Fulton Europack 150-300kW User manual

Type
User manual
This manual must be available to the boiler operator at all times. EU-IOMM-2018-9
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Europack 150 kW - 300 kW
Electric Steam Boiler
EU-IOMM-2018-9
Fulton Ltd
Page II
EU-IOMM-2018-9
Fulton Ltd
Page III
TABLE OF CONTENTS
I Warnings & Cautions Explained IV
II Warnings & Cautions In Manual IV
III Regulations VI
SECTION 1 - INTRODUCTION
1.1 General 1
1.2 Technical Data 1
1.3 Product Overview 1
SECTION 2 - INSTALLATION
2.1 General 5
2.2 Pre-Installation 5
2.2.1 Receiving Inspection 5
2.2.2 Siting 6
2.3 Boiler Connections 6
2.3.1 Steam Safety Valves 8
2.4 Electrical Requirements 9
2.4.1 Electrical Customer Connections 11
2.5 Water Supply 13
2.5.1 Glossary of Water Supply Terms 13
2.6 PipingSpecications 15
2.7 Insulation 16
2.8 Pipework leak/Pressure Tests 16
SECTION 3 - COMMISSIONING
3.1 Commissioning the Boiler 17
3.2 Cleaning Steam Lines and Pressure Vessels 20
SECTION 4 - OPERATION
4.1 General 21
4.2 Controls 21
4.2.1 Boiler Control Panel 22
4.2.2 Steam Pressure Controls 24
4.2.2.1 Setting Steam Pressure Controls 25
4.2.2.2 Step Controllers - Master and Slave 26
3.2.2.3 Step Controller Indicator Lights 27
4.2.2.4 LOGO! PLC 28
4.3 Filling The Boiler 29
4.4 Draining the Boiler 30
4.5 Boiler Start-Up (from cold)-all models 31
4.5.1 Boiler Start-Up Following short term Shut-Down 31
4.6 Boiler Shut-Down 32
4.6.1 Short Term Shut-Down (hours) 32
4.6.2 Long Term Shut-Down (weeks) 32
Electrical diagrams supplied separately
SECTION 5 - MAINTENANCE
5.1 Visual Checks 33
5.2 Water Level and Low Water Safety Controls 34
5.2.1 Feedwater Pump Test 34
5.2.2 Low Water Level Checks 35
5.2.3 Evaporation Check 35
5.3 Blowdown Procedures 36
5.3.1 Main Boiler Blowdown 36
5.3.2 Water Column Blowdown 36
5.3.3 Water Level Gauge (Sight Glass) Blowdown 37
5.4 Boiler Internal Inspection 37
5.5 Fitting New Gaskets To Boiler Inspection Holes 38
5.5.1 Important Information 38
5.5.2 Fitting Procedure 39
5.6 Element Care and Protection 40
5.6.1 Element Removal 41
5.7 Cleaning Water Level Probes 42
5.8 Schedule of Operator Tests and Checks 43
5.8.1 Daily 44
5.8.2 Weekly-in addition 44
5.8.3 Monthly-in addition 44
5.8.4 Three Monthly-in addition 45
5.8.5 After All Repairs & Maintenance in addition 45
5.9 Maintenance Record Keeping 46
SECTION 6 - TROUBLESHOOTING
6.1 Troubleshooting-boiler 47
6.2 Troubleshooting-feedwater pump 48
6.2 Troubleshooting-feedwater pump 49
APPENDIX A - TI SHEETS
 EUDimensions&Specication 52
EU Probe Lengths 54
Recommended Water Conditions 56
High Integrity Water Level Controls 57
Water Level Probes 58
Auto TDS Blowdown Systems 60
Auto TDS Blowdown System Install Guide 62
Auto Timed Blowdown System 64
APPENDIX B - WIRING DIAGRAMS
1.1 General 65
APPENDIX C - SPARE PARTS
1.1 Ordering Spares 67
EU-IOMM-2018-9
Fulton Ltd
Page IV
SAFETY PRECAUTIONS
SAFETY
The instructions provided for the operation and maintenance of the boiler MUST be observed. Failure to do so could result in
damage to the boiler and serious personal injury.
For your safety!
The following WARNINGS, CAUTIONS and NOTES appear in various sections of this manual.
 WARNINGS must be observed to prevent serious
injury or death to personnel.
 CAUTIONS must be observed to prevent damage
or destruction of equipment or loss of operating
effectiveness.
 Notes: must be observed for essential and
effective operating procedures, conditions and as
a statement to be highlighted.
It is the responsibility and duty of all personnel involved
in the operation and maintenance of this equipment
to fully understand the WARNINGS, CAUTIONS and
NOTES by which hazards are to be eliminated or
reduced.
Personnel must become familiar with all aspects
of safety and equipment prior to operation or
maintenance of the equipment.
WARNING
Steam boilers are a potential hazard, possibly fatal if not properly maintained.
CAUTION
It is vitally important that the instructions given in this manual are strictly adhered to. Failure to carry
out the routine maintenance checks could result in a drastic reduction in the life expectancy of the

!
!
I WARNINGS & CAUTIONS EXPLAINED
II WARNINGS & CAUTIONS IN MANUAL
EU-IOMM-2018-9
Fulton Ltd
Page V
SAFETY PRECAUTIONS
WARNING
Do not try to do repairs or any other maintenance work
you do not understand. Obtain a service manual from
Fulton Ltd or call a Fulton service engineer.
It is the responsibility of the installer to ensure all parts
suppliedwiththeboilerarettedinacorrectandsafe
manner.
Understand the electrical circuit before connecting
or disconnecting an electrical component. A wrong
connection can cause injury and or damage.
A defective boiler can injure you or others. Do not
operate a boiler which is defective or has missing
parts. Make sure that all maintenance procedures are
completed before using the boiler.
LIFTING EQUIPMENT
Make sure that lifting equipment complies with all local
regulations and is suitable for the job. You can be
injured if you use faulty lifting equipment. Make sure the
lifting equipment is in good condition.
Operating the boiler beyond its design limits can
damage the boiler, it can also be dangerous. Do
not operate the boiler outside its limits. Do not try
to upgrade the boiler performance by unapproved
modications.
Non-approvedmodicationscancauseinjuryand
damage. Contact your Fulton dealer before modifying
the boiler.

operate and maintain the boiler and its equipment.
Steam boilers have high temperature surfaces, that if
touched may cause serious burns. Only competent and
qualiedpersonnelshouldworkonorinthelocality
of a steam boiler and ancillary equipment. Always
ensuretheworkingareaandoorareclearofpotential
hazards, work slowly and methodically.
DoNOTstoreinammablematerialsneartheboiler.
The importance of correct boiler water and feedwater
cannot be over emphasised, see the relevant section in
this manual.
Prior to the commencement of any work requiring the
removal of cover plates and the opening of control
panel box, the electrical supply to the boiler must be
isolated.
Boilers should always be drained through an approved
blowdown vessel.
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation.
!
WARNING
Never attempt to operate equipment that has failed to
pass all the safety checks.
Follow proper lockout procedures for the electrical and
water connections.
If any “Manual Reset” limit device trips, DO NOT reset
without determining and correcting the cause. (Manual
Reset Limits may include: high temperature limit, high
pressure limit, low water.)
Never tamper with low water (liquid level) cut-off
sensors or circuitry.
Check daily that the equipment area is free and clear
ofanycombustiblematerials,includingammable
vapours & liquids.
Donotstoreorusegasolineorotherammable
vapours and liquids or corrosive materials in the vicinity
of this or any other appliances. Cements for plastic pipe
should be kept away from all sources of ignition.
Proper ventilation should be maintained to reduce the
hazard and to minimize breathing of cement vapours.
No shut-off of any kind shall be placed between
the safety relief valve and the equipment or in
the discharge pipe between such valve and the
atmosphere. Doing so can cause an accidental
explosion from overpressure.
The discharge from the safety relief valve shall be
so arranged that there will be no danger of scalding
personnel or damage to equipment. Provisions should
be made to properly drain safety relief valve discharge
piping.
Fluids under pressure may cause injury to personnel or
damage to equipment when released. Be sure to shut
offallincomingandoutgoinguidshut-offvalvesand
carefully decrease all trapped pressures to zero before
performing any maintenance.
When opening any drains on the equipment or piping
system, steps should be taken to avoid scalding/
burningofpersonnelduetohotuids.Whenever
possible, the system should be cooled prior to opening
any drains.
Hot surfaces (over 49 °C) should be insulated or
shielded for safety. See Installation section.
Improper installation or maintenance of gauge glass
and connections can cause immediate or delayed
breakage resulting in bodily injury and/or property
damage. Only properly trained personnel should install
and maintain gauge glass connections. Wear safety
glasses during installation. Be sure all parts are free of
chips and debris.
!
EU-IOMM-2018-9
Fulton Ltd
Page VI
SAFETY PRECAUTIONS
CAUTION
Obey all laws and local regulations which affect you
and your boiler.
LOW FEEDWATER TEMPERATURE
Low feedwater temperature can result in thermal shock
to the boiler pressure vessel. Return the maximum
amount of condensate and if necessary preheat the
feedwater. If in doubt consult Fulton Ltd.
WATER SOFTENER and CHEMICAL TREATMENT
The chemicals required to operate the water softeners
and chemical treatment plants CAN BE SUPPLIED by
Fulton Ltd.
It is the responsibility of the operator to ensure
adequate supplies of chemical are available at all times
(including commissioning). Costly repairs could be
required should the plant operate without chemicals or
the wrong dosage of chemicals.
HYDRAULIC TEST - RISK OF BRITTLE FRACTURE
Hydraulic testing requires specialist equipment and
is normally only required by engineering surveyors /
inspectors. In order to ensure the material/ pressure
vessel does not suffer from brittle fracture, hydraulic
testing should not be carried out below 7 °C.
Some soap used for leak testing is corrosive to certain
types of metals. Clean all piping thoroughly after
completing the leak check.
!
CAUTION
A temperature exceeding 49 °C* in the boiler room
may cause premature failure of electrical components.
Provisions should be made to maintain an ambient
temperature of 49 °C* or less (the panel box interior
should not exceed 52 °C*.
*Pumps, Programmable Logic Controllers (PLC)
or ModSync panels may require lower ambient
temperatures or additional cooling.
Temperatures below 4 °C in the boiler room may cause
premature failure of the boiler and components due
to risk of freezing and providing cold feedwater. It is
advisable to have heated feedwater to increase the
workinglifeofaboilerandtoincreaseefciency.
Forallsystemscontainingboilersorunredsteam
generators, the water chemistry in the boiler must be
kept within the limits outlined in this manual. Failure to
do so may cause premature pressure vessel failure and
poor steam quality and will void the warranty.
Do not run the pump dry. Irreparable damage to the
seal can result. Prime the pump in accordance with the
manufacturer’s instructions. Never operate the pump
with a closed discharge valve.
!
III REGULATIONS
Observe the following when working on this system:
• Workonelectricalequipmentmustonlybecarriedoutbyaqualiedelectrician.
• All legal instructions regarding the prevention of accidents,
• All legal instructions regarding environmental protection,
• The Code of Practice of relevant trade associations,
• AllcurrentsafetyregulationsasdenedbyDIN,EN,DVGW,TRGI,TRF,VDEandalllocallyapplicable
standards,
• Gas Safety (Installation & Use) Regulations
- The appropriate Building Regulation either the Building regulations, the Building Regulation (Scotland) or
Building Regulations (Northern Ireland),
- The Water Fittings Regulation or Water Bylaws in Scotland,
- The current I.E.T. Wiring Regulations.
EU-IOMM-2018-9
Fulton Ltd
Page VII
SAFETY PRECAUTIONS
The Pressure System Safety Regulations 2000
Fulton boilers fall within the scope of the Pressure Systems Examination Scheme.
Regular inspections are therefore required by a competent person.
The scope of the examination and the actual intervals between examinations is at the discretion of the competent
person.
It is the responsibility of the user to provide a written scheme of examination for those parts of the system in which
a defect may give rise to danger.
Instructions in this manual are provided for the safe operation and maintenance of the boiler and do not cover
periodic statutory inspections.
For further information contact:
(a) SAFed
SAFETY ASSESSMENT FEDERATION Limited.
Nutmeg House,
60 Gainsford Street,
Butlers Wharf,
London, SE1 2NY.
(b) HealthandSafetyExecutivelocalofce.
(c) Your Competent Person.
CAUTION
In case of emergency
This boiler has been designed and constructed to meet all of the essential requirements of the applicable
European Directives and subject to proper maintenance should not give occasion to any hazardous conditions.
If such a condition should occur during commissioning or during subsequent operation of this product,
whatever the cause, then the fuel supply to the boiler should be isolated immediately, until the fault has been
investigatedbyacompetentpersonandrectied.
!
EU-IOMM-2018-9
Fulton Ltd
Page VIII
EU-IOMM-2018-9
Fulton Ltd
Page 1
INTRODUCTION - 1
SECTION 1 - INTRODUCTION
1.1 GENERAL
1.2 TECHNICAL DATA
Forafullspecicationreferto
1.3 PRODUCT OVERVIEW
TheFultonEuropackelectricsteamboilerisahighlyefcientunitdesignedtomeetthe
requirements of the mid-range demand steam user.
CONTINUED ON NEXT PAGE
Prior to shipment, the following inspections and tests are made to ensure the highest standards of
manufacturing for our customers:
• Material inspections
• Manufacturing process inspections
• Hydrostatic test inspection
• Electrical components inspection
• Operating test
• Crating inspection
This manual is provided as a guide to the correct operation and maintenance of your Fulton
equipment, and should be read in its entirety and be made permanently available to the staff
responsible for the operation of the boiler. It should not, however, be considered as a complete
code of practice, nor should it replace existing codes or standards which may be applicable.
Fulton reserves the right to change any part of this installation, operation and maintenance
manual.
Installation, start-up, and maintenance of this equipment can be hazardous and requires trained,
qualiedinstallersandservicepersonnel.Trainedpersonnelareresponsiblefortheinstallation,
operation, and maintenance of this product, and for the safety assurance of installation, operation,
and maintenance processes. Do not install, operate, service or repair any component of this
equipmentunlessyouarequaliedandfullyunderstandallrequirementsandprocedures.
EU-IOMM-2018-9
Fulton Ltd
Page 2
INTRODUCTION - 1
Figure. 1 - General Arrangement
17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
21
18
EU-IOMM-2018-9
Fulton Ltd
Page 3
INTRODUCTION - 1
1. Boiler control panel
2. Control panel door lock
3. Boiler door isolator switch
4. Front lower access panel
5. Operating pressure transducer
6. High pressure limiter
7. Water level gauge (sight glass)
8. Water level gauge blowdown valve
9. Steam pressure gauge
10. Top access doors
11. Front access door
12. Main steam stop valve
13. Boiler steam safety valve
14. Boiler water sample point
15. Feedwater check and isolating valves
16. Main boiler blowdown valve
17. Water bottle (pump on/off probes)
18. Water bottle blowdown valve
19. Water level probes
20. Boiler elements
21. Boiler ID plate
Key
20
19
Figure. 2 - General Arrangement Top
EU-IOMM-2018-9
Fulton Ltd
Page 4
Description Comments
A Serial number UniquenumbergiventoeachFultonboilerforidentication
B Design code British standard (BS) used to design and manufacture the product
C Year of manufacture Year that the product was made (not year boiler was sold or commissioned)
D Test pressure The pressure the boiler was tested to during hydraulic testing
E Date of test This is the date of the hydraulic testing
F Design pressure The pressure used in the design calculations
G Maximum allowable
pressure Maximum safe pressure the boiler has been designed to operate at
H Maximum temperature The max temperature used in the design calculations
K Design temperature The temperature used in the design calculations
L Safety valve set pressure Pre-setliftpressureofthettedsafetyvalve(settopreventboilersteam
overload)
M Internal volume Internal space of boiler shell
N Max continuous rating Energy input of the boiler
P Electrical requirement Electrical supply requirements for the boiler
Q Short circuit rating A rating on components and assemblies representing the maximum level of
short-circuit current that a component or assembly can withstand.
R CE marking European Conformity - mandatory conformity marking for certain products
sold/manufactured within the European Economic Area
S AnotiedbodyisanentitythathasbeenaccreditedbyaMemberState
to assess whether a product to be placed on the market meets certain
preordained standards
T Manufactured by Company that manufactured the product
Figure. 3 - Boiler name plate
A
B
C
D
E
F
G
H
K
L
M
N
P
Q
R
S
T
EU-IOMM-2018-9
Fulton Ltd
Page 5
INSTALLATION - 2
2.1 GENERAL
SECTION 2 - INSTALLATION
2.2 PRE-INSTALLATION
Prior to delivery of the boiler, consideration should be given to the following:
(Planning regulations may call for more consents than those listed below, always check with your
Local Planning Authority).
A. Local Planning consents where appropriate.
B. Consideration given to access for delivery and positioning of the boiler.
C. Preparation of a suitable base, which must be able to support the total weight of the system
under operating conditions.
The locations of services to the site required for the system, under operating conditions.
D. Electricity supply, check the loading required/available.
E. Drainage system, check the suitability of the drainage system.
F. Local regulations for discharge into existing drains.
G. Suitable access for delivery and off-loading.
H. Safe access to the plant when installation is complete.
The installation of the Fulton Europack electric steam boiler should be carried out by competent
personnel in accordance with all relevant safety regulations. It is the responsibility of the installer
to ensure that these regulations are complied with.
The customer should examine the equipment for any damage. It is the responsibility of the installer
toensureallpartssuppliedwiththeequipmentarettedinacorrectandsafemanner.
2.2.1 RECEIVING INSPECTION
EU-IOMM-2018-9
Fulton Ltd
Page 6
INSTALLATION - 2
2.2.2 SITING
Theboilerhouseshouldbesufcientlysizedtoalloweasyandsafeaccesstoallpartsofthe
boiler for operational and maintenance purposes.
Reference should be made to to ascertain
the relevant dimensions and weights, special note should be taken of the required vertical
clearance required for maintenance.
Theooringmustbelevel,laidinanon-combustiblematerialandbeofsufcientstrengthto
support the boiler.
Consideration must be given to controlling the boiler room temperature, the fan used to cool the
inside of the control box will only be effective if the cooling air drawn from the boiler room is at
a reasonable ambient temperature. When calculating the estimated boiler room temperature, it
should be noted that emissions from the boiler alone will be in the range of 0.5 - 1.0% of the boiler
output.
All connections for services are mounted at the rear of the boiler.
For connection sizes, refer to .
1. Feedwater Inlet
Anisolatingvalveanddisctypenon-returnvalvearesuppliedttedtotheboiler.Thisshouldbe
connected to the feedwater pump discharge which is mounted separately.
2. Steam Safety Valve Discharge
The outlet from this valve should be piped to a safe discharge point and the piping should be
so arranged that condensate trapped in the discharge pipe is drained away from the valve.
3. Steam Outlet Valve
Distribution pipework should be run from the main steam valve near the top of the boiler to the
steam delivery point(s). Care should be taken to ensure that adequate condensate drainage and
expansion facilities are provided within the pipework run(s).
To prevent excessive loads being imposed on the main steam isolating valve, the pipework
shouldbesecuredneartheboiler,ensuringadequateexibilityexistsinthepipeworkbetween
the steam valve and the securing point, to minimise any loads imposed on the valve.
CAUTION

(11.2 bar). This valve is provided as a safety device for the boiler and should not be used as the sole
protection for other equipment using steam from the boiler.
!
2.3 BOILER CONNECTIONS
WARNING
Failure to provide required and safe access to the equipment could impede commissioning and maintenance.
Service technicians are instructed not to commence commissioning if hazardous conditions exist.
!
EU-IOMM-2018-9
Fulton Ltd
Page 7
INSTALLATION - 2
Figure. 4 - Boiler Connection Points
5
6
1
2
3
4
7
4. Boiler Blowdown Valve
Connection must be made from the Blowdown valve to a blowdown receptacle of approved
design. Regulations exist covering such items and care must be taken to ensure compliance with
these regulations. If in any doubt regarding blowdown arrangements consult Fulton Ltd.

The water column contains the pump On/Off probes. The water column blowdown cock should be
connected to the auxiliary blowdown line.
6. Water Level Gauge Blowdown Valve
The water level gauge blowdown cock should be connected to the auxiliary blowdown line from
the water column blowdown valve by 3/8 in. soft copper tubing.
WARNING
Improper installation or maintenance of the water level gauge assembly can cause immediate or

!
7. Water Sample Outlet
Ifthewatersampleoutletisused,thevalveshouldbettedascloseaspossibletotheboiler.To
take a sample safely, a water sample cooler (not supplied as standard) should be installed.
EU-IOMM-2018-9
Fulton Ltd
Page 8
INSTALLATION - 2
2.3.1 STEAM SAFETY VALVES
WARNING

other items not capable of accepting boiler pressure.
!
Safetyvalvesarefactoryttedandpre-set,theyMUSTNOTbeadjusted.Thedischargeoutlet
should be piped to a safe discharge point and the piping so arranged that any condensate
trapped in the pipework will drain away from the valve.
Note: It is recommended that the safety valve discharge pipework is installed to the requirements of
BSEN 13480-1:2012
a) The lift pressure is indicated on the safety valve 
b) Thesafetyvalvettedtotheboilerisdesignedtopreventtheboilerexceedingitsdesign
pressure.
c) Any system connected to the boiler not capable of accepting boiler pressure must be protected
by a separate safety valve set to the required pressure.
d) Ensure pipes and connections are clean and free of any foreign material.
e) Do not install using a pipe wrench. Use the appropriately sized wrench on the bonnet nut.
f) Install the valve vertically with no unnecessary intervening piping between the boiler and the
valve.
g) Do not cap or plug the weep hole on the side of the safety valve.
h) A discharge pipe shall be of a pipe size equal to, or greater than, the outlet of the safety valve.
i) Minimizedischargepipingttingsandoverallpipingruntoavoidoverpressurizationofthe
piping, limiting safety valve discharge volume.
j) Do not support discharge piping with the safety valve. Discharge piping must be supported
adequately by appropriate means.
k) Terminate the discharge pipe directly to atmosphere. Discharge pipe must not contain a shut
off valve of any sort.
l) Adrainpipeistobettedtothelowestpointofthedischargepipework.Pipesizetobeno
greater than 10 mm.
EU-IOMM-2018-9
Fulton Ltd
Page 9
INSTALLATION - 2
2.4 ELECTRICAL REQUIREMENTS
CAUTION
Anyelectricalworkshouldbeundertakenbyaqualiedelectriciantocurrentlocalregulations.
!
WARNING
Assure all electrical connections are powered down prior to attempting replacement or service of electrical
components or connections of the equipment.
!
An individual wiring diagram for the boiler is located on the inside cover of the control box.
Make sure the information on the electrical drawing corresponds to your voltage and frequency.
Check the supply voltage and make sure that there is no over-or under-voltage exceeding 10% of
the nominal value.
Whenreferringtotheelectricalspecicationoftheboiler,thereferencenumberlocatedonthe
rear inside wall of the control box and the wiring diagram number should be quoted.
The audible alarms provided are mounted on the side of the control panel, if not audible they
should be repositioned where they can be heard by a person competent to take the appropriate
action should the alarm be activated.
Unlessotherwisespecied,thealarmssuppliedwillbemainsvoltagemodels.Unlessotherwise
speciedallmodelsaresuppliedwithburnermotorsandfeedwaterpumpmotorsarrangedfor
operation on a three phase supply.
Awall-mounted,fuseddisconnectsizedfortheunitmustbeprovidedandttedbytheclient/
contractor, if disconnect is not supplied on the panel.
Connect power to the incoming isolator as supplied on the inside of the panel box.
Care should be taken to ensure the supply cable is the correct size and installed in accordance
with local regulations.
Note: Single skid systems are generally shipped completely pre-wired.
Note: The power ratings and requirements are given in Appendix A - TI-116-EU Dimensions & Specication.
EU-IOMM-2018-9
Fulton Ltd
Page 10
INSTALLATION - 2
Figure. 5 - Electrical Panel
3
2
11
5
4
1
6
10
7
9
8
12
1. Miniature relays
2. MCB
3. Door electrical isolator (supply cable connection point)
4. LC relays
5. Element circuit breakers
6. Pump contactor
Key
7. Fuse terminal
8. Step controller (slave)
9. Step controller (master)
10. Pump circuit breakers
11. Element contactors
12. LOGO unit (operating pressure control)
EU-IOMM-2018-9
Fulton Ltd
Page 11
INSTALLATION - 2
2.4.1 ELECTRICAL CUSTOMER CONNECTIONS
Volt Free Contacts.
1st and 2nd low water and high steam pressure Volt Free Contacts are provided for giving a
Remote Alarm signal or connecting to a site BMS system. (Contact Rating 230V 5A).
Pump Interrupt.
APumpInterruptoptionallowsthecustomertotaremoteswitchtointerrupttheboilerfeed
waterpump.Switchshouldbeanopencontacttointerruptthepumpoperation.Afactorytted
link must be removed to use this option.
Bottom Blowdown Valve.
Connect the Bottom Blowdown valve as shown. A controller in the control panel will then allow
automatic bottom blowdown to occur on a time basis. The contact gives feed back to the
controller that blowdown valve has opened and closed as required. (Valve supply Max. rating
250V 3A resistive, 250V 1A inductive. Valve switch contact rating 230V 10A Max.).
TDS Solenoid Valve.
Connect the TDS Solenoid valve as shown. A controller in the control panel will then allow
automatic TDS blowdown to occur as required by monitoring the TDS in the boiler. (Valve supply
Max. rating 250V 3A resistive, 250V 1A inductive).
Blowdown Alarm.
The blow down alarm is triggered if a high TDS value is measured or if bottom blowdown is
triggeredbutthevalvecontactdoesnotopenwithinaspeciedtimeindicatingavalvefailure.
(Max. rating 250V 3A resistive, 250V 1A inductive).
Water softener.
A water softener can be powered from the boiler control panel. (230V, 2A Max.).
Feed Line Chemical Dosing.
A Feed line chemical dosing unit can be powered from the boiler control panel. (230V, 2A Max.).
EU-IOMM-2018-9
Fulton Ltd
Page 12
INSTALLATION - 2
Figure. 6 - Electrical Customer Terminal Connections
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78

Fulton Europack 150-300kW User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI