1B267D REV C
My Studio Environments™ Secondary Surface Support
Installation
Tools Required:
Power Driver
Leg Support
Main Support
Post Support
Hardware Pack
3/16 Hex Bit
Parts Included:
B
C
D5/8” Long Cap
F1 3/4” Long Flange 7/8” Long Flange
3/16 Hex Key
Screw (4) Screw (9) Screw (8)
GH
End Support (2)
A
Level
Counter Top Support
1. Position End Support between Side Wall Frame and Wall Cladding.
2. Measure from floor to top edge of End Support for desired worksurface height.
3. Install (2) 5/8” long Cap Screws. DO NOT TIGHTEN!
AF
4. Repeat process at other end of Side Wall.
NOTICE!
Make all electrical connections and
before installation.
Notch
NOTE: For Work Surfaces being installed at 28 1/2”, install End Support with the top
Screw mounted in hole with notch in Side Wall Frame.
install lower Cladding inside office area
IMPORTANT: Save these instructions for layout changes.