Fläkt Woods 9291 GB 2014.12.05 1 Specifications are subject to change without prior notice.
Installation and maintenance instructions
Installation instructions, drive system
EQRB, L=3.4 sizes 005-072
General description
A speed controlled drive system specifically adapted to
drive rotary heat exchangers.
No tuning is necessary. All control inputs are galvani-
cally isolated from the mains. The unit is supplied with
the motor.
The direction of rotation of the motor is reversible.
Enclosure class IP54.
Safety precautions
Control system for rotary heat exchanger EQRB, L=3,4
Sizes 005-018
Sizes 020-072
Important!
– Read through the entire instruction
manual carefully before unpacking,
installing and using the equipment.
– The installation must be carried out
by authorised personnel.
– Follow the general measures and
regulations for the installation and
operation of electrical installations.
– Follow local measures and regula-
tions to protect against personal
injury and mechanical damage.
– The drive system is intended for
permanent installation.
– Cables must not be connected or
disconnected while the power supply
is on.
– Check that the equipment is correctly
connected before it is taken into
operation. See the instructions under
“Connection specification”, page 2.
– Faults occurring due to incorrect
installation or operation are covered.
During operation
– The unit may not be opened or disas-
sembled during operation.
Disassembly and disposal
– The product is designed to comply
with the RoHS directive and must
be handled and recycled in accordance
with locally applicable legislation.
Regarding the control logic and operation:
During start up and after each time
the AHU has been stopped, it is recom-
mended that the exhaust fan operates
during 1 minute before the supply fan is
started.