  • Hello! I am an AI chatbot trained to assist you with the ABB RELION RET670 Commissioning Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
RELION® 670 SERIES
—
Transformer protection RET670
Version 2.2 IEC
Commissioning manual
Document ID: 1MRK 504 165-UEN
Issued: October 2017
Revision: A
Product version: 2.2.1
© Copyright 2017 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third
party, nor used for any unauthorized purpose.
The software and hardware described in this document is furnished under a license
and may be used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the
OpenSSL T
oolkit. (http://www.openssl.org/) This product includes cryptographic
software written/developed by: Eric Young ([email protected]) and Tim Hudson
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or registered
trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept
or product description and are not to be deemed as a statement of guaranteed
properties. All persons responsible for applying the equipment addressed in this
manual must satisfy themselves that each intended application is suitable and
acceptable, including that any applicable safety or other operational requirements
are complied with. In particular, any risks in applications where a system failure
and/or product failure would create a risk for harm to property or persons
(including but not limited to personal injuries or death) shall be the sole
responsibility of the person or entity applying the equipment, and those so
responsible are hereby requested to ensure that all measures are taken to exclude or
mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requested
to notify the manufacturer
. Other than under explicit contractual commitments, in
no event shall ABB be responsible or liable for any loss or damage resulting from
the use of this manual or the application of the equipment.
Conformity
This product complies with the directive of the Council of the European
Communities on the approximation of the laws of the Member States relating to
electromagnetic compatibility (EMC Directive 2004/108/EC) and concerning
electrical equipment for use within specified voltage limits (Low-voltage directive
2006/95/EC). This conformity is the result of tests conducted by ABB in
accordance with the product standard EN 60255-26 for the EMC directive, and
with the product standards EN 60255-1 and EN 60255-27 for the low voltage
directive. The product is designed in accordance with the international standards of
the IEC 60255 series.
Table of contents
Section 1 Introduction
.....................................................................13
This manual...................................................................................... 13
Intended audience............................................................................ 13
Product documentation.....................................................................14
Product documentation set..........................................................14
Document revision history........................................................... 15
Related documents......................................................................16
Document symbols and conventions................................................16
Symbols.......................................................................................16
Document conventions................................................................ 17
IEC 61850 edition 1 / edition 2 mapping...........................................18
Section 2 Safety information.......................................................... 27
Symbols on the product....................................................................27
Warnings.......................................................................................... 27
Caution signs....................................................................................29
Note signs.........................................................................................29
Section 3 Available functions......................................................... 31
Main protection functions..................................................................31
Back-up protection functions............................................................ 33
Control and monitoring functions......................................................35
Communication.................................................................................42
Basic IED functions.......................................................................... 45
Section 4 Starting up......................................................................47
Factory and site acceptance testing................................................. 47
Commissioning checklist.................................................................. 47
Checking the power supply.............................................................. 48
Energizing the IED............................................................................48
Checking the IED operation.........................................................48
IED start-up sequence.................................................................49
Setting up communication between PCM600 and the IED...............49
Writing an application configuration to the IED.................................54
Checking CT circuits.........................................................................55
Checking VT circuits.........................................................................56
Using the RTXP test switch.............................................................. 56
Checking the binary input/output circuits..........................................57
Binary input circuits..................................................................... 57
Binary output circuits................................................................... 57
Table of contents
Transformer protection RET670 2.2 IEC 1
Commissioning manual
Checking optical connections........................................................... 58
Section 5 Configuring the IED and changing settings
....................59
Overview...........................................................................................59
Configuring analog CT inputs........................................................... 60
Supervision of input/output modules................................................ 60
Section 6 Establishing connection and verifying the SPA/IEC
communication............................................................... 63
Entering settings...............................................................................63
Entering SPA settings..................................................................63
Entering IEC settings...................................................................63
Verifying the communication............................................................ 64
Verifying SPA communication..................................................... 64
Verifying IEC communication...................................................... 64
Fibre optic loop................................................................................. 65
Optical budget calculation for serial communication with
SPA/IEC .......................................................................................... 65
Section 7 Establishing connection and verifying the LON
communication............................................................... 67
Communication via the rear ports ....................................................67
LON communication.................................................................... 67
The LON Protocol........................................................................68
Hardware and software modules.................................................68
Optical budget calculation for serial communication with LON ........70
Section 8 Establishing connection and verifying the IEC 61850
communication............................................................... 71
Overview...........................................................................................71
Setting the station communication....................................................71
Verifying the communication............................................................ 72
Section 9 Establishing connection and verifying the IEEE
C37.118/1344 communication........................................73
Overview...........................................................................................73
Setting the PMU station communication (PMU Report)................... 73
Setting the PMU station communication (PMU configuration)..........74
Setting the TCP/UDP client communication..................................... 75
Verifying the communication............................................................ 78
Verifying the IEEE C37.118/1344 TCP communication.............. 79
Verifying the IEEE C37.118/1344 UDP communication.............. 85
Optical budget calculation for PMU - PDC communication.............. 86
Section 10 Testing IED operation.....................................................87
Preparing for test.............................................................................. 87
Table of contents
2 Transformer protection RET670 2.2 IEC
Commissioning manual
Requirements.............................................................................. 87
Preparing the IED to verify settings.............................................
89
Activating the test mode................................................................... 90
Preparing the connection to the test equipment............................... 90
Connecting the test equipment to the IED........................................91
Releasing the function to be tested.................................................. 92
Verifying analog primary and secondary measurement................... 93
Testing the protection functionality................................................... 94
Forcing of binary input/output signals for testing.............................. 95
Forcing concept........................................................................... 95
How to enable forcing..................................................................95
Enable forcing by using LHMI................................................ 95
Enable forcing using TESTMODE function block...................96
How to change binary input/output signals using forcing............ 96
Forcing by using LHMI........................................................... 96
Forcing by using PCM600...................................................... 98
How to undo forcing changes and return the IED to normal
operation......................................................................................99
Undo forcing by using TESTMODE component...................100
Undo forcing by using LHMI................................................. 100
Undo forcing by using PCM600............................................100
Section 11 Testing functionality by secondary injection.................103
Testing disturbance report..............................................................103
Introduction................................................................................103
Disturbance report settings........................................................103
Disturbance recorder (DR)........................................................ 103
Event recorder (ER) and Event list (EL).................................... 104
Identifying the function to test in the technical reference manual ..105
Differential protection......................................................................105
Transformer differential protection T2WPDIF andT3WPDIF..... 105
Verifying the settings............................................................ 105
Completing the test.............................................................. 106
High impedance differential protection HZPDIF ....................... 106
Verifying the settings............................................................ 106
Completing the test.............................................................. 107
Restricted earth fault protection, low impedance REFPDIF ..... 107
Verifying the settings............................................................ 107
Completing the test.............................................................. 108
Additional security logic for differential protection LDRGFC .....108
Verifying the settings............................................................ 108
Completing the test.............................................................. 110
Impedance protection..................................................................... 110
Table of contents
Transformer protection RET670 2.2 IEC 3
Commissioning manual
Distance protection zones, quadrilateral characteristic
ZMQPDIS.................................................................................. 110
Measuring the operating limit of set values
.......................... 114
Measuring the operating time of distance protection zones. 114
Completing the test.............................................................. 115
Phase selection, quad, fixed angle, load encroachment
FDPSPDIS ................................................................................115
Measuring the operating limit of set values.......................... 118
Completing the test.............................................................. 118
Full scheme distance protection, mho characteristic ZMHPDIS118
Phase-to-phase faults.......................................................... 119
Phase-to-earth faults............................................................ 119
Faulty phase identification with load encroachment
FMPSPDIS ............................................................................... 120
Distance protection zones, quadrilateral characteristic,
separate settings ZMRPDIS...................................................... 120
Measuring the operating limit of set values.......................... 124
Measuring the operating time of distance protection zones. 125
Phase selection, quadrilateral characteristic with settable
angle FRPSPDIS.......................................................................125
Measuring the operating limit of set values.......................... 127
Completing the test.............................................................. 128
High speed distance protection zones, quadrilateral and
mho characteristic ZMFPDIS.....................................................128
Measuring the operating limit of set values.......................... 132
Measuring the operating time of distance protection zones. 132
Completing the test.............................................................. 133
High Speed distance for series compensated line zones,
quadrilateral and mho characteristic ZMFCPDIS ..................... 133
Measuring the operating limit of set values.......................... 136
Measuring the operating time of distance protection zones. 137
Completing the test.............................................................. 137
Power swing detection ZMRPSB ..............................................137
Verifying the settings............................................................ 139
Testing the power swing detection function ZMRPSB ........ 140
Testing the
tR1
timer............................................................ 140
Testing the block input, interaction between FDPSPDIS
or FRPSPDIS and ZMRPSB ............................................... 141
Completing the test.............................................................. 141
Power swing logic PSLPSCH.................................................... 141
Testing the carrier send and trip signals.............................. 142
Testing the influence of the residual overcurrent protection.142
Checking the underreaching zone........................................143
Completing the test.............................................................. 143
Table of contents
4 Transformer protection RET670 2.2 IEC
Commissioning manual
Pole slip protection PSPPPAM..................................................144
Verifying the settings............................................................ 144
Completing the test.............................................................. 146
Out-of-step protection OOSPPAM.............................................146
Verifying the settings............................................................
147
Test of point RE (R
FwdR
, X
FwdX
)........................................... 151
Test of the boundary between zone 1 and zone 2, which
is defined by the parameter
ReachZ1
.................................. 155
Test of the point SE (R
RvsR
, X
RvsX
)...................................... 160
Automatic switch onto fault logic ZCVPSOF............................. 164
Activating ZCVPSOF externally........................................... 165
Initiating ZCVPSOF automatically and setting mode to
impedance............................................................................165
Initiating ZCVPSOF automatically and setting mode to
UILevel ................................................................................ 165
Completing the test.............................................................. 165
Phase preference logic PPLPHIZ .............................................166
Completing the test.............................................................. 167
Phase preference logic PPL2PHIZ............................................167
Completing the test....................................................................168
Under impedance protection for Generator ZGVPDIS.............. 168
Verifying the settings............................................................ 168
Completing the test.............................................................. 171
Current protection...........................................................................172
Instantaneous phase overcurrent protection 3-phase output
PHPIOC ....................................................................................172
Measuring the operate limit of set values.............................172
Completing the test.............................................................. 172
Directional phase overcurrent protection, four steps
OC4PTOC................................................................................. 173
Verifying the settings............................................................ 173
Completing the test.............................................................. 174
Instantaneous residual overcurrent protection EFPIOC ........... 174
Measuring the operate limit of set values.............................175
Completing the test.............................................................. 175
Four step residual overcurrent protection, (Zero sequence
or negative sequence directionality) EF4PTOC ....................... 175
Four step directional earth fault protection........................... 175
Four step non-directional earth fault protection....................176
Completing the test.............................................................. 176
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................176
Completing the test.............................................................. 177
Table of contents
Transformer protection RET670 2.2 IEC 5
Commissioning manual
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................178
Measuring the
operate and time limit for set values.............178
Completing the test.............................................................. 184
Thermal overload protection, two time constants TRPTTR ......184
Checking operate and reset values......................................184
Completing the test.............................................................. 185
Breaker failure protection, phase segregated activation and
output CCRBRF.........................................................................185
Checking the phase current operate value,
IP>
................... 185
Checking the residual (earth fault) current operate value
IN>
set below
IP>
................................................................. 186
Checking the re-trip and back-up times................................186
Verifying the re-trip mode..................................................... 186
Verifying the back-up trip mode............................................187
Verifying instantaneous back-up trip at CB faulty condition. 188
Verifying the function mode
Current/Contact
....................... 188
Completing the test.............................................................. 189
Stub protection STBPTOC........................................................ 189
Measuring the operate limit of set values.............................189
Completing the test.............................................................. 190
Pole discordance protection CCPDSC...................................... 190
Verifying the settings............................................................ 190
Completing the test.............................................................. 191
Directional underpower protection GUPPDUP ......................... 191
Verifying the settings............................................................ 191
Completing the test.............................................................. 193
Directional overpower protection GOPPDOP ...........................193
Verifying the settings............................................................ 193
Completing the test.............................................................. 194
Broken conductor check BRCPTOC ........................................ 194
Measuring the operate and time limit of set values.............. 194
Completing the test.............................................................. 194
Capacitor bank protection CBPGAPC....................................... 195
Verifying the settings and operation of the function............. 195
Completing the test.............................................................. 199
Negative-sequence time overcurrent protection for
machines NS2PTOC ................................................................ 199
Verifying settings by secondary injection............................. 199
Completing the test.............................................................. 201
Voltage-restrained time overcurrent protection VRPVOC......... 201
Verifying the settings............................................................ 201
Completing the test.............................................................. 205
Voltage protection...........................................................................205
Table of contents
6 Transformer protection RET670 2.2 IEC
Commissioning manual
Two step undervoltage protection UV2PTUV ...........................205
Verifying the settings............................................................ 205
Completing the test..............................................................
206
Two step overvoltage protection OV2PTOV .............................206
Verifying the settings............................................................ 206
Extended testing...................................................................207
Completing the test.............................................................. 207
Two step residual overvoltage protection ROV2PTOV ............ 207
Verifying the settings............................................................ 208
Completing the test.............................................................. 208
Overexcitation protection OEXPVPH ....................................... 208
Verifying the settings............................................................ 208
Completing the test.............................................................. 209
Voltage differential protection VDCPTOV .................................209
Check of undervoltage levels............................................... 209
Check of voltage differential trip and alarm levels................211
Check of trip and trip reset timers........................................ 212
Final adjustment of compensation for VT ratio differences . 213
Completing the test.............................................................. 213
Loss of voltage check LOVPTUV ............................................. 213
Measuring the operate limit of set values.............................213
Completing the test.............................................................. 214
Frequency protection......................................................................214
Underfrequency protection SAPTUF ........................................ 214
Verifying the settings............................................................ 214
Completing the test.............................................................. 216
Overfrequency protection SAPTOF ..........................................216
Verifying the settings............................................................ 216
Completing the test.............................................................. 217
Rate-of-change frequency protection SAPFRC ........................217
Verifying the settings............................................................ 217
Completing the test.............................................................. 218
Multipurpose protection.................................................................. 218
General current and voltage protection CVGAPC..................... 218
Built-in overcurrent feature (non-directional)........................ 218
Overcurrent feature with current restraint.............................219
Overcurrent feature with voltage restraint............................ 219
Overcurrent feature with directionality..................................220
Over/Undervoltage feature................................................... 220
Completing the test.............................................................. 221
Secondary system supervision.......................................................221
Current circuit supervision CCSSPVC.......................................221
Verifying the settings............................................................ 221
Table of contents
Transformer protection RET670 2.2 IEC 7
Commissioning manual
Completing the test.............................................................. 221
Fuse failure supervision FUFSPVC...........................................
221
Checking that the binary inputs and outputs operate as
expected ..............................................................................222
Measuring the operate value for the negative sequence
function ................................................................................222
Measuring the operate value for the zero-sequence
function ................................................................................224
Measuring the operate value for the dead line detection
function.................................................................................224
Checking the operation of the du/dt and di/dt based
function ................................................................................225
Completing the test.............................................................. 226
Fuse failure supervision VDSPVC.............................................226
Completing the test.............................................................. 227
Control............................................................................................ 227
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 227
Testing the synchronizing function....................................... 229
Testing the synchrocheck functionality.................................229
Testing the energizing check................................................232
Testing the voltage selection................................................233
Completing the test.............................................................. 235
Apparatus control APC.............................................................. 236
Voltage control TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC. 236
Secondary test..................................................................... 238
Check the activation of the voltage control operation...........238
Check the normal voltage regulation function...................... 239
Check the undervoltage block function................................ 240
Check the upper and lower busbar voltage limit.................. 240
Check the overcurrent block function................................... 241
Single transformer................................................................ 241
Parallel voltage regulation.................................................... 242
Completing the test.............................................................. 247
Single command, 16 signals SINGLECMD............................... 247
Interlocking................................................................................ 247
Scheme communication................................................................. 247
Scheme communication logic for distance or overcurrent
protection ZCPSCH .................................................................. 247
Testing permissive underreaching....................................... 248
Testing permissive overreaching..........................................248
Testing blocking scheme......................................................248
Testing delta blocking scheme............................................. 249
Checking of unblocking logic................................................249
Table of contents
8 Transformer protection RET670 2.2 IEC
Commissioning manual
Completing the test.............................................................. 250
Phase segregated scheme communication logic for
distance or overcurrent protection ZC1PPSCH ........................
250
Testing permissive underreaching....................................... 250
Testing permissive overreaching..........................................251
Testing blocking scheme......................................................251
Completing the test.............................................................. 251
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH .............................................. 252
Current reversal logic........................................................... 252
Weak end infeed logic.......................................................... 253
Completing the test.............................................................. 253
Scheme communication logic for residual overcurrent
protection ECPSCH ..................................................................254
Testing the directional comparison logic function.................254
Completing the test.............................................................. 255
Current reversal and weak-end infeed logic for residual
overcurrent protection ECRWPSCH .........................................255
Testing the current reversal logic......................................... 256
Testing the weak-end infeed logic........................................256
Completing the test.............................................................. 258
Logic............................................................................................... 258
Tripping logic, common 3-phase output SMPPTRC .................258
3 phase operating mode.......................................................258
1ph/3ph operating mode...................................................... 259
1ph/2ph/3ph operating mode............................................... 260
Circuit breaker lockout..........................................................261
Completing the test.............................................................. 261
Monitoring.......................................................................................262
Gas medium supervision SSIMG.............................................. 262
Testing the gas medium supervision for pressure alarm
and pressure lockout conditions...........................................262
Testing the gas medium supervision for temperature
alarm and temperature lock out conditions.......................... 263
Completing the test.............................................................. 263
Liquid medium supervision SSIML............................................ 263
Testing the liquid medium supervision for level alarm
and level lockout conditions................................................. 263
Testing the liquid medium supervision for temperature
alarm and temperature lock out conditions.......................... 264
Completing the test.............................................................. 264
Breaker monitoring SSCBR.......................................................264
Verifying the settings............................................................ 265
Completing the test.............................................................. 266
Table of contents
Transformer protection RET670 2.2 IEC 9
Commissioning manual
Event function EVENT...............................................................267
Fault locator LMBRFLO.............................................................
267
Measuring the operate limit.................................................. 268
Completing the test.............................................................. 268
Limit counter L4UFCNT.............................................................268
Completing the test.............................................................. 269
Estimation of transformer insulation life LOLSPTR .................. 269
Verifying the signals and settings.........................................269
Completing the test.............................................................. 271
Metering..........................................................................................271
Pulse-counter logic PCFCNT.................................................... 271
Function for energy calculation and demand handling
ETPMMTR.................................................................................271
Verifying the settings............................................................ 271
Completing the test.............................................................. 272
Station communication................................................................... 273
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................ 273
Remote communication..................................................................273
Binary signal transfer.................................................................273
Basic IED functions........................................................................ 274
Parameter setting group handling SETGRPS........................... 274
Verifying the settings............................................................ 274
Completing the test.............................................................. 275
Exit test mode.................................................................................275
Section 12 Primary injection testing............................................... 277
Transformer Voltage Control ATCC............................................... 277
Load drop compensation function, LDC.................................... 277
Voltage control of Parallel Transformers................................... 279
Minimum Circulating Current (MCC) method............................ 279
Master Follower (MF) method................................................... 281
Completing the test....................................................................282
Section 13 Checking the directionality........................................... 283
Overview.........................................................................................283
Testing the directionality of the distance protection........................283
Section 14 Commissioning and maintenance of the fault
clearing system............................................................ 287
Commissioning tests...................................................................... 287
Periodic maintenance tests............................................................ 287
Visual inspection........................................................................288
Maintenance tests..................................................................... 288
Preparation...........................................................................288
Table of contents
10 Transformer protection RET670 2.2 IEC
Commissioning manual
Recording............................................................................. 289
Secondary injection..............................................................
289
Alarm test............................................................................. 289
Self supervision check..........................................................289
Trip circuit check.................................................................. 289
Measurement of service currents......................................... 290
Restoring.............................................................................. 291
Section 15 Troubleshooting............................................................293
Checking the self supervision signals.............................................293
Checking the self supervision function...................................... 293
Determine the cause of an internal failure............................293
Self supervision HMI data..........................................................293
General IED status............................................................... 293
Fault tracing....................................................................................294
Internal fault indications.............................................................294
Using front-connected PC......................................................... 295
Diagnosing the IED status via the LHMI hint menu................... 297
Repair instruction............................................................................299
Repair support................................................................................ 300
Maintenance................................................................................... 300
Section 16 Glossary....................................................................... 301
Table of contents
Transformer protection RET670 2.2 IEC 11
Commissioning manual
12
Section 1 Introduction
1.1 This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v18
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and ener
gizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance
and taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well
experienced in using protection equipment, test equipment, protection functions
and the configured functional logics in the IED.
1MRK 504 165-UEN A Section 1
Introduction
Transformer protection RET670 2.2 IEC 13
Commissioning manual
1.3 Product documentation
1.3.1 Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v15
IEC07000220-4-en.vsd
P
la
n
n
in
g
&
p
u
rc
h
a
s
e
E
n
g
in
e
e
rin
g
In
s
ta
llin
g
C
o
m
m
is
s
io
n
in
g
O
p
e
ra
tio
n
M
a
in
te
n
a
n
c
e
D
e
c
o
m
m
is
s
io
n
in
g
D
e
in
s
ta
llin
g
&
d
is
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using
the various tools available within the PCM600 software. The manual provides
instructions on how to set up a PCM600 project and insert IEDs to the project
structure. The manual also recommends a sequence for the engineering of
protection and control functions, LHMI functions as well as communication
engineering for IEC 60870-5-103, IEC 61850, DNP3, LON and SPA.
The installation manual contains instructions on how to install the IED. The
manual provides procedures for mechanical and electrical installation. The chapters
are organized in the chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and energizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
Section 1 1MRK 504 165-UEN A
Introduction
14 Transformer protection RET670 2.2 IEC
Commissioning manual
/