MULTIPLEX DI Purge Tube Routing (5030479) Installation guide

Type
Installation guide

This manual is also suitable for

11 Part No. 5030479
Revision 0
Carbonator Tank Purge Tube Routing Instructions for DI Series Units
Routing Instructions
1. During installation of unit the carbonator
tank purge tube (A) must be properly routed
to a drain. Once the splash panel has been
removed from unit remove twist tie (B) that
holds carbonator tank purge tube (See Figure
1).
2. Route carbonator tank purge tube (A) down
through the valve leads conduit, which is
located behind the carbonator tank (See
Figure 2). Be sure not to collapse or kink
carbonator tank purge tube during routing
from unit to drain.
3. The carbonator tank purge tube (A) will be
routed down through the valve leads conduit
and out bottom of unit to a drain (See Figure
3). Follow all local and national plumbing
codes when routing carbonator tank purge
tube to the drain.
Figure 1
B
A
Rear of Unit
Pressure Relief
Valve
Purge tube is connected to
the pressure relief valve on
carbonator tank and must
be routed to a drain
Figure 2
Figure 3
To Drain
Bottom
of
Unit
Valve Leads
Conduit
A
A
  • Page 1 1

MULTIPLEX DI Purge Tube Routing (5030479) Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI