MULTIPLEX Bulk C02 Controls for Back-up Bag-In-Box Kit - EI215509 Installation guide

Type
Installation guide

This manual is also suitable for

In accordance with our policy of continuous product development and improvement,
this information is subject to change at any time without notice.
EI215509 Revision A (JMT/KAZ) 12/03/97
Manitowoc Beverage Equipment
2100 Future Drive Sellersburg, IN 47172-1868
Tel: 812.246.7000, 800.367.4233 Fax: 812.246.9922
www.manitowocbeverage.com
Foodservice Group
Equipment Installation Instructions for
CO2 Control Kit
(P.N. 00215509)
High Pressure Regulator Assembly (2)
Control Panel
CO2 Gas Line (2) with Swivel Nut Fittings
2
EI215509 Revision A (JMT/KAZ) 12/03/97
Equipment Installation Instructions
Medium Pressure
Regulator
Gas Line to #1 CO2
Tank or Bulk
Gas Line From “A”
Carbonator
Gas Line From “B”
Carbonator
Gas Line to #2 CO
2
Tank
To Bag-In-Box
Pumps
Copper Tube
Caution
DO Adhere to all National and Local Plumbing and
Electrical Safety Codes.
DO Turn “off” incoming electrical service switches
when servicing, installing, or repairing equip-
ment.
DO Check that all flare fittings on the carbonation
tank(s) are tight. This check should be per-
formed with a wrench to ensure a quality seal.
DO Inspect pressure on Regulators before starting
up equipment.
DO Protect eyes when working around refrigerants.
DO Use caution when handling metal surface
edges of all equipment.
DO Handle CO
2 cylinders and gauges with care.
Secure cylinders properly against abrasion.
DO Store CO
2 cylinders in well ventilated areas.
DO NOT Store CO2 cylinders in temperature above
125°F (51.7°C) near furnaces, radiator or
sources of heat.
DO NOT Release CO2 gas from old cylinder.
DO NOT Touch Refrigeration lines inside units, some
may exceed temperatures of 200°F (93.3°C).
Installing CO2 Control Kit
(see cover illustration and figure 1 below)
1. Position the CO2 Control Panel on an appropriate mount-
ing surface about 5 ft from the beverage syrup supply.
Mark the mounting holes at top and bottom of the panel
and secure the panel with wood screws provided or with
alternative fasteners.
2. Route the 20 ft line from the Pressure Regulator and at-
tach it to the Bag-In-Box pumps.
3. Install the High Pressure Regulators on the CO
2 tanks.
Connect the CO
2 gas lines to the High Pressure Regula-
tors. Attach the opposite ends of these lines to the CO
2
Changeover Valve (refer to figure 1). Do not turn “on”
CO
2 Tank Regulators at this time.
4. Connect the CO
2 gas supply line to the cross fitting on
the Control Panel Changeover Valve assembly.
5. Connect the copper tube from the cross fitting to the
Pressure Regulator as shown below.
6. Check for leaks.
Figure 1
Optional Low
Pressure Regulator
  • Page 1 1
  • Page 2 2

MULTIPLEX Bulk C02 Controls for Back-up Bag-In-Box Kit - EI215509 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI