OZCO 56676 8″ Post to Beam Flush – LS Operating instructions

Type
Operating instructions
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
Typical Installation
Laredo Sunset shown
upper fasteners sold
separately;
OWT Timber Screws
or OWT Timber Bolts
Installation Instructions,
56676 8" Post to Beam Flush (P2B-LS-8F)
51776 8" Post to Beam Flush (P2B-IW-8F)
Installation Instructions, 56676 1
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
2 great styles
Same functionality
choose your
connection lifestyle
both styles available for
most products
Ironwood
(517XX series)
Laredo Sunset
(566XX series)
Laredo Sunset & Ironwood
Laredo Sunset & Ironwood
3
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
56676
Installation Instructions, 56676 4
127
5.00
kit includes 2 assemblies
318
12.53
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
51776
Installation Instructions, 56676 5
127
5.00
kit includes 2 assemblies
305
12.00
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
Suggested Tools
(others may be required)
Installation Instructions, 56676 6
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
step 1
Installation Instructions, 56676 7
align notch with
beam (both sides)
beam(s) rests
on post
dato cut on
post. can be
single or double
beam width
Tool Required
3/8" Driver
(Hex Cap Nut) provided
(OWT Screw) provided
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
step 2 Timber Screws
Installation Instructions, 56676 8
Tool Required
3/8" Driver
(HCN)
(OWT Timber Screw)
both sold separately
OWT Timber
Screw
56621
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically
and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
see Installation Instructions,
OWT Timber Bolts BEFORE
proceeding
step 2 Timber Bolts
Installation Instructions, 56676 9
Tool Required
3/8" Driver
(HCN)
(Timber Bolt)
OWT Timber Bolt
sold separately
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9

OZCO 56676 8″ Post to Beam Flush – LS Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI