Hubbell Premise Wiring HWS777318 Installation guide

Type
Installation guide
Hubbell Premise Wiring, HUBBELL INCORPORATED (Delaware)
23 Clara Dr., Mystic, CT 06355 (800) 626-0005, Fax (860) 535-8328
www.hubbell-premise.com
Control No. Page of
Rev. Date: Hubbell Premise Wiring Instruction Sheet
®Control No. Page of
Rev. Date:
HwS77731801 1 4
4 11/16/16
HwS77731801 4 4
4 11/16/16
VMxx VERTICAL ORGANIZER
SHT: 3 OF 4 DR. NO. HWS777318 Rev 4
1
5
FIGURE 1
FIGURE 7
FRONT AND REAR CABLE MANAGER INSTALLATION
MOUNTING ORGANIZER TO RELAY RACK
1) Place Cable Organizer (Item 1) next
to Relay Rack (sold separately).
2) Align the holes on the side of the
organizer with the holes on the rack.
3) Secure in place using 1/2" bolt, nut,
and lock washer (Items 5,3,4 in
Figure 1).
4
3
5
1
2
1
543
6
7
8
8
1
Rear cage option shown.
Back to back cable managers' option shown.
C
9
4
54
STEP 1
Assemble bolt, at washer & nut (10,4,9) to one
organizer as shown - 2 on top & 2 on the bottom
(see gure 8).
STEP 2
Assemble second vertical channel to the rst with
lock washer & nut as shown (see gure 8).
STEP 3
Assemble the 2 vertical channel assembly to the
one set of mounting holes on the relay rack (see
gure 1).
FIGURE 8
10
DESCRIPTION
FRONT VERTICAL
MANAGER
FRONT VERTICAL MANAGER WITH
GATES AND SPOOLS
FRONT VERTICAL MANAGER
WITH REAR CAGE
FRONT AND REAR
CABLE MANAGER
ITEM VMx10 VMx13 VMx18 VMx20
QTY QTY QTY QTY
1CABLE MANAGER 1 1 1 2
2DOOR 1 1 1 2
31/2-13 X 1.00 HEX HEAD BOLT 4 4 4 8
41/2-13 HEX NUT 8 8 16 16
51/2" LOCK WASHER 4 4 4 8
6CABLE MANAGEMENT GATE N/A 4N/A N/A
7CABLE MANAGEMENT SPOOL N/A 20 N/A N/A
8REAR CAGE N/A N/A 1N/A
91/2" FLAT WASHER 4 4 4 8
10 1/2-13 X 1.50 BOLT 4 4 4 8
Control No. Page of
Rev. Date:
Control No. Page of
Rev. Date:
HwS77731801 2 4
4 11/16/16
HwS77731801 3 4
4 11/16/16
1
3
3
45
45
2
3
FIGURE 2A FIGURE 2B
FIGURE 4 FIGURE 5
GATE INSTALLATION (IF APPLICABLE)
ATTACHING AND OPERATING THE DOOR.
With both door handles in the "up" position, align the
4 clips, that are on the door (top and middle), with the
rungs on the organizer as shown (Fig. 2A) and press.
With the door handles still in the "up" position, slide the 4
white plastic hinge cones that are attached to the door (1
pair is just below the 2 top clips and the other pair is near
the bottom of the door), onto rungs while sliding the door
handles down. (Fig. 2B).
TO OPEN: Lift up on either handle and swing out.
TO CLOSE: Lift up on either handle and swing close,
then release handle into "down" position.
4ATTACHING THE CABLE MANAGEMENT SPOOLS
FIGURE 6
B
C
D
BOTH HANDLES IN
"UP" POSITION
BOTH HANDLES IN
"DOWN" POSITION
UP
FIGURE 3A
FIGURE 3B
"UP"
DETAIL OF 1 RUNG
& 1 HINGE CONE,
SHOWN WITH DOOR
HANDLES IN "DOWN"
POSITION
  • Page 1 1
  • Page 2 2

Hubbell Premise Wiring HWS777318 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI