Deagostini MIG 29 Operating instructions

  • Hello! I have reviewed the assembly guide for the MiG-29 model. I can assist you with any questions you might have about assembling your model. I can address steps related to the landing gear, air intake, and fuselage integration based on the information provided in document.
  • What parts are included in Stage 56?
    What are the components for Stage 57?
    What is assembled in Stage 58?
    What parts are used in Stage 59?
    What does Stage 60 cover?
PACK 12PACK 12
STAGE PAGE
56 Landing gear starboard ap 131
57 Front landing gear bay 133
58 Mounting the front landing gear 135
59 Port engine air intake 137
60 Port engine air intake 139
Published in the UK by De Agostini UK Ltd, Royds Withy King, 65 Carter Lane, London EC4V 5EQ.
Published in the USA by De Agostini Publishing USA, Inc., 299 Park Avenue • New York, New York 10171.
All rights reserved © 2020
Warning: Not suitable for children under the age of 14.
is product is not a toy and is not designed or intended for use in play.
Items may vary from those shown.
131
Your parts
1. D075 - Landing gear starboard flap
2. X008 - Hinge (2 pcs.)
FM screws
Stage 56: Landing gear
starboardap
D075
X008
FM
132
Assembly
1 Fix both hinges (X008) to the landing gear starboard flap (D074) with FM screws, as shown
X008 X008
D075
133
Your parts
1. P178 - Front landing gear bay
2. P179 - Strut
FP screws
Stage 57: Front landing
gear bay
P178
P179 FP
134
Assembly
2 Then fix the strut in place from the outside of the bay with an FP screw.
1 install the strut P179 in the recess in the front landing gear bay (P178), as shown.
P179 P178
P178
135
Stage 58: Mounting the
front landing gear
Assembly
1 You will need the assemblies from Stages 54
(front landing gear), 55 (landing gear port flap), 56
(landing gear starboard flap) and 57 (front landing
gear bay). Install the landing gear port flap onto the
port side of the lower fuselage section (D076), as
shown. Secure the two hinges into the recesses
with FM screws.
Your parts
D076 - Lower fuselage
section
ВМ screws
FM screws
BM
FM
D076
2 Install the landing gear starboard flap onto the the
lower fuselage section. Secure the hinges with two
FM screws.
D074
D076 D076
D075
136
3 Mount the front landing gear assembly (Stage 54)
onto the fuselage, as shown.
5 Make sure that the axles are positioned in the
corresponding recesses in the fuselage section.
4 Secure the part from the inside with an FM screw.
6 Place the landing gear bay over the landing gear on
the inside of the fuselage section. Align the tabs at
the sides with the posts and tighten a BM screw into
each of them to secure the bay.
D076 D076
D076 D076
D066D066
P178
P177
137
Stage 59: Port engine
air intake
Your parts
1. P180 - Port air intake section
2. X012 - Hinges (2 pcs.)
JP screws
X012
P180
JP
138
Assembly
1 Secure one
of the hinges
(X012) to the
side of the port
air intake section
(P180) with two
JP screws, as
shown.
2 Fix the second
hinge (X012) to
the other side
of the port air
intake section
with two more
JP screws.
X012
X012
P180
P180
139
Stage 60: Port engine
air intake
Your parts
1. P181 - Port air intake section
2. P182 - Port air intake section
3. P183 - Port air intake section
JP screws
P183
P181
P182
JP
140
Assembly
1 Retrieve the assembly
from the previous stage.
Place port air intake
section (P181) onto the
hinge at one end of the
assembly, as shown.
2 Carefully secure the
parts together with two
JP screws.
3 Install port air intake
section P182 onto other
end of the assembly.
4 Secure part P182 with
two JP screws.
P181
P181
P181
P180
P180
P182
P182
P180
P180
/