Herman Miller My Studio Environments Product Instructions

Type
Product Instructions
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
My Studio Environments
Streetside Curved Frame
Installation
A1BKLV RLS FOR PROD MEK KF 12/27/04
INSTRUCTIONS-
STREETSIDE CURVED FRAME INSTALLATION
MAKE FROM 115160
MEK 12/27/04 KF 12/27/04
KF 02/15/07 KF 12/27/04
15
1B1R4F
1B1R4F
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
ADDED VIEW TO STEP 1 MEK KF 4/11/06
1BSFFB
C 1BSKR REV PROD NAME MEK PG 4/21/06
D 1BTMV ADDED PARTS L, M, N, 0, P
& SH 5 MEK KF 07/18/06
E 1BVBZ L WAS H ON PAGE 5 NKS KF 09/11/06
F1BWNK
REV PARTS B, C & STEP 1
PIX; RMV CLADDING
RETAINER I; ADDED
SCREW I MEK KF
12/13/06
G1BXKX ADDED PART Q; REV STEP 1 MEK KEF 02/15/07
H1C4PH REMOVED PARTS F,H, J & K RB GD 9/02/08
J1C61K REMOVED PART Q RB GD
10/29/08
1B1R4F REV J
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
My Studio Environments
Streetside Curved Frame Installation
Tools Required:
Tube Assembly
5/16 Allen Wrench
Parts Included:
A
Screw (6)
Tube Joint
Connector (3)
EGI
Curved Tube (2)
B
Curved Tube
C
Hardware Pack
Draw Rod (3)
D
Torque Wrench5/32 Allen Wrench 5/16 Hex Socket
Screw (3)
Screw
O
Curve Top Cap
L
Screw Cap
N
End Cap
P
Attachment Rod
M
46” Only
46” only 46” only 46” only
46” only
46” (1)
46” (2) 46” (4) 46” (2) 46” (2)
1
2. Insert Curved Tube ends into Wall Frame.
3. Secure Curved Tubes to Wall Frame with Screw (I).
B
B
C
Wall Frame
I
Bracket
(Not Used
for 46”)
I
Bracket
1. Snap Screw (I) into Curved Tube Brackets.
IMPORTANT: Save these instructions for layout changes.
1B1R4F REV J
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
2
1. Assemble (3) or (2 for 46”) Tube Connectors onto Curved Tubes.
A
GD
2. Secure Tube Assembly to Curved Tubes with (3) or (2 for 46”)Draw Rods.
Tighten to 150 in-lbs.
34
1. Install Cladding. See Cladding installation
instruction 1B2H19 for details.
E
1. Install 2 Screws into Tube Connectors
3 (or 2 for 46”) places.
1B1R4F REV J
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
5
1. Insert Bottom Attachment Rod, into edging on
Lower Panel and through Cladding Retainers.
Cladding
Retainer
Note: See step 8 for 46” product.
Bottom Attachment Rod
1. Install Cladding Bracket by inserting Post on Bracket into opening in Tube connector.
7
2. Install Screw into end of Bracket 3 places.
Opening
Post
Hook
6
1. Insert Top Attachment Rod into edging on Curved Upper
Panel and through Cladding Retainer. Hook end of Rod
over edging.
Note: See step 8 for 46” product.
Top Attachment Rod
Cladding Bracket
Screw
1B1R4F REV J
2008 Herman Miller, Inc., Zeeland, Michigan Printed in U.S.A.
, Abak, Action Office, Avive, Co/Struc, Ethospace, Intersect, Meridian, Passage, Prospects, Quadrant, Resolve, Scooter, Vivo interiors, and V-Wall are among the
registered trademarks of Herman Miller Inc.
Burdick Group, CLT, Flex-Edge, My Studio Environments, Lifework, Q system, and Teneo are among the trademarks of Herman Miller Inc.
Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications
at any time, without notice, and also to discontinue products.
©
®
10
1. Place End Cap (P) into end of Tube.
2. Insert Screw Cap (N) into End Cap and Curve Top Cap.
3. Install Screw (O). Torque Screw to 80 in-lbs.
1. Install Tube Plug and Flat Cap supplied with Frame.
11
PNO
Tube
Flat
Cap
Plug
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Herman Miller My Studio Environments Product Instructions

Type
Product Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI