CREE LIGHTING VG Series Parking Structure Surface-Direct Installation guide

Type
Installation guide
VG Series
LED Parking Luminaire
Surface Direct Mount (DM)
1 of 2 LPN00100X0005A0_D
INSTALLATION INSTRUCTIONS
INSTRUCTIONS D’INSTALLATION
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should always be
followed including the following:
READ AND FOLLOW ALL SAFETY
INSTRUCTIONS
1. To reduce the risk of electrical shock, turn o power supply before
installation or servicing.
2. This luminaire must be installed in accordance with the NEC or your local
electrical code. If you are not familiar with these codes and requirements,
consult a qualied electrician.
3. DO NOT lift luminaire by the supply cord.
SAVE THESE INSTRUCTIONS FOR
FUTURE REFERENCE
TO INSTALL:
LUMINAIRE INSTALLATION
STEP 1:
Using customer supplied hardware
attach mounting plate to ceiling with the
arrow on the underside of the Mounting
Plate directed parallel to vehicle traffic.
Ensure that the ceiling is capable of
supporting the weight of the luminaire.
See Figure 1 and 2.
STEP 2:
Bring luminaire up to Mounting Plate,
rotate luminaire until the arrow on the
inside of the Mounting Plate points to
the recessed area nearest to the latch
on the luminaire. See Figure 3.
STEP 3:
Attach luminaire to the Mounting Plate
by pressing up on the luminaire until the
slots on the Mounting Plate engage with
the clips on the luminaire and rotate
until latch locks securely. See Figure 4.
NOTE: May require extra pressure on
Mounting Plate to engage luminaire
clips into slots.
NOTE: If the Mounting Plate slots
become deformed during installation,
slightly reopen the slots back up using
a screwdriver to ensure proper install of
luminaire.
STEP 4:
Install a suitable Listed liquid tight cord
strain relief bushing in the customer
supplied junction box, and feed the
luminaire’s supply cord through it.
STEP 5:
Connect the cord to the supply wiring
per the “Electrical Connections
section.
4
Slots
Slots
Luminaire
Clips
Latch
Arrow
Mounting Plate
3
Tamperproof
Screw
Latch
1
Underside View of
Mounting Plate
2
Arrow On Mounting Plate
Pointing Parrallel To
Traffic
Surface Direct
Mounting Plate
Luminaire
Supply Cord
2 of 2 LPN00100X0005A0_D
www.creelighting.com
© 2023 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content is
subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree® and the Cree Lighting logo are
registered trademarks of Cree, Inc.
The Bluetooth® word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks is
under license. Other trademarks, service marks, and trade names are those of their respective owners. IOS is a registered
trademark or trademark of Cisco Systems, Inc. and/or its affiliates in the United States and certain other countries. Android
is a trademark of Google, Inc.
STEP 6:
Lightly pull on the luminaire to verify luminaire is securely mounted.
BLUETOOTH® TECHNOLOGY ENABLED MULTI-LEVEL SENSOR
(OPTIONAL)
The 8’ to 20’ sensor lens comes installed on the sensor on these luminaires.
A 20’ to 40’ sensor lens and aisle shroud is included in the hardware bag.
To change the lens, unscrew the existing lens, remove the shroud from the
replacement lens and screw the new lens back on to the sensor. If aisle
lighting is required, the shroud should be added to the appropriate lens.
For Sensor information please visit the Leviton website, www.Leviton.com
and search on ZLDxZ-xxx/OFDxZ-xxx.
Configuration is made using the Leviton Smart Sensor App from a
smartphone or other Bluetooth® enabled Android or iOS device. The Smart
Sensor App can be downloaded from either Goggle Play or Apple Store.
FIXTURE SERVICING AND MAINTENANCE
STEP 1:
If luminaire needs to be removed, fully loosen the tamperproof screw and
slide out the latch. Then, rotate luminaire to disengage from Mounting Plate.
See Figure 5.
STEP 2:
To re-install luminaire, engage and tighten the latch’s tamperproof screw
and follow Step 1-4 in “Luminaire Installation” section above.
5
Latch
Tamperproof
Screw
ELECTRICAL CONNECTIONS:
NOTE: Luminaires with BML sensor will have the dimming leads capped
off. Keep the dimming leads on these luminaires capped off.
STEP 1:
Make the following Electrical Connections :
a. For 120/277/347V connect the black fixture lead to the voltage
supply position of the junction box (Hot 1 for 208/240/480V
wiring).
b. For 120/277/347V Connect the white fixture lead to the neutral
supply position of the junction box (Hot 2 for 208/240/480V
wiring).
c. Connect the green or green/yellow ground lead to the green
wire position of the junction box.
d. If Dimming is an option; connect the violet dimming positive
lead to the supply dimming positive lead.
e. If Dimming is an option; connect the pink dimming negative
lead to the supply dimming negative lead.
LINE
OR HOT 1
GREEN
LINE-BLACK
GROUND-GREEN
NEUTRAL-WHITE
DIM (-) PINK
DIM (+) VIOLET
NEUTRAL
OR HOT 2
VIOLET
PINK
SUPPLY WIRING
(DIMMING OPTIONAL)
LUMINAIRE
JUNCTION
BOX
  • Page 1 1
  • Page 2 2

CREE LIGHTING VG Series Parking Structure Surface-Direct Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI