Deagostini MIG 29 Operating instructions

Type
Operating instructions
PACK 8PACK 8
STAGE PAGE
36 Forward starboard fuselage frame 91
37 Fuselage nose bottom frame 93
38 Port afterburner fairing 96
39 Port afterburner nozzle 98
40 Port afterburner 100
Published in the UK by De Agostini UK Ltd, Royds Withy King, 65 Carter Lane, London EC4V 5EQ.
Published in the USA by De Agostini Publishing USA, Inc., 299 Park Avenue • New York, New York 10171.
All rights reserved © 2020
Warning: Not suitable for children under the age of 14.
is product is not a toy and is not designed or intended for use in play.
Items may vary from those shown.
91
Your parts
D060 - Forward starboard fuselage frame
BM screws (25 pcs.)
Stage 36:
Forward starboard
fuselage frame
Assembly
BM
D060
1 Connect the forward starboard fuselage frame
(D060) to the rest of the forward fuselage frame,
aligning the holes of both. Secure them together with
two BM screws.
D058D060
92
D011
2 Align the holes of the forward fuselage frame to those of the middle frame, as shown. Secure the parts with 10 BM
screws, following the sequence shown.
3 Here is how the fuselage should look now.
4 Fix the upper part of the fuselage removed in Stage 31 (D011) to the top of the middle fuselage frame using eight
BM screws. This stage is now complete.
D052
D052
D058 D056
93
Your parts
1. D061 - Fuselage nose
bottom frame
2. D062 - Bracket
3. D063 - Bar
BM screws
SM screws
MM screws
Stage 37: Fuselage nose
bottom frame
Assembly
BM
CM MM
D061
D062
D063
1 Place the bar (D063) in the indicated position in the fuselage
frame and secure there with two BM screws. You may want to
remove the antenna before fitting the bar.
2 Fix the bracket (D062) on the inside of
the nose, as shown, with a BM screw.
D063
D001
D062
94
3 Insert the fuselage frame into the nose of the fuselage, pressing it in on both sides. The frame should be flush with
the edge of the fuselage.
4 Press the frame into the fuselage, in the gap between the bracket and the sidewalls, as shown.
5 Secure the
frame to the
fuselage with
two MM
screws.
D060D001
D059
D057
95
D061
D053
D061
D061
D054
D061
6 Place the fuselage nose bottom frame (D061) over
the bottom of the nose frame. Secure in place with
six MM screws.
7 Secure the end of the frame with four BM screws,
as shown.
8 Fix the stringer (D053) to the underside of the
fuselage frame, aligning the holes at either end.
Tighten a CM screw into each of the holes.
9 Then fix the stringer (D054) onto the other side
of the frame with two CM screws. This stage is now
complete.
96
Your parts
1. P095 - Afterburner flange.
2. P101 - Fairing flaps (6 pcs.)
FP screws (15 pcs.)
Stage 38:
Port afterburner fairing
FP
P101
P095
97
Assembly
1 Fix the six fairing flaps (P101) to the afterburner flange (P095) using two FP screws per flap, as shown.
P101
98
Your parts
1. P102 - Afterburner
ducting.
2. P108 - Afterburner
nozzle (6 pcs.).
3. P110 - Cap.
FP screws
Stage 39:
Port afterburner nozzle
Assembly
FP
P108
P110
P102
1 Fix one of the afterburner nozzle pieces (P108) onto the afterburner ducting (P102) with an FP screw.
P102
P108
99
2 Continue to fit the rest of the afterburner nozzle parts to the duct.
100
Your parts
P109 - Afterburner.
FP screws
GP screws
Stage 40:
Port afterburner
Assembly
FP GP
P109
1 For this stage you will need
the assemblies form Stages
38 and 39, as well as the
part and screws supplied
with this stage. Insert the
afterburner duct (Stage 39)
inside the nozzle flaps and
into the flange (Stage 38).
P101P102
101
2 Place the afterburner
(P109) onto the afterburner
duct. Secure it in place with
a GP screw.
3 Secure the afterburner
(P109) to the flange with
three FP screws, as shown.
P109
P109
P095
P095
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13

Deagostini MIG 29 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI