Midmark European Assistant's Unit Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Midmark European Assistant's Unit Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
English - 1
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
003-2310-99 Rev. D (5/3/13)
European Assistant’s Unit: Elevance™ / Procenter
Console Mounted Installation
Language of origin: English
Console
Cover
LH
Mount
Stop
Pin*
Bottom
Screw
Magnet
Leveling
Set
Screw
Mounting
Screw
RH
Mount
*Note:
The stop pin is factory set for a LEFT side mounted console
(patient’s left). Only move the stop pin if you are installing a
RIGHT side mounted console.
Console
Faceplate
Fit lip under
console frame
and secure with
screw on bottom.
Fit lip under console
top, then push ball
studs into ttings in
frame.
Elevance Console
Procenter Console
Console
Cover
Console Side
Cover
Console
Side
Cover
Ball
Stud
Step 1: Install assistant’s unit on console.
A) Raise chair to a comfortable working height.
B) Disconnect power from chair.
C) Remove console side cover (magnetic on Elevance).
D) Loosen bottom screw and remove inside console cover.
Procenter console only: loosen two screws and slide off faceplate.
E) Install three leveling set screws.
F) Install three mounting screws.
G) Position mounting arm straight out from console.
H) Rotate ADAPTER clockwise before loosely installing mounting screws.
Do Not Tighten mounting screws.
WARNING
Always disconnect power before removing covers. Failure to do so may result in personal injury.
Style G
English - 2
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
Assistant’s
Umbilical
Step 2: Route the assistant’s umbilical into the console.
Note: Take care not to kink the umbilical.
Vacuum
Line
Leveling
Screw
Mounting
Screw
Elevance ConsoleProcenter Console
Step 3: Level the console mount arm.
A) Adjust the three leveling screws until arm is level.
B) Tighten the mounting screws.
Style G
English - 3
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
Tubing connections
Water (blue)
Yellow (air)
Curing Light (red
and black wires)
Optional
Vacuum
Power
Console
Cover
Vacuum
Tubing
LIN Line
LIN Coupler
Console
Cover
Caution
Connect gound wire to ensure system ground continuity
Failure to do so may result in electric shock.
Step 4: Make electrical connections inside console.
A) Position electrical connections where the console cover can be installed
over them and screw ground wire to console frame.
B) Adhere LIN coupler inside console with velcro strips. Connect LIN lines
from chair and assistant’s unit.
C) Connect vacuum power to relay harness in the chair umbilical.
Elevance Console
Procenter Console
Ground Wire
Style G
Color Page
English - 4
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
Note
Tubing and connectors are provided for connecting a
delivery unit and an assistant’s unit. Leave connectors
capped if you are not installing these components.
An additional 1/8" piece of blue tubing is provided that can
be used to connect to a city water supply.
Step 5: Connect like colored tubing for all installed components.
Standard Water Bottle System
OPTIONAL Water Selector Switch System
DA138100i
Elevance Console
Procenter Console
For Procenter Only
Step 5a: Cut 1/8” yellow tubing. Insert T-Fitting. Connect to
1/8” yellow tubing from European Assistant’s Unit.
For Procenter Only
Step 5b: Connect European Assistant’s Unit vacuum
tubing to 3/4” ribbed gray vacuum line from
umbilical.
In J-Box (not shown): Connect 3/4” ribbed
gray vacuum line from umbilical to facility’s
central vacuum line.
For Procenter Only
Step 5c: Remove plugged section of blue tubing.
Connect to 1/8” blue tubing from
European Assistant’s Unit
Style G
Color Page
English - 5
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
4
0
60
8
0
1
0
0
20
0
1
2
3
5
6
7
4
0
Step 6: Make connections in J-Box.
A) Remove J-box lid. Connect relay harness to the vacuum power relay box (located in the
installation hardware kit).
B) Have an electrician connect facility power to the vacuum relay box and place relay box inside
the J-box.
C) Connect tubing to facility air and water supplies as shown.
Relay Box
Equipment Alert
Reference product specifications in
the European Assistant’s Unit User
Guide for electrical requirements for
the vacuum.
Facility Power
for Vacuum
Step 7: If no other components are to be installed, finish installation by installing covers.
A) Install J-box lid to cover all tubing and wiring connections.
B) Install console side covers. (Refer to Step 1.)
Note: Be careful not to pinch or kink tubing or wires when installing covers.
Relay Harness
Style G
Color Page
English - 6
© 2011 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
midmark.com
Installation Checklist
Test Verify the following:
1
Mounting arm and assistant’s unit are level, rotate
and move easily.
2
Air and water work at syringe. Flow control knobs
adjust flow as expected.
3
Vacuum instruments work as expected.
Solids collector basket is in place.
4
Wipe console and assistant’s unit with a soft dry
cloth to remove dirt or smudges.
5 Curing light (optional) works.
Step 8: Connect chair to power supply.
A) Connect power supply to facility power.
B) Verify operation of the European assistant’s unit.
Air Water
Air Water
Flow Control
Knobs
Solids Collector
HVE
Saliva
Ejector
Vacuum
Optional Curing
Light
Syringe
HVE
Style G
/