![](//vs1.manuzoid.com/store/data-gzf/7962eee289e19ae5e2f5d699cf1c989f/2/002372774.htmlex.zip/bgc.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
= =
88.90
3.50
2 beam installation
(see Step 2 Supplement)
use a
ruler to ensure both sides
are the same
temporarily install plate and
mark center of holes, then
mark opposite side.
pencil marks 1 beam installation
Prevent Unsightly Breakouts
drill most of the way from one
side DO NOT breakout then
repeat from opposite side
step 2
Installation Instructions, 56637 12