LHBDP2 Series

Super Bright LEDS LHBDP2 Series Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Super Bright LEDS LHBDP2 Series Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Linear High Bay LED Light
Important: Read all instructions prior to installation. LHBDP2 Series
4400 Earth City Expy, St. Louis, MO 63045 866-590-3533 superbrightleds.com
Rev Date: V1 02/16/2022
This product should be installed by a fully certied electrician in
accordance with local building and electrical codes.
Due to risk of electric shock, ensure that the main power source and
circuit breakers are switched o before performing any installation or
wiring procedures.
Failure to properly support the xture during installation may cause
damage or injury, for which the manufacturer is not responsible. Ensure
the mount is securely attached and will support the weight of the xture.
Safety and Notes
LHBDP2-40K21-100
5yr
Wiring Diagram
User Manual
Line
Neutral
Ground
Black
L L
N N
GND GND
White
Dim (+)
Dim (-)
Purple
+ +
- -
Gray / Pink
Green
Line
Neutral
Ground
Black
L L
N N
GND GND
White
Dim (+)
Dim (-)
Purple
+ +
- -
Gray / Pink
Green
120–277 VAC Input
0–10 V Dimming
Installation Instructions
1. Install suspension hooks (not provided) 22”or 44”
apart on ceiling. Ensure that mounting hooks can
support weight of xture.
2. Hang suspension chains on the suspension hooks.
3. Attach the v-hooks into the holes on each side of the
xture.
4. Hang the xture by hooking suspension chains onto
v-hooks as shown.
5. Remove screw from wire access plate to
make connections.
22” or 44”
1.
2.
3.
22” or 44”
1.
2.
3.
/