Instruction
Installation of Strongboard for carpets and synthetics for SpeedUp
1 2
Cut SpeedUp perimeter insulation along the support battens. Install
a vapour barrier above the SpeedUp panels if necessary.
Once acclimatised for 2-6 days begin installing the strongboard.
Cut off the tongue that meets the wall.
3 4
Keep a 10 mm distance from the wall using wooden wedges. Cut the strongboard with circular saw (universal blade) and use rest
pieces of more than 40 cm at the beginning of the next row.
5 6
In large rooms - 8m length/width - a movement joint is necessary.
Support with support battens and cover with transition profile.
Join the boards using the tongue and groove.
Produced by Danfoss A/S © 04/2009
VICSH202
7 8
As the Strongboard system settles the tongue and groove mechanism
click into place.
With a mallet and a wooden block give a gentle tap to the short ends.
9 10
Seal the floor immediately after laying and leave to dry for 24 hours. It is possible to lay carpet or a suitable synthetic product after 24 hours.
Instruction Installation of Strongboard for carpets and synthetics for SpeedUp
  • Page 1 1
  • Page 2 2

Danfoss Strongboard for carpet and synthetics Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI