FläktGroup DC_9422GB 620230530_R3 Specifications are subject to alteration without notice.
3
ESAD Smoke Control Duct System - Installation and Maintenance
INSTALLATION
1. Select a suitable section of ducting and check that the duct can be
installed in accordance with the drawing below, before collecting the
necessary components from the storage area.
2. Collect the necessary fittings and ducts. Check that all parts are CE-
marked and they are not damaged in anyway that may cause air leak-
ages once installed.
3. Cut the ducts in straight lines to the desired length. Make sure you
deburr the duct ends thoroughly, using a deburring tool.
Locate the screws/pop rivets at a distance from the duct end, so the
rubber seal will not be damaged or peirced. Check the maximum dis-
tance for K from table 2 below.
5. Finally tape all joints carefully with aluminium/duct tape, which has
thickness at the minimum 30 μm and the width at the minimum of 50
mm. Lock the end of aluminium taping with screws or pop rivets.
Table 2.
Li
K
Table 1.
4. Assemble suitable sections on the floor. To connect one part into an-
other, turn part while pushing it in and then lock the joints.
All joints must be secured by means of pressure proof steel pop riv-
ets or screws (min Ø 4,2 mm). The number of screws / pop rivets are
specified in table 1.
6. Drop rods should not exceed the maximum distances according to
table 3. Drop rod strength class should be 8.8 and diameter according
to table 3.
Specified dimensions of duct clamp fasteners have to be used for sus-
pending the duct sections. Duct clamp fasteners have to be made from
galvanised steel, minimum thickness of
1,5 mm and a width of 25 mm. Example
type ‘BDSK’ or ‘Müpro’ duct clamp fas-
tener with or without vibration control.
See picture below.
Table 3.
Suspending solution for the ESAD duct sections is based on results of
official fire tests according to product standard EN 12101-7 for single
compartment applications.
Fire class for ESAD and fittings and other components is E 120 S. Fire
test temperature is 600 °C.
Duct clamp fasteners with drop rods should be placed always close to
joints, if possible.
Duct size
(cm)
Max distance
between hangers
L (m)
Threated rod
(mm)
010 28
012 2 8
016 2 8
020 2 8
025 2 8
031 2 8
040 210
050 210
063 210
080 210
100 210
Duct size (cm) Li (mm) Kmax (mm)
010...020 35 12
025...031 40 15
040...063 60 30
080...100 100 40
Duct size (cm) Number of screws / pop rivets
010...016 3
020...031 5
040...063 10
080...100 16