IS0564 REV. B 2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 1 of 4
Luminaires must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
3b
id+ high ceiling 6" square
FL66H
x4
key
power off power on
level attention
611/16” min
63/4” max
611/16” min
63/4” max
1
non-emergency
see additional instructions
LUMINAIRE MUST BE INSTALLED PRIOR TO DRYWALL CEILING.
ALL LUMINAIRES MUST BE SECURED TO STRUCTURE ABOVE.
emergency - remote test switch
downlight wall wash
REMOVE ZIP TIE
PRIOR TO INSTALLATION
5x4
WALL
wall wash orientation
trim
x2
secure to structure aBove with 1/4 x 20
threaded rod or tiewire (By others)
GRID - 1/2" CONDUIT & CLIP (BY OTHERS)
X2
2
X2
3a
LOOSEN SCREWS TO ADJUST HEIGHT OF HOUSING
4