quadient iX-1 PSD User guide

Type
User guide
Ensure the machine is in sleep mode. The
power indicator light will be amber.
iX-1 Series
Meter Replacement
Procedure
A1. Remove the meter from your mailing system
A2. Unpack and insert your replacement meter
Remove replacement meter from box & place
original meter back into box.
Next
Swap PSD
This process helps you to install a
new PSD
Follow the screen prompts to complete the
swap procedure.
In an appropriate sized box, securely pack the old Postage Meter. Close box securely; ax the authorized shipping
label provided by Quadient USA. Return the meter and any corresponding equipment to the Quadient USA Return
Center. Retain a copy of the tracking number(s) for your records. If you fail to return the equipment within ten
business days, you will be charged the full replacement value of the equipment.
For questions, please call: 1-800-636-7678
3
A3. Switch on the mailing system
Your system is ready to use!
A0151823/A
27/07/2022



The
meter
die
number
is here
For more information or if you experience any
issues please visit : kb.quadient.us/ix1
2
Ensure the power indicator light is green. If
amber, press the power button to wake
up the mailing system.
Remove the meter.
4
Turn the mailing system on its back.
Open the meter cover located under the
mailing system.
3
2
Insert the new meter into the mailing
system, by positioning it vertically, with
the contacts down and facing to the
rear, with the labels towards you. Close
meter cover.
2
Contacts
1
Unplug the mailing system from the wall.
1
Plug the mailing system to the wall.
1
meter
Mailing System Base
prepaid shipping
label
  • Page 1 1

quadient iX-1 PSD User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI