BLOTZ B28-SFC-008 Assembly Instructions

Type
Assembly Instructions
28mm Tower Walkway
B28-SFC-008
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and
remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in
place while you allow glue to dry.
Take the walkway floor and under section from
the sprue.
Also remove the four uprights.
Glue the floor sections together (ensuring the
notches align), then clip the uprights into place.
Add the handrails, ensuring they flare outwards at
each end.
Take the base and short side pieces.
Glue the side pieces into the base.
Glue the walkway into position.
Take the large sides pieces and “ceiling” from the
sprue.
Glue the “ceiling” inside the two large sides, with
the detail facing towards the bottom of the
model.
Glue this assembly to the model.
Take the outer roof pieces.
Note two are shorter than the others these go
at each end.
Starting with the central piece, glue each roof
section into position.
Take all the connector pieces.
Work around the roof, gluing them into place as
shown above.
Take the strips for the short sides.
Glue a pair into place on each short side.
The strips for each long side are shown above.
Glue them into place on each long side.
The completed model.
  • Page 1 1
  • Page 2 2
  • Page 3 3

BLOTZ B28-SFC-008 Assembly Instructions

Type
Assembly Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI