Danfoss Strongboard for carpet and synthetics Installation guide

Type
Installation guide
1 2
3
4
5 6
7 8
9
10
Instruction
Strongboard Carpet and Synthetics
With SpeedUp
Installation of the load bearing panels
Strongboard Carpets and synthetics
1
Cut SpeedUp perimeter
insulation along the support
battens. Install a vapour
barrier above the SpeedUp
panels if necessary.
2
Once acclimatised for
2-6 days begin installing
the strongboard. Cut off the
tongue that meets the wall.
3
Keep a 10 mm distance
from the wall using wooden
wedges.
4
Cut the strongboard with
circular saw (universal blade)
and use rest pieces of more
than 40 cm at the beginning
of the next row.
5
In large rooms - 8m
length/width - a movement
joint is necessary. Support
with support battens and
cover with transition profile.
6
Join the boards using the
tongue and groove.
7
As the Strongboard system
settles the tongue and groove
mechanism click into place.
8
With a mallet and a
wooden block give a gentle
tap to the short ends.
9
Seal the floor immediately
after laying and leave to dry
for 24 hours.
10
It is possible to lay carpet
or a suitable synthetic product
after 24 hours.
Danfoss HES VI.CS.H1.02 © Danfoss 11/2008 1
  • Page 1 1

Danfoss Strongboard for carpet and synthetics Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI