REFPDIF 87N Restricted ground fault protection, low impedance
HZPDIF 87 1Ph High impedance differential protection
Impedance protection
ZQMPDIS 21 Five-zone distance protection, Quadrilateral and Mho characteristic
FDPSPDIS 21 Phase selection with load enchroachment, quadrilateral characteristic
FMPSPDIS 21 Faulty phase identification with load enchroachment for mho
ZDARDIR 21 Additional distance protection directional function for ground faults
ZDNRDIR 21D Directional impedance quadrilateral and mho
PPLPHIZ Phase preference logic
ZMRPSB 68 Power swing detection
ZCVPSOF Automatic switch onto fault logic, voltage-and current-based
ZGCPDIS 21G Underimpedance protection for generators and transformers
LEXPDIS 40 Loss of excitation
OOSPPAM 78 Out-of-step protection
LEPDIS Load enchroachment
Table 2: Backup protection functions
IEC 61850 or Function
name
ANSI Function description
Current protection
PHPIOC 50 Instantaneous phase overcurrent protection, 3-phase output
SPTPIOC 50 Instantaneous phase overcurrent protection, phase segregated output
OC4PTOC 51/67 Four-step phase overcurrent protection, 3-phase output
OC4SPTOC 51/67 Four-step phase overcurrent protection, phase segregated output
Table continues on next page
Section 1 1MRK 500 096-UUS B
Introduction
10 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
IEC 61850 or Function
name
ANSI Function description
EFPIOC 50N Instantaneous residual overcurrent protection
EF4PTOC 51N/67N Four step residual overcurrent protection, zero/negative sequence direction
SDEPSDE 67N Sensitive directional residual overcurrent and power protection
UC2PTUC 37 Time-delayed two-step undercurrent protection
LCPTTR 26 Thermal overload protection, one time constant, Celsius
LFPTTR 26 Thermal overload protection, one time constant, Fahrenheit
TRPTTR 49 Thermal overload protection, two time constants
CCRBRF 50BF Breaker failure protection, 3-phase activation and output
CSPRBRF 50BF Breaker failure protection, phase segregated activation and output
STBPTOC 50STB Stub protection
CCRPLD 52PD Pole discordance protection
BRCPTOC 46 Broken conductor check
GUPPDUP 37 Directional Under-power protection
GOPPDOP 32 Directional Over-power protection
DNSPTOC 46 Negative sequence based overcurrent function
AEGGAPC 50AE Accidental energizing protection for synchronous generator
NS2PTOC 46I2 Negative-sequence time overcurrent protection for machines
VRPVOC 51V Voltage-restrained time overcurrent protection
Voltage protection
UV2PTUV 27 Two-step undervoltage protection
OV2PTOV 59 Two-step overvoltage protection
ROV2PTOV 59N Two-step residual overvoltage protection
OEXPVPH 24 Overexcitation protection
LOVPTUV 27 Loss-of-voltage check
STEFPHIZ 59THD 100% Stator ground fault protection, 3rd harmonic based
Frequency protection
SAPTUF 81 Underfrequency function
SAPTOF 81 Overfrequency function
SAPFRC 81 Rate-of-change frequency protection
Table 3: Control and monitoring functions
IEC 61850 or Function
name
ANSI Function description
Control
SESRSYN 25 Synchrocheck, energizing check and synchronizing
SMBRREC 79 Autorecloser for 3-phase operation
STBRREC 79 Autorecloser for 1/3-phase operation
TR8ATCC 90 Automatic voltage control for tap changer, parallel control
Table continues on next page
1MRK 500 096-UUS B Section 1
Introduction
650 series 11
Operation manual
© Copyright 2013 ABB. All rights reserved
IEC 61850 or Function
name
ANSI Function description
TCMYLTC 84 Tap changer control and supervision, 6 binary inputs
SLGGIO Logic-rotating switch for function selection and LHMI presentation
VSGGIO Selector mini switch extension
DPGGIO IEC 61850 generic communication I/O functions
SPC8GGIO Single Point Generic Control 8 signals
AUTOBITS AutomationBits, command function for DNP3.0
I103CMD Function commands for IEC 60870-5-103
I103IEDCMD IED commands for IEC 60870-5-103
I103USRCMD Function commands user defined for IEC 60870-5-103
I103GENCMD Function commands generic for IEC 60870-5-103
I103POSCMD IED commands with position and select for IEC 60870-5-103
Apparatus control and interlocking
SCILO 3 Logical node for interlocking
BB_ES 3 Interlocking for busbar grounding switch
A1A2_BS 3 Interlocking for bus-section breaker
A1A2_DC 3 Interlocking for bus-section disconnector
ABC_BC 3 Interlocking for bus-coupler bay
BH_CONN 3 Interlocking for 1 1/2 breaker diameter
BH_LINE_A 3 Interlocking for 1 1/2 breaker diameter
BH_LINE_B 3 Interlocking for 1 1/2 breaker diameter
DB_BUS_A 3 Interlocking for double CB bay
DB_BUS_B 3 Interlocking for double CB bay
DB_LINE 3 Interlocking for double CB bay
ABC_LINE 3 Interlocking for line bay
AB_TRAFO 3 Interlocking for transformer bay
SCSWI Switch controller
SXCBR Circuit breaker
SXSWI Circuit switch
POS_EVAL Evaluation of position indication
SELGGIO Select release
QCBAY Bay control
LOCREM Handling of LR-switch positions
LOCREMCTRL LHMI control of PSTO
Secondary system supervision
CCSRDIF Current circuit supervision
SDDRFUF Fuse failure supervision
TCSSCBR Breaker close/trip circuit monitoring
Scheme communication
Table continues on next page
Section 1 1MRK 500 096-UUS B
Introduction
12 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
IEC 61850 or Function
name
ANSI Function description
ZCPSCH 85 Scheme communication logic with delta based blocking scheme signal transmit
ZCRWPSCH 85 Current reversal and WEI logic for distance protection, 3-phase
ZCWSPSCH 85 Current reversal and WEI logic for distance protection, phase segregated
ZCLCPLAL Local acceleration logic
ECPSCH 85 Scheme communication logic for residual overcurrent protection
ECRWPSCH 85 Current reversal and weak end infeed logic for residual overcurrent protection
Logic
SMPPTRC 94 Tripping logic, common 3-phase output
SPTPTRC 94 Tripping logic, phase segregated output
TMAGGIO Trip matrix logic
OR Configurable logic blocks, OR
INVERTER Configurable logic blocks, inverter
PULSETIMER Configurable logic blocks, PULSETIMER
GATE Configurable logic blocks, controllable gate
XOR Configurable logic blocks, exclusive OR
LOOPDELAY Configurable logic blocks, loop delay
TimerSet Configurable logic blocks, timer
AND Configurable logic blocks, AND
SRMEMORY Configurable logic blocks, set-reset memory
RSMEMORY Configurable logic blocks, reset-set memory
ANDQT Configurable logic Q/T, ANDQT
ORQT Configurable logic Q/T, ORQT
INVERTERQT Configurable logic Q/T, INVERTERQT
XORQT Configurable logic Q/T, XORQT
SRMEMORYQT Configurable logic Q/T, set-reset with memory
RSMEMORYQT Configurable logic Q/T, reset-set with memory
TIMERSETQT Configurable logic Q/T, settable timer
PULSETIMERQT Configurable logic Q/T, pulse timer
INVALIDQT Configurable logic Q/T, INVALIDQT
INDCOMBSPQT Configurable logic Q/T, single-indication signal combining
INDEXTSPQT Configurable logic Q/T, single-indication signal extractor
FXDSIGN Fixed-signal function block
B16I Boolean 16 to Integer conversion
B16IFCVI Boolean 16 to Integer conversion with logic node representation
IB16A Integer to Boolean 16 conversion
IB16FCVB Integer to boolean 16 conversion with logic node representation
TEIGGIO Elapsed time integrator with limit transgression and overflow supervision
Monitoring
Table continues on next page
1MRK 500 096-UUS B Section 1
Introduction
650 series 13
Operation manual
© Copyright 2013 ABB. All rights reserved
IEC 61850 or Function
name
ANSI Function description
CVMMXN Measurements
CMMXU Phase current measurement
VMMXU Phase-phase voltage measurement
CMSQI Current sequence component measurement
VMSQI Voltage sequence measurement
VNMMXU Phase-neutral voltage measurement
CNTGGIO Event counter
L4UFCNT Event counter with limit supervision
DRPRDRE Disturbance report
AxRADR Analog input signals
BxRBDR Binary input signals
SPGGIO IEC 61850 generic communication I/O functions
SP16GGIO IEC 61850 generic communication I/O functions 16 inputs
MVGGIO IEC 61850 generic communication I/O functions
MVEXP Measured value expander block
LMBRFLO Fault locator
SPVNZBAT Station battery supervision
SSIMG 63 Insulation gas monitoring function
SSIML 71 Insulation liquid monitoring function
SSCBR Circuit breaker condition monitoring
I103MEAS Measurands for IEC 60870-5-103
I103MEASUSR Measurands user defined signals for IEC 60870-5-103
I103AR Function status auto-recloser for IEC 60870-5-103
I103EF Function status ground-fault for IEC 60870-5-103
I103FLTPROT Function status fault protection for IEC 60870-5-103
I103IED IED status for IEC 60870-5-103
I103SUPERV Supervision status for IEC 60870-5-103
I103USRDEF Status for user defiend signals for IEC 60870-5-103
Metering
PCGGIO Pulse counter logic
ETPMMTR Function for energy calculation and demand handling
Table 4: Station communication
IEC 61850 or Function name ANSI Function description
Station communication
GOOSEINTLKRCV Horizontal communication via GOOSE for interlocking
GOOSEBINRCV GOOSE binary receive
GOOSEVCTRCONF GOOSE VCTR configuration for send and receive
Table continues on next page
Section 1 1MRK 500 096-UUS B
Introduction
14 650 series
Operation manual
© Copyright 2013 ABB. All rights reserved
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98

ABB RELION 650 SERIES Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI