Danfoss SpeedUp™ heat panels in dry Installation guide

Type
Installation guide
1
Instruction
Danfoss Heating VICSC202 Heating Solutions
Installation of floor heating in dry installations
SpeedUp heat panels
1 2
Install SpeedUp perimeter insulation and support batten on dry, even
and load bearing substrate.
Following the layout begin the installation in one corner with a SpeedUp
header panel.
3 4
Next, position the SpeedUp heat panels (CZ-pipe distance 250 mm,
EZ-pipe distance 125 mm). Fill gaps and unheated areas with blank
panels.
Snap the pre-scored heat panels as required.
5 6
With light constructions (e.g. where laminate/engineered timber or
strongboard constructions are laid straight on to the heat panels) in rooms
> 12 m
2
all perimeter and header panels should be glued down. In rooms
< 12 m
2
it is recommended that all panels are glued down.
Where required cut individual pipe channels using the SpeedUp hot wire
cutter.
Produced by Danfoss A/S © 04/2009
VICSC202
7 8
Support battens in thresholds should be screwed down. Holding the pipe in a large curve to avoid tension, press the composite
pipe into the channels. Avoid lifting pipe once installed in the header
panels.
9 10
Press fittings should only be positioned between two aluminum sheets
and never in curved sections of pipe.
Cover pipe work in front of manifold with SpeedUp load bearing steel to
protect against damage.
Instruction Installation of floor heating in dry installations - SpeedUp heat panels
  • Page 1 1
  • Page 2 2

Danfoss SpeedUp™ heat panels in dry Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI