© 2021
Step 1 of 1
Order #XXXXX
Locked layer contains
placeholder marks.
Completed Assembly
Item
1,1A
2,2A
3,3A
4,4A
5,5A
6,6A
7
Qty.
1,1
1,1
1,1
1,1
1,1
2,2
2
Description
38” CEI152 Horizontal Extrusion
38” CEI152 Horizontal Extrusion
38” CEI152 Horizontal Extrusion
47.5” CEI152 Vertical Extrusion
47.5” CEI152 Vertical Extrusion
45.677” Z45 Vertical Extrusion
Base Plate
Steps:
1) Assemble CEI152 extrusions together, flat on floor. See CEI152 Frame Assembly
sheet, for instruction.
2) Connect extrusions [6] and [6A] together. See Z45 Straight Connection detail.
3) Attach [6/6A] assemblies into assembled CEI152 frame. See Z45 Attachment detail.
4) Attach base plates to [1/4] and [3/4A]. See Base Plate Attachment detail.
5) Install SEG graphic to front and blocker fabric to back of assembled frame.
See SEG Graphic Installation sheet for instruction.
6) Attach monitor mount to extrusions [6A]. See Monitor Mount Attachment detail.
*
**
*
*
123
1A
5
4
5A
4A
6A
6
7
7
6A
6
2A 3A
*
Base
Plate
Bolt
Fixed Bolt
Bolt
Vertical
Extrusion
Horizontal
Extrusion
Base Plate Attachment
Place key hole over fixed bolt on
assembled frame, then slide down.
Secure with bolts, washer, and wing nut.
Washer
Wing Nut
Key Hole
Z45 Straight Connection
*
PR53
Connector
Z45 Z45
Insert connector into extrusions.
Secure with set screws.
Set Screw
To prevent product loss, keep all
screws attached to connector
after disassembling.
Keep connectors attached to [6], when packing.
CEI-152
Z45
Z45 Attachment
Attach Z45 vertical to middle
groove of CEI-152 horizontal.
*
F
r
o
n
t
o
f
F
r
a
me
**
**
Vertical Extrusion
Monitor
Mount
Standoff
Screw standoffs into vertical extrusions. Attach
monitor mount to standoffs, using caps
Standoffs attach through SEG graphic.
*Monitor Mount Attachment
Cap
SEG Graphic
Backwall Assembly