BLOTZ B28-ME-006 Assembly Instructions

  • I have analyzed the provided instructions for the 28mm Middle Eastern Building B28-ME-006. It details the assembly process, from removing the components from their sprue to the final placement of the roof. I'm ready to assist with any questions you might have about the building described in this manual.
  • What glue is required?
    What tools are needed?
    Can I use something to hold parts while the glue dries?
28mm Middle Eastern Building #6
B28-ME-006
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and
remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while
you allow glue to dry.
Remove the four walls and base from the sprue.
Glue them together as shown to form an open topped
box.
Take the roof supports as shown above.
Glue them into place so that they extend through the
wall (see pic).
Glue the door into position.
Place (do not glue) the roof into position, then glue the
trapdoor to it.
The completed building.
/