Relion 670 series

ABB Relion 670 series, RELION RET670 Commissioning Manual

  • Hello! I am an AI chatbot trained to assist you with the ABB Relion 670 series Commissioning Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
RELION® 670 SERIES
—
Transformer protection RET670
Version 2.2 ANSI
Commissioning manual
Document ID: 1MRK 504 165-UUS
Issued: May 2017
Revision: -
Product version: 2.2
© Copyright 2017 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third party, nor
used for any unauthorized purpose.
The software and hardware described in this document is furnished under a license and
may be used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the OpenSSL
Toolkit. (http://www.openssl.org/) This product includes cryptographic software written/
developed by: Eric Young ([email protected]) and Tim Hudson ([email protected]).
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or product
names mentioned in this document may be trademarks or registered trademarks of their
respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or
product description and are not to be deemed as a statement of guaranteed properties. All
persons responsible for applying the equipment addressed in this manual must satisfy
themselves that each intended application is suitable and acceptable, including that any
applicable safety or other operational requirements are complied with. In particular, any
risks in applications where a system failure and/or product failure would create a risk for
harm to property or persons (including but not limited to personal injuries or death) shall
be the sole responsibility of the person or entity applying the equipment, and those so
responsible are hereby requested to ensure that all measures are taken to exclude or
mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be completely
ruled out. In case any errors are detected, the reader is kindly requested to notify the
manufacturer. Other than under explicit contractual commitments, in no event shall ABB
be responsible or liable for any loss or damage resulting from the use of this manual or the
application of the equipment.
Conformity
This product complies with the directive of the Council of the European Communities on
the approximation of the laws of the Member States relating to electromagnetic
compatibility (EMC Directive 2004/108/EC) and concerning electrical equipment for use
within specified voltage limits (Low-voltage directive 2006/95/EC). This conformity is
the result of tests conducted by ABB in accordance with the product standard EN
60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN
60255-27 for the low voltage directive. The product is designed in accordance with the
international standards of the IEC 60255 series and ANSI C37.90.
Table of contents
Section 1 Introduction..........................................................................13
This manual............................................................................................ 13
Intended audience.................................................................................. 13
Product documentation...........................................................................14
Product documentation set................................................................14
Document revision history................................................................. 15
Related documents............................................................................16
Document symbols and conventions...................................................... 16
Symbols.............................................................................................16
Document conventions...................................................................... 17
IEC 61850 edition 1 / edition 2 mapping.................................................18
Section 2 Safety information............................................................... 29
Symbols on the product.......................................................................... 29
Warnings.................................................................................................29
Caution signs.......................................................................................... 31
Note signs...............................................................................................32
Section 3 Available functions.............................................................. 33
Main protection functions........................................................................33
Back-up protection functions.................................................................. 34
Control and monitoring functions............................................................ 36
Communication.......................................................................................41
Basic IED functions.................................................................................43
Section 4 Starting up........................................................................... 45
Factory and site acceptance testing....................................................... 45
Commissioning checklist........................................................................ 45
Checking the power supply.....................................................................46
Energizing the IED..................................................................................46
Checking the IED operation...............................................................46
IED start-up sequence.......................................................................47
Setting up communication between PCM600 and the IED.....................47
Writing an application configuration to the IED.......................................52
Checking CT circuits...............................................................................53
Checking VT circuits............................................................................... 54
Using the RTXP test switch.................................................................... 54
Table of contents
Transformer protection RET670 2.2 ANSI 1
Commissioning manual
Checking the binary input/output circuits................................................ 55
Binary input circuits............................................................................55
Binary output circuits......................................................................... 56
Checking optical connections................................................................. 56
Section 5 Configuring the IED and changing settings......................... 57
Overview.................................................................................................57
Configuring analog CT inputs................................................................. 58
Supervision of input/output modules.......................................................58
Section 6 Establishing connection and verifying the SPA/IEC
communication.................................................................... 61
Entering settings..................................................................................... 61
Entering SPA settings........................................................................61
Entering IEC settings.........................................................................61
Verifying the communication...................................................................62
Verifying SPA communication........................................................... 62
Verifying IEC communication............................................................ 62
Fibre optic loop....................................................................................... 63
Optical budget calculation for serial communication with SPA/IEC ....... 63
Section 7 Establishing connection and verifying the LON
communication.................................................................... 65
Communication via the rear ports ..........................................................65
LON communication.......................................................................... 65
The LON Protocol..............................................................................66
Hardware and software modules.......................................................66
Optical budget calculation for serial communication with LON ..............68
Section 8 Establishing connection and verifying the IEC 61850
communication.................................................................... 71
Overview.................................................................................................71
Setting the station communication..........................................................71
Verifying the communication...................................................................72
Section 9 Establishing connection and verifying the IEEE
C37.118/1344 communication.............................................73
Overview.................................................................................................73
Setting the PMU station communication (PMU Report)..........................73
Setting the PMU station communication (PMU configuration)................74
Setting the TCP/UDP client communication........................................... 75
Verifying the communication...................................................................78
Table of contents
2 Transformer protection RET670 2.2 ANSI
Commissioning manual
Verifying the IEEE C37.118/1344 TCP communication.................... 79
Verifying the IEEE C37.118/1344 UDP communication.................... 85
Optical budget calculation for PMU - PDC communication.................... 86
Section 10 Testing IED operation..........................................................89
Preparing for test.................................................................................... 89
Requirements.................................................................................... 89
Preparing the IED to verify settings................................................... 90
Activating the test mode......................................................................... 91
Preparing the connection to the test equipment..................................... 92
Connecting the test equipment to the IED.............................................. 93
Releasing the function to be tested........................................................ 94
Verifying analog primary and secondary measurement......................... 94
Testing the protection functionality......................................................... 96
Forcing of binary input/output signals for testing.................................... 97
Forcing concept................................................................................. 97
How to enable forcing........................................................................97
Enable forcing by using LHMI.......................................................97
Enable forcing using TESTMODE function block......................... 98
How to change binary input/output signals using forcing.................. 98
Forcing by using LHMI..................................................................98
Forcing by using PCM600.......................................................... 100
How to undo forcing changes and return the IED to normal
operation..........................................................................................102
Undo forcing by using TESTMODE component......................... 102
Undo forcing by using LHMI....................................................... 102
Undo forcing by using PCM600..................................................103
Section 11 Testing functionality by secondary injection...................... 105
Testing disturbance report.................................................................... 105
Introduction......................................................................................105
Disturbance report settings..............................................................105
Disturbance recorder (DR)...............................................................105
Event recorder (ER) and Event list (EL).......................................... 106
Identifying the function to test in the technical reference manual ........ 107
Differential protection............................................................................107
Transformer differential protection T2WPDIF andT3WPDIF(87T).. 107
Verifying the settings.................................................................. 107
Completing the test.....................................................................108
High impedance differential protection HZPDIF (87).......................108
Verifying the settings.................................................................. 109
Table of contents
Transformer protection RET670 2.2 ANSI 3
Commissioning manual
Completing the test.....................................................................109
Restricted earth fault protection, low impedance REFPDIF (87N).. 110
Verifying the settings.................................................................. 110
Completing the test.....................................................................110
Additional security logic for differential protection LDRGFC (11).... 110
Verifying the settings.................................................................. 110
Completing the test.....................................................................112
Impedance protection........................................................................... 112
Distance protection zones, quadrilateral characteristic
ZMQPDIS (21).................................................................................112
Measuring the operating limit of set values................................ 116
Measuring the operating time of distance protection zones....... 117
Completing the test.....................................................................117
Phase selection, quad, fixed angle, load encroachment
FDPSPDIS (21)............................................................................... 118
Measuring the operating limit of set values................................ 120
Completing the test.....................................................................121
Full scheme distance protection, mho characteristic ZMHPDIS (21)121
Phase-to-phase faults.................................................................122
Phase-to-ground faults............................................................... 122
Faulty phase identification with load encroachment FMPSPDIS
(21).................................................................................................. 123
Distance protection zones, quadrilateral characteristic, separate
settings ZMRPDIS (21)....................................................................124
Measuring the operating limit of set values................................ 127
Measuring the operating time of distance protection zones....... 128
Phase selection, quadrilateral characteristic with settable angle
FRPSPDIS (21)............................................................................... 128
Measuring the operating limit of set values................................ 131
Completing the test.....................................................................132
High speed distance protection zones, quadrilateral and mho
characteristic ZMFPDIS (21)........................................................... 132
Measuring the operating limit of set values................................ 135
Measuring the operating time of distance protection zones....... 136
Completing the test.....................................................................136
High Speed distance for series compensated line zones,
quadrilateral and mho characteristic ZMFCPDIS (21).....................137
Measuring the operating limit of set values................................ 140
Measuring the operating time of distance protection zones....... 141
Completing the test.....................................................................141
Power swing detection ZMRPSB (68)............................................. 142
Table of contents
4 Transformer protection RET670 2.2 ANSI
Commissioning manual
Verifying the settings.................................................................. 143
Testing the power swing detection function ZMRPSB (68)........ 144
Testing the
tR1
timer.................................................................. 144
Testing the block input, interaction between FDPSPDIS (21)
or FRPSPDIS (21) and ZMRPSB (78)........................................145
Completing the test.....................................................................145
Power swing logic PSLPSCH.......................................................... 145
Testing the carrier send and trip signals.....................................146
Testing the influence of the residual overcurrent protection.......146
Checking the underreaching zone..............................................147
Completing the test.....................................................................148
Pole slip protection PSPPPAM (78)................................................ 148
Verifying the settings.................................................................. 148
Completing the test.....................................................................150
Out-of-step protection OOSPPAM...................................................150
Verifying the settings.................................................................. 151
Test of point RE (R
FwdR
, X
FwdX
)................................................. 156
Test of the boundary between zone 1 and zone 2, which is
defined by the parameter
ReachZ1
............................................ 161
Test of the point SE (R
RvsR
, X
RvsX
).............................................165
Automatic switch onto fault logic ZCVPSOF................................... 170
Activating ZCVPSOF externally..................................................170
Initiating ZCVPSOF automatically and setting mode to
impedance.................................................................................. 171
Initiating ZCVPSOF automatically and setting mode to VILevel 171
Completing the test.....................................................................171
Phase preference logic PPLPHIZ ...................................................172
Completing the test.....................................................................173
Under impedance protection for Generator ZGVPDIS.................... 173
Verifying the settings.................................................................. 173
Completing the test.....................................................................176
Current protection................................................................................. 177
Instantaneous phase overcurrent protection 3-phase output
PHPIOC (50)....................................................................................177
Measuring the trip limit of set values.......................................... 177
Completing the test.....................................................................178
Directional phase overcurrent protection, four steps OC4PTOC
(51_67).............................................................................................178
Verifying the settings.................................................................. 178
Completing the test.....................................................................180
Table of contents
Transformer protection RET670 2.2 ANSI 5
Commissioning manual
Instantaneous residual overcurrent protection EFPIOC (50N)........ 180
Measuring the trip limit of set values.......................................... 180
Completing the test.....................................................................181
Four step residual overcurrent protection, (Zero sequence or
negative sequence directionality) EF4PTOC (51N/67N)................. 181
Four step directional ground fault protection.............................. 181
Four step non-directional ground fault protection....................... 182
Completing the test.....................................................................182
Four step negative sequence overcurrent protection NS4PTOC
(46I2)............................................................................................... 182
Completing the test.....................................................................183
Sensitive directional residual overcurrent and power protection
SDEPSDE (67N)..............................................................................183
Measuring the trip and time limit for set values.......................... 184
Completing the test.....................................................................190
Thermal overload protection, two time constants TRPTTR (49)..... 190
Checking trip and reset values................................................... 190
Completing the test.....................................................................191
Breaker failure protection, phase segregated activation and
output CCRBRF (50BF)...................................................................191
Checking the phase current trip value,
Pickup_PH
.................... 191
Checking the residual (ground fault) current trip value
Pickup_N
set below
Pickup_PH
..................................................192
Checking the re-trip and back-up times......................................192
Verifying the re-trip mode........................................................... 192
Verifying the back-up trip mode..................................................193
Verifying instantaneous back-up trip at CB faulty condition....... 194
Verifying the case
RetripMode
=
Contact
...................................195
Verifying the function mode
Current/Contact
..............................195
Completing the test.....................................................................196
Pole discrepancy protection CCPDSC (52PD)................................196
Verifying the settings.................................................................. 196
Completing the test.....................................................................197
Directional underpower protection GUPPDUP (37).........................197
Verifying the settings.................................................................. 197
Completing the test.....................................................................199
Directional overpower protection GOPPDOP (32).......................... 199
Verifying the settings.................................................................. 199
Completing the test.....................................................................200
Broken conductor check BRCPTOC (46)........................................ 200
Measuring the trip and time limit of set values........................... 200
Table of contents
6 Transformer protection RET670 2.2 ANSI
Commissioning manual
Completing the test.....................................................................201
Capacitor bank protection CBPGAPC............................................. 201
Verifying the settings and operation of the function....................202
Completing the test.....................................................................206
Negative-sequence time overcurrent protection for machines
NS2PTOC (46I2)............................................................................. 206
Verifying settings by secondary injection....................................206
Completing the test.....................................................................208
Voltage-restrained time overcurrent protection VRPVOC(51V)...... 208
Verifying the settings.................................................................. 208
Completing the test.....................................................................212
Voltage protection.................................................................................212
Two step undervoltage protection UV2PTUV (27).......................... 212
Verifying the settings.................................................................. 212
Completing the test.....................................................................213
Two step overvoltage protection OV2PTOV (59)............................ 213
Verifying the settings.................................................................. 213
Extended testing.........................................................................214
Completing the test.....................................................................214
Two step residual overvoltage protection ROV2PTOV (59N)......... 215
Verifying the settings.................................................................. 215
Completing the test.....................................................................216
Overexcitation protection OEXPVPH (24)....................................... 216
Verifying the settings.................................................................. 216
Completing the test.....................................................................217
Voltage differential protection VDCPTOV (60)................................ 217
Check of undervoltage levels..................................................... 217
Check of voltage differential trip and alarm levels...................... 219
Check of trip and trip reset timers...............................................221
Final adjustment of compensation for VT ratio differences ....... 221
Completing the test.....................................................................221
Loss of voltage check LOVPTUV (27).............................................222
Measuring the trip limit of set values.......................................... 222
Completing the test.....................................................................222
Frequency protection............................................................................ 223
Underfrequency protection SAPTUF (81)........................................223
Verifying the settings.................................................................. 223
Completing the test.....................................................................224
Overfrequency protection SAPTOF (81)......................................... 224
Verifying the settings.................................................................. 224
Table of contents
Transformer protection RET670 2.2 ANSI 7
Commissioning manual
Completing the test.....................................................................225
Rate-of-change frequency protection SAPFRC (81)....................... 225
Verifying the settings.................................................................. 225
Completing the test.....................................................................226
Multipurpose protection........................................................................ 226
General current and voltage protection CVGAPC........................... 226
Built-in overcurrent feature (non-directional).............................. 227
Overcurrent feature with current restraint...................................227
Overcurrent feature with voltage restraint.................................. 228
Overcurrent feature with directionality........................................ 228
Over/Undervoltage feature......................................................... 229
Completing the test.....................................................................229
Secondary system supervision............................................................. 229
Current circuit supervision CCSSPVC (87)..................................... 229
Verifying the settings.................................................................. 230
Completing the test.....................................................................230
Fuse failure supervision FUFSPVC.................................................230
Checking that the binary inputs and outputs trip as expected ... 230
Measuring the trip value for the negative sequence function .... 231
Measuring the trip value for the zero-sequence function ...........232
Measuring the
trip
value for the dead line detection function..... 233
Checking the operation of the dv/dt and di/dt based function ....234
Completing the test.....................................................................235
Fuse failure supervision ..................................................................235
Completing the test.....................................................................236
Control.................................................................................................. 236
Synchrocheck, energizing check, and synchronizing SESRSYN
(25).................................................................................................. 236
Testing the synchronizing function............................................. 238
Testing the synchrocheck functionality.......................................239
Testing the energizing check......................................................242
Testing the voltage selection...................................................... 243
Completing the test.....................................................................246
Apparatus control APC.................................................................... 246
Voltage control TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC........247
Secondary test............................................................................249
Check the activation of the voltage control operation.................249
Check the normal voltage regulation function............................ 250
Check the undervoltage block function.......................................251
Check the upper and lower busbar voltage limit.........................251
Table of contents
8 Transformer protection RET670 2.2 ANSI
Commissioning manual
Check the overcurrent block function......................................... 251
Single transformer...................................................................... 252
Parallel voltage regulation.......................................................... 253
Completing the test.....................................................................258
Single command, 16 signals SINGLECMD..................................... 258
Interlocking...................................................................................... 258
Scheme communication....................................................................... 258
Scheme communication logic for distance or overcurrent
protection ZCPSCH (85)..................................................................258
Testing permissive underreaching..............................................259
Testing permissive overreaching................................................259
Testing blocking scheme............................................................ 259
Testing delta blocking scheme................................................... 260
Checking of unblocking logic...................................................... 261
Completing the test.....................................................................261
Phase segregated scheme communication logic for distance or
overcurrent protection ZC1PPSCH (85).......................................... 261
Testing permissive underreaching..............................................261
Testing permissive overreaching................................................262
Testing blocking scheme............................................................ 262
Completing the test.....................................................................263
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH (85)..............................................263
Current reversal logic................................................................. 263
Weak end infeed logic................................................................ 264
Completing the test.....................................................................265
Scheme communication logic for residual overcurrent protection
ECPSCH (85).................................................................................. 265
Testing the directional comparison logic function.......................265
Completing the test.....................................................................267
Current reversal and weak-end infeed logic for residual
overcurrent protection ECRWPSCH (85)........................................ 267
Testing the current reversal logic............................................... 267
Testing the weak-end infeed logic.............................................. 268
Completing the test.....................................................................270
Logic..................................................................................................... 270
Tripping logic, common 3-phase output SMPPTRC (94)................ 270
3 phase operating mode.............................................................270
1p/3p operating mode.................................................................271
1p/2p/3p operating mode............................................................271
Circuit breaker lockout................................................................272
Table of contents
Transformer protection RET670 2.2 ANSI 9
Commissioning manual
Completing the test.....................................................................273
Monitoring............................................................................................. 273
Gas medium supervision SSIMG.................................................... 273
Testing the gas medium supervision for pressure alarm and
pressure lockout conditions........................................................ 273
Testing the gas medium supervision for temperature alarm
and temperature lock out conditions...........................................274
Completing the test.....................................................................274
Liquid medium supervision SSIML.................................................. 274
Testing the liquid medium supervision for level alarm and
level lockout conditions...............................................................275
Testing the liquid medium supervision for temperature alarm
and temperature lock out conditions...........................................275
Completing the test.....................................................................275
Breaker monitoring SSCBR.............................................................276
Verifying the settings.................................................................. 276
Completing the test.....................................................................278
Event function EVENT.....................................................................278
Limit counter L4UFCNT...................................................................278
Completing the test.....................................................................278
Estimation of transformer insulation life LOLSPTR (26/49HS)........279
Verifying the signals and settings............................................... 279
Completing the test.....................................................................280
Metering................................................................................................281
Pulse-counter logic PCFCNT.......................................................... 281
Function for energy calculation and demand handling ETPMMTR. 281
Verifying the settings.................................................................. 281
Completing the test.....................................................................282
Station communication......................................................................... 283
Multiple command and transmit MULTICMDRCV /
MULTICMDSND.............................................................................. 283
Remote communication........................................................................ 283
Binary signal transfer.......................................................................283
Basic IED functions...............................................................................284
Parameter setting group handling SETGRPS................................. 284
Verifying the settings.................................................................. 285
Completing the test.....................................................................285
Exit test mode....................................................................................... 285
Section 12 Primary injection testing.................................................... 287
Transformer Voltage Control ATCC......................................................287
Table of contents
10 Transformer protection RET670 2.2 ANSI
Commissioning manual
Load drop compensation function, LDC.......................................... 287
Voltage control of Parallel Transformers......................................... 289
Minimum Circulating Current (MCC) method...................................289
Master Follower (MF) method..........................................................291
Completing the test..........................................................................292
Section 13 Checking the directionality................................................ 293
Overview...............................................................................................293
Testing the directionality of the distance protection..............................293
Section 14 Commissioning and maintenance of the fault
clearing system................................................................. 297
Commissioning tests.............................................................................297
Periodic maintenance tests...................................................................297
Visual inspection..............................................................................298
Maintenance tests........................................................................... 298
Preparation................................................................................. 299
Recording................................................................................... 299
Secondary injection.................................................................... 299
Alarm test................................................................................... 299
Self supervision check................................................................300
Trip circuit check.........................................................................300
Measurement of service currents............................................... 300
Restoring.................................................................................... 301
Section 15 Troubleshooting.................................................................303
Checking the self supervision signals...................................................303
Checking the self supervision function............................................ 303
Determine the cause of an internal failure..................................303
Self supervision HMI data................................................................303
General IED status..................................................................... 303
Fault tracing.......................................................................................... 304
Internal fault indications...................................................................304
Using front-connected PC............................................................... 305
Diagnosing the IED status via the LHMI hint menu......................... 307
Repair instruction..................................................................................309
Repair support...................................................................................... 310
Maintenance......................................................................................... 310
Section 16 Glossary............................................................................ 311
Table of contents
Transformer protection RET670 2.2 ANSI 11
Commissioning manual
12
Section 1 Introduction
1.1 This manual
The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for assistance
during the testing phase. The manual provides procedures for the checking of external
circuitry and energizing the IED, parameter setting and configuration as well as verifying
settings by secondary injection. The manual describes the process of testing an IED in a
substation which is not in service. The chapters are organized in the chronological order
in which the IED should be commissioned. The relevant procedures may be followed also
during the service and maintenance activities.
1.2 Intended audience
This manual addresses the personnel responsible for commissioning, maintenance and
taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well experienced in
using protection equipment, test equipment, protection functions and the configured
functional logics in the IED.
1MRK 504 165-UUS - Section 1
Introduction
Transformer protection RET670 2.2 ANSI 13
Commissioning manual
1.3 Product documentation
1.3.1 Product documentation set
IEC07000220-4-en.vsd
P
l
a
n
n
i
n
g
&
p
u
r
c
h
a
s
e
E
n
g
i
n
e
e
r
i
n
g
I
n
s
t
a
l
l
i
n
g
C
o
m
m
i
s
s
i
o
n
i
n
g
O
p
e
r
a
t
i
o
n
M
a
i
n
t
e
n
a
n
c
e
D
e
c
o
m
m
i
s
s
i
o
n
i
n
g
D
e
i
n
s
t
a
l
l
i
n
g
&
d
i
s
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the
various tools available within the PCM600 software. The manual provides instructions on
how to set up a PCM600 project and insert IEDs to the project structure. The manual also
recommends a sequence for the engineering of protection and control functions, LHMI
functions as well as communication engineering for IEC 60870-5-103, IEC 61850, DNP3,
LON and SPA.
The installation manual contains instructions on how to install the IED. The manual
provides procedures for mechanical and electrical installation. The chapters are organized
in the chronological order in which the IED should be installed.
Section 1 1MRK 504 165-UUS -
Introduction
14 Transformer protection RET670 2.2 ANSI
Commissioning manual
/