Danfoss SpeedUp Wall Heating in Wet Systems Installation guide

Type
Installation guide
1
Instruction
Danfoss Heating VIETC102 Heating Solutions
Installation of SpeedUp Wall Heating in wet systems
1 2
Attach the perimeter insulation using a stapler. Start with header and blank panels according to layout plan. Attach the
individual panels horizontally to the wall using material resistant adhe-
sive (PU foam), supply should enter at the bottom..
3 4
The pre-formed break points mean that the system elements can easily
be shortened longitudinally and laterally.
Fill boundary and electrical areas with blank panels.
5 6
Individual pipe channels can be cut out with the hot wire cutter, ensuring
that a wide arc is used.
Drill at least 8 holes for wall dowels (70 mm) per m
2
and attach bottom
section of dowel.
Produced by Danfoss A/S © 06/2010
VIETC102
7 8
Starting from the supply point at the bottom, press the composite pipe
into the channels.
Attach reinforcement grid from top to bottom, lightly tensioned and
with 10 cm overlap, using the dowel upper section.
9 10
Before applying the plaster carry out the required pressure test to at
least 6 bar, according to the test report.
The 15 mm thick single plaster layer can be smoothed or matted as
required.
Instruction Installation of SpeedUp Wall Heating in wet systems
  • Page 1 1
  • Page 2 2

Danfoss SpeedUp Wall Heating in Wet Systems Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI