OZCO 56675 4″ Post to Beam – LS Operating instructions

  • Hello! I've reviewed the Installation Instructions for the OZCO Post to Beam Connectors P2B-LS-4 and P2B-IW-4. This document details the process for installing these connectors, which are designed for double beam installations. It also highlights that two styles, Laredo Sunset and Ironwood, are available. I'm ready to answer any questions you have about the installation process, required tools, or any other details outlined in the document.
  • What is required for a double beam installation?
    What tools are required for the installation?
    How many assemblies are included in the kit?
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
Laredo Sunset shown
Typical Installation
double beam installation
requires connectors on
both sides of post
Installation Instructions,
56675 4” Post to Beam (P2B-LS-4)
51775 4” Post to Beam (P2B-IW-4)
Installation Instructions, 56675 1
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
2 great styles
Same functionality
choose your
connection lifestyle
both styles available for
most products
Ironwood
(517XX series)
Laredo Sunset
(566XX series)
Laredo Sunset & Ironwood
Laredo Sunset & Ironwood
3
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
kit includes 2 assemblies
56675
Installation Instructions, 56675 4
1.45 MIN
2.00 MAX
3.25
7.99
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
1.45 MIN
2.00 MAX
kit includes 2 assemblies
203
7.99
51775
Installation Instructions, 56675 5
83
3.25
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
Suggested Tools
(others may be required)
Installation Instructions, 56675 6
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
mark location
to mount ledge
step 1
Installation Instructions, 56675 7
beam width
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
Tool Required
3/8" Driver
(Hex Cap Nut) provided
(OWT Screw) provided
step 2
Installation Instructions, 56675 8
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
beam
rests on
ledge
step 3
Installation Instructions, 56675 9
Tool Required
3/8" Driver
(Hex Cap Nut) provided
(OWT Screw) provided
/